P-384 TCP Treatment Facility Project (Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The P-384 TCP Treatment Facility Project, managed by the Semitropic Improvement District of Semitropic Water Storage District, involves the construction and operation of a granular activated carbon filtration facility in an unincorporated area of Kern County, California. The primary objective of the facility is to remove 1,2,3 TCP from up to 80 cubic feet per second per day of groundwater conveyed through the existing P-384 Distribution System to the California Aqueduct to ensure compliance with water quality standards. The project is located on an approximately 8.52-acre fenced site adjacent to the Pond-Poso Canal and the P-384 Distribution System Pump Station. The facility will feature a treatment structure housed in a building measuring approximately 112 feet wide by 222 feet long, along with a storage tank and holding pond for carbon filter backwash and related water inflow and outflow management appurtenances. As a direct extension of the P-384 Distribution System, the project is designed to treat groundwater without expanding the existing or former use of the distribution system. The project has been identified as categorically exempt from CEQA under sections 15301 and 15303. Jason Gianquinto, General Manager, serves as the primary point of contact for the project.

General Info

Semitropic Improvement District will build a TCP filtration facility in Kern County, California.

Agency

California → Semitropic Improvement District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

P-384 TCP Treatment Facility Project CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Semitropic Improvement District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Semitropic Improvement District
Office AddressN/A
Contacts
Jason GianquintoGeneral Manager

Full Description

Show more
The Project consists of construction and operation of a granular activated carbon filtration facility (“Treatment Facility”) to remove 1,2,3 TCP (“TCP”) from up to 80 cubic feet per second per day of groundwater conveyed though the District’s existing P-384 Distribution System to the California Aqueduct (“Aqueduct”) to meet Aqueduct TCP water quality standards or requirements. The Treatment Facility will be located within a fenced approximately 8.52-acre site, located immediately adjacent to the existing P-384 Distribution System Pump Station and Pond-Poso Canal, to be acquired by the District for the Project and principally housed within a treatment structure covered by a building about 112 feet wide and 222 feet long. The facility also includes a storage tank and holding pond for carbon filter backwash, and related appurtenances for operating the facility including managing inflow and outflow of water, located on the same site. The Treatment Facility will be directly connected to and an extension of the adjacent P-384 Distribution System (including its pump station and appurtenant structures). The P-384 Distribution System is used to convey water including return of the District’s banking partners’ surface supplies previously stored in the aquifer underlying the District (groundwater), via the Aqueduct. The Project’s removal of TCP will not result in any expansion in existing or former use of the P-384 Distribution System or otherwise.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS