Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Enforcement No. 2026-15769– Notice to Proceed with Compliance Plan and Schedule (Plan) for Pipe Removal and Site Restoration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Central Valley Flood Protection Board is enforcing compliance for Enforcement Case No. 2026-15769, requiring the removal of an unauthorized 8-inch diameter PVC pipe installed through the right bank of the Mormon Slough levee near Linden, California, at Levee Mile 3.57. The corrective action involves excavating the levee to a depth of 8 to 12 feet, completely removing the pipe, and restoring the structure to its original conditions using native, moisture-conditioned soil placed in 4- to 6-inch lifts and compacted to verified standards. Compaction testing must be conducted at every 1-foot interval throughout the backfill process to ensure integrity, followed by the installation of a 4-inch aggregate base on the levee crown. No expansion of use or new development is associated with this work, and the project qualifies for categorical exemptions under the California Environmental Quality Act (CEQA) as an enforcement action (Class 21), involving existing facilities (Class 1), and minor alterations to land (Class 4). The responsible party for executing the work is John Dondero, who must adhere to site-specific technical requirements without reliance on external standards like ASTM or AASHTO. The project is administratively managed by Senior Environmental Scientist Angela Nguyen-Tan, and the Notice to Proceed was issued on July 15, 2026, following a posted notice on July 16, 2026. The work is confined entirely to the designated levee location in San Joaquin County, with acceptance occurring on-site under the oversight of the Central Valley Flood Protection Board. There is no solicitation or contract number, no identified pricing or contract value, no formal contract type, and no procurement competition; the action is a regulatory directive implemented under environmental compliance authority. Submission of the Compliance Plan and Schedule must be mailed to the State Clearinghouse in Sacramento, though no formal deadline, page limits, or electronic submission requirements are specified.

General Info

Remove unauthorized PVC pipe from levee, restore with compacted native soil, comply with CEQA exemptions, overseen by Central Valley Flood Protection Board.

Agency

California → Central Valley Flood Protection Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

NTP 15769 Notice of Exemption for Pipe Removal and Site Restoration

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Angela Nguyen-TanSenior Environmental Scientist
John DonderoSenior Environmental Scientist

Full Description

Show more
Approval and implementation of a Plan for Enforcement Case No. 2026-15769 to remedy installation of an unauthorized 8-inch diameter PVC pipe through the right bank of the Mormon Slough project levee. The corrective work consists of excavating the levee 8 to 12 feet deep, fully removing the pipe, then restoring the levee to pre-project conditions using the native, moisture-conditioned soil for compacted backfill in 4 to 6-inch lifts. Lastly, the levee crown will be restored with 4 inches of aggregate base. Compaction tests are planned to be taken at every 1 foot interval. No expansion of use or new development is proposed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 8 hours ago

DEADLINE

in 29 days
View Details