Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Finkbiner Park Multi-Benefit Stormwater Capture

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Glendora is implementing the Finkbiner Park Multi-Benefit Stormwater Capture Project in Glendora, California. The primary objective is to construct a regional stormwater runoff capture facility designed to improve flood control, water quality, and water supply. This involves diverting runoff from two adjacent drainage features into an underground capture, treatment, and infiltration facility located beneath existing ballfields. The project aims to achieve regional-scale pollutant load reductions within the USGR Watershed and increase infiltration into the underlying groundwater aquifer. In addition to the stormwater infrastructure, the project includes the in-kind replacement of demolished facilities with new recreation features and the conversion of the northern site boundary alley into a green alley using permeable pavement. Further enhancements in the southeast portion of the site will include the installation of a recirculating stream, native landscaping, and an adjacent path for passive recreation. The project has been approved following a determination that it will not have a significant environmental effect, with all necessary mitigation measures and monitoring plans adopted in accordance with CEQA.

General Info

Glendora will build a stormwater capture facility and recreational upgrades at Finkbiner Park.

Agency

California → City of Glendora

Place of Performance

North Minnesota Avenue & East Dalton Avenue, Glendora, CA, 91741

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Glendora
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Glendora
Office AddressN/A

Full Description

Show more
The Project would construct a regional stormwater runoff capture facility within Finkbiner Park to provide multiple benefits including improved flood control, water quality, and water supply. The facility would involve diverting runoff from two adjacent drainage features into an underground capture, treatment, and infiltration facility situated beneath the existing ballfields. The Project represents an opportunity to implement regional-scale pollutant load reductions from a sizeable drainage area in the USGR Watershed as well as increase infiltration to the underlying groundwater aquifer. The Project would also include in-kind replacement of existing facilities within the site that require demolition to implement the stormwater BMP with new recreation facilities and features; conversion of the alley along the northern site boundary into a green alley through installation of permeable pavement; and installation of a recirculating stream, native landscaping, and adjacent path in the southeast portion of the site as a new passive recreation opportunity in the park.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
RFP2026-015 Ingleside on the Bay Drainage Improvements
Solicitation # RFP2026-015
San Patricio County is soliciting sealed bids for the Ingleside on the Bay Drainage Improvements Project (RFP2026-015) in Ingleside, Texas. The scope of work includes ditch cleaning and reshaping, storm sewer cleaning, storm pipe installation and replacement, and the installation of storm inlets. Additionally, the project involves the full-depth reconstruction of several street segments—specifically Parkview Place, Live Oak Street, and Bayshore Drive/Court—using flexible asphalt pavement sections, as well as the installation of wastewater force mains. Key technical requirements include the use of RC Pipe (Class IV) in various diameters, adherence to AASHTO pavement design guides, and a minimum 95% maximum dry density for shoulder material compaction. The contract will be awarded to the responsive and responsible bidder providing the lowest or best bid. Bidders must submit a statement of qualifications and a proposed calendar day schedule, as shorter schedules are preferred. Bids are due by 2:00 PM on December 16, 2026, and can be submitted electronically via the County's eBidding platform or physically with a thumb drive. For contracts exceeding $100,000, a bid bond of 5 percent is required, along with performance and payment bonds. The project is subject to Davis-Bacon prevailing wage rates, the Contract Work Hours and Safety Standards Act, and various federal non-discrimination and labor regulations. There is no specified set-aside status for this solicitation.
San Patricio County

POSTED

about 8 hours ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS