Garvey Reservoir Rehabilitation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Garvey Reservoir Rehabilitation Project, led by the Metropolitan Water District of Southern California, encompasses a wide range of infrastructure upgrades and new construction activities at the facility located in Monterey Park, California. Key components include replacement of the reservoir’s floating cover and liner, seismic retrofitting of the inlet/outlet tower and access bridge, replacement of five valves in the junction structure, installation of a new 500 square foot pump station with subsurface valve connections, modernization of the electrical system, replacement of the standby generator, and upgrades to telemetry equipment tied to the surge tank. Administrative and operational facilities will also be improved, including reconfiguration of the Administration Building and Water Quality Control Laboratory, addition of ADA-compliant amenities, and enhanced security features such as motion-activated lighting and updated camera systems. Additional site work involves repaving internal roadways, replacing fencing, installing stormwater controls, landscaping modifications, and upgrading the ammonia feed system. All construction activities must comply with stringent environmental and safety standards, including SCAQMD Rules 403, 1166, and 1466 for air quality, EPA Tier 4 emission requirements for equipment, the 2010 ADA Standards, and the 2022 California Building Code. Compliance with the 1993 Settlement Agreement and adherence to permitting obligations under Rule 1470 and other SCAQMD regulations are mandatory. The project is divided into multiple phases, with the final phase scheduled to conclude between January 2034 and June 2035, though no overall start or end date is specified. All work is to be performed on-site at the reservoir, and formal acceptance will occur upon successful completion and regulatory compliance verification. Operations and maintenance procedures post-construction, including generator testing and utility usage, are expected to remain consistent with existing patterns. The project is forecasted to be issued in early 2026, with no contract value, pricing, or payment terms disclosed. No information is provided on contract type, evaluation criteria for award, invoice processing, or contracting officer details. While environmental mitigation and air quality compliance are rigorously defined, there are no stated requirements for packaging, marking, barcoding, or delivery terms such as FOB. Although multiple technical and regulatory obligations are specified, including permit acquisition and public notification due to proximity to Hillcrest Elementary School, the absence of standard federal acquisition clauses, representation and certification requirements, subcontractor provisions, or contracting office contact information suggests this is an environmental and engineering
General Info
Agency
NAICS
Place of Performance
Orange Avenue and Tegner Drive, Monterey Park, CA, 91755Set-Aside
Timeline
Organization & Contact Information
Full Description