Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Florida was posted on September 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F.E. Myers Submersible Grinder Pump Supplier

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423820
New
International
Fourniture d’équipements de production agricole et d’outils aratoires (4 lots) en République Démocratique du Congo This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta lic
Solicitation # RFQ/2026/65401
The United Nations Office for Project Services (UNOPS) is soliciting bids for the supply of agricultural production equipment and tillage tools to support the PABEA project in the Haut-Katanga and Lualaba provinces of the Democratic Republic of Congo. The procurement is organized into four distinct lots: agricultural production equipment for Haut-Katanga (Lot 1) and Lualaba (Lot 2), and tillage tools for Haut-Katanga (Lot 3) and Lualaba (Lot 4). Key items include tunnel greenhouses, rotary hoes, drip irrigation kits, and welding stations. All goods must be new, defect-free, and specifically adapted to the climatic conditions of the DRC, with technical documentation provided in French and manuals in English. Contracts will be awarded to the lowest-priced, technically compliant bidder. Delivery is required within 30 calendar days of contract signature or purchase order receipt, following DAP Incoterms 2020 to designated CPEJAB warehouses in Kipushi/Muntumpeke and Komesha III. Bidders must submit their proposals electronically via the UNOPS eSourcing portal, including a declaration of eligibility and detailed technical specifications. Payment is typically issued within 30 days following the receipt of goods and required documentation. The contractor is further obligated to adhere to strict confidentiality and personal data protection standards throughout the duration of the agreement.
UNOPS

POSTED

4 days ago

DEADLINE

N/A

AI Contract Overview

Show more

This subcontract agreement establishes the supply of F.E. Myers brand submersible grinder pumps for prime contractors working on Town of Davie procurement projects under the Utilities agency. The scope of work specifically involves the procurement and delivery of WG30-21-35 and WG30-23-35 pump models, including the coordination of all freight and shipping logistics to the designated delivery sites. The supplier must maintain strict compliance with EPA and OSHA regulations, as well as Florida Statute Section 448.095 regarding E-Verify. This procurement effort falls under NAICS code 423820, with a response deadline set for October 14, 2026.

General Info

Subcontract for supplying F.E. Myers submersible grinder pumps for Town of Davie projects.

Documents

This scope was carved out of ITQ# CW-26-61.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ITQ-CW-26-61 Purchase of F.E. Myers Submersible Grinder Pumps

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Passenger Lift Parts and Components SupplyOpen now, due in 30 days
  • Supply and Delivery of HAMM HC 100i RollerOpen now, due in 15 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Utilities
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Utilities
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies F.E. Myers brand submersible grinder pumps for prime contractors on Town of Davie procurement projects. Procures and delivers F.E. Myers WG30-21-35 (3 HP, 230 Volt, 1 Phase, 35' power cord) and WG30-23-35 pump models. Coordinates freight and shipping to the delivery site. Requires compliance with Florida Statute Section 448.095 (E-Verify), EPA, and OSHA regulations. Delivers the specified submersible grinder pumps.

More opportunities from Florida → Utilities

Same awarding agency

NAICS: 237110
New
SLED
Manhole and Sewer Lateral Rehabilitation, As Needed
Solicitation # 26-T01400
Solicitation 26-T01400 is an indefinite quantity, firm fixed price term contract issued by the Hernando County Utilities Department in Florida for as-needed manhole and sewer lateral rehabilitation. The scope of work encompasses all labor, equipment, and materials required for cleaning, CCTV condition assessment, and rehabilitation of sanitary sewer laterals and main-to-lateral connections. Key technical requirements include the use of Cured-in-Place Pipe (CIPP) trenchless technologies to ensure a minimum 50-year service life, strict adherence to NASSCo PACP, LACP, and MACP inspection standards, and compliance with Hernando County Utilities Specifications Section 9 and Detail S-02. The anticipated annual spend is estimated between 350,000 and 600,000 dollars, though there is no guaranteed minimum or maximum expenditure. Qualified bidders must hold appropriate state or local licenses in Underground Utility and Excavation, provide three references from the past seven years, and ensure key personnel hold NASSCo certifications. The contract mandates a 10-year warranty for all manhole lining systems and requires comprehensive insurance coverage, including a 5 million dollar umbrella liability policy. Bids must be submitted electronically via the eProcurement Portal by November 30, 2026. Evaluation is based on price, completeness, compliance, and the bidder's resources, with a five percent point preference given to businesses located within Hernando County. Payment is processed via ACH within 45 days of invoice submission following County staff inspection and acceptance of the work.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 13 days
View Details
NAICS: 221320
New
SLED
Odor and Corrosion Control
Solicitation # 2027-006-JS
Solicitation 2027-006-JS is an Invitation to Bid issued by the City of Sarasota, Florida, seeking a licensed Florida General Contractor to provide installation, operation, and maintenance of odor control process equipment at various water and wastewater treatment facilities, including lift stations LS10, LS16, and LS40. The scope of work requires the contractor to furnish and deliver approximately 30,000 gallons of chemicals annually, perform at least monthly monitoring of all sites, and maintain a 24/7 emergency response capability with a two-hour window for odor complaints and a four-hour window for equipment failures. Key deliverables include the development of a service program for gathering hydrogen sulfide data and the repair or replacement of malfunctioning components within 48 hours of discovery. The contract will be awarded to the lowest responsible and responsive bidder based on price. Bidders must submit their responses electronically as a single consolidated PDF by December 3, 2026. Requirements for the awarded vendor include maintaining specific insurance ratings, providing a non-coercion affidavit, and ensuring all storage tanks are labeled according to local, state, and federal regulations. Pricing is requested for various line items, including ammonium calcium nitrate, Bioxide Plus 71, and the setup and routine maintenance of biofilters. All provided materials must be new, current standard production models, and the city reserves the right to reject any items reflecting unsatisfactory workmanship or damage.
Sewage Treatment Facilities

POSTED

4 days ago

DEADLINE

in 16 days
View Details
NAICS: 238220
New
SLED
Irrigation Filter Installation
Solicitation # 2027-Q-UT-005-SS
The City of Cape Coral is soliciting quotes for the installation of City-furnished cartridge filter assemblies, known as snail filters, at irrigation service locations throughout the city. These filters are designed to prevent debris and snail shells from clogging irrigation systems and causing equipment failure. The contractor is responsible for providing all labor, supervision, tools, equipment, transportation, and incidental materials required for installation, operation verification, and site restoration, including the disposal of existing assemblies. The City anticipates approximately 30 installations per month, and the contractor must complete each monthly request list within 30 days of receipt. Failure to meet this timeline results in liquidated damages of 100.00 dollars per uninstalled filter per calendar day. The contract term is for one year, with two optional one-year renewals. Award evaluation is based on respondent qualifications, compliance with requirements, and the ability to perform within the specified timeframe. Required documentation includes a current Business Tax Receipt, three completed reference survey forms, and a Scrutinized Companies Form. All payments are made via direct deposit (ACH) within 30 days of invoice receipt, though a P-Card program is available for faster payment. Contractors must adhere to strict safety and environmental standards, including OSHA regulations for confined spaces and protective measures for threatened Burrowing Owls. All responses must be submitted electronically via the OpenGov portal.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

4 days ago

DEADLINE

in 16 days
View Details
NAICS: 541330
New
SLED
Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
Solicitation # RFQ2026-2
The City of Cooper City, Florida, issued Request for Proposal RFQ2026-2 for the development of a comprehensive, grant-compliant Stormwater Master Plan (SWMP). The project, funded under FEMA Hazard Mitigation Grant Program (HMGP) Grant Agreement H1470, aims to improve the city's understanding of existing stormwater infrastructure, identify high-risk flooding areas, and establish a priority basis for future capital improvements to enhance flood resiliency and the National Flood Insurance Program Community Rating System score. The total project fee is estimated at 281,000 dollars, divided between the creation of a preliminary plan based on initial flood modeling and the finalization of the SWMP incorporating FDEM comments. Proposals were due by November 30, 2026, via the OpenGov Procurement Portal, with a contract award anticipated by December 15, 2026. The selection process involves a two-tier evaluation based on team qualifications, past experience, methodology, and a potential oral presentation. Awarded consultants must adhere to strict federal and state requirements, including the Davis-Bacon Act, OSHA standards, and Florida Local Government Prompt Payment Act. Key deliverables include a preliminary and completed SWMP, documentation of submittal to ISO/CRS, and a signed letter from the Broward County LMS Chairperson confirming the plan's inclusion in the Local Mitigation Strategy update.
Engineering Services

POSTED

4 days ago

DEADLINE

in 13 days
View Details
NAICS: 541330
SLED
Design, Installation, Maintenance and Repair of a Supervisory Control and Data Acquisition (SCADA) System.
Solicitation # 2026-007
The City of Zephyrhills is soliciting proposals for the design, installation, maintenance, and repair of a Supervisory Control and Data Acquisition (SCADA) system. The project focuses on standardizing the City's lift stations, potable water wells, and water tower locations using the Badger Meters (formerly SmartCover and Data Flow Systems) SCADA system. Key deliverables include 100% construction documents, estimated probable costs for civil design including permitting, and classroom-style training on basic SCADA software operation. The system must support various communication protocols, including MODBUS TCP. The contract features an initial three-year term with the option for two subsequent three-year renewals, with performance centered at 39421 South Avenue in Zephyrhills, Florida. The selection process is multi-stage, beginning with a written evaluation based on technical depth, firm qualifications, and team experience. A shortlist of three firms will be invited for interviews, where they will be evaluated on their methodology, problem-solving abilities, and communication. The top-ranked vendor will then enter negotiations. Applicants must provide comprehensive documentation, including organizational charts, resumes for key personnel, and several mandatory affidavits regarding public entity crimes, human trafficking, and labor coercion. Insurance requirements include comprehensive general liability and worker's compensation with minimum policy limits of $1,000,000 combined single limits. Payments will be processed via ACH-EFT.
Engineering Services

POSTED

9 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS