Finkbiner Park Multi-Benefit Stormwater Capture

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Glendora is implementing the Finkbiner Park Multi-Benefit Stormwater Capture Project in Glendora, California. The primary objective is to construct a regional stormwater runoff capture facility designed to improve flood control, water quality, and water supply. This involves diverting runoff from two adjacent drainage features into an underground capture, treatment, and infiltration facility located beneath existing ballfields. The project aims to achieve regional-scale pollutant load reductions within the USGR Watershed and increase infiltration into the underlying groundwater aquifer. In addition to the stormwater infrastructure, the project includes the in-kind replacement of demolished facilities with new recreation features and the conversion of the northern site boundary alley into a green alley using permeable pavement. Further enhancements in the southeast portion of the site will include the installation of a recirculating stream, native landscaping, and an adjacent path for passive recreation. The project has been approved following a determination that it will not have a significant environmental effect, with all necessary mitigation measures and monitoring plans adopted in accordance with CEQA.

General Info

Glendora will build a stormwater capture facility and recreational upgrades at Finkbiner Park.

Agency

California → City of Glendora

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

North Minnesota Avenue & East Dalton Avenue, Glendora, CA, 91741

Set-Aside

NONE

Documents

(1)

Notice of Determination for Finkbiner Park Multi-Benefit Stormwater Capture Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Glendora
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Glendora
Office AddressN/A
Contacts
Maliha Fatima AnsariP.E.

Full Description

Show more
The Project would construct a regional stormwater runoff capture facility within Finkbiner Park to provide multiple benefits including improved flood control, water quality, and water supply. The facility would involve diverting runoff from two adjacent drainage features into an underground capture, treatment, and infiltration facility situated beneath the existing ballfields. The Project represents an opportunity to implement regional-scale pollutant load reductions from a sizeable drainage area in the USGR Watershed as well as increase infiltration to the underlying groundwater aquifer. The Project would also include in-kind replacement of existing facilities within the site that require demolition to implement the stormwater BMP with new recreation facilities and features; conversion of the alley along the northern site boundary into a green alley through installation of permeable pavement; and installation of a recirculating stream, native landscaping, and adjacent path in the southeast portion of the site as a new passive recreation opportunity in the park.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS