Garvey Reservoir Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Garvey Reservoir Rehabilitation Project, led by the Metropolitan Water District of Southern California, encompasses a wide range of infrastructure upgrades and new construction activities at the facility located in Monterey Park, California. Key components include replacement of the reservoir’s floating cover and liner, seismic retrofitting of the inlet/outlet tower and access bridge, replacement of five valves in the junction structure, installation of a new 500 square foot pump station with subsurface valve connections, modernization of the electrical system, replacement of the standby generator, and upgrades to telemetry equipment tied to the surge tank. Administrative and operational facilities will also be improved, including reconfiguration of the Administration Building and Water Quality Control Laboratory, addition of ADA-compliant amenities, and enhanced security features such as motion-activated lighting and updated camera systems. Additional site work involves repaving internal roadways, replacing fencing, installing stormwater controls, landscaping modifications, and upgrading the ammonia feed system. All construction activities must comply with stringent environmental and safety standards, including SCAQMD Rules 403, 1166, and 1466 for air quality, EPA Tier 4 emission requirements for equipment, the 2010 ADA Standards, and the 2022 California Building Code. Compliance with the 1993 Settlement Agreement and adherence to permitting obligations under Rule 1470 and other SCAQMD regulations are mandatory. The project is divided into multiple phases, with the final phase scheduled to conclude between January 2034 and June 2035, though no overall start or end date is specified. All work is to be performed on-site at the reservoir, and formal acceptance will occur upon successful completion and regulatory compliance verification. Operations and maintenance procedures post-construction, including generator testing and utility usage, are expected to remain consistent with existing patterns. The project is forecasted to be issued in early 2026, with no contract value, pricing, or payment terms disclosed. No information is provided on contract type, evaluation criteria for award, invoice processing, or contracting officer details. While environmental mitigation and air quality compliance are rigorously defined, there are no stated requirements for packaging, marking, barcoding, or delivery terms such as FOB. Although multiple technical and regulatory obligations are specified, including permit acquisition and public notification due to proximity to Hillcrest Elementary School, the absence of standard federal acquisition clauses, representation and certification requirements, subcontractor provisions, or contracting office contact information suggests this is an environmental and engineering

General Info

Garvey Reservoir rehabilitation includes infrastructure upgrades, seismic retrofitting, environmental compliance, and ADA improvements, concluding between January 2034 and June 2035.

Agency

Metropolitan Water District of Southern California

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Orange Avenue and Tegner Drive, Monterey Park, CA, 91755

Set-Aside

NONE

Documents

(1)

Garvey Reservoir Rehabilitation Project Final Environmental Impact Report Nov 2024

PDFenvironmental-impact-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMetropolitan Water District of Southern California
Contacts1 person available
OfficeN/A
Organization / Agency
Metropolitan Water District of Southern California
Office AddressN/A
Contacts
Michelle MorrisonSenior Environmental Specialist

Full Description

Show more
The proposed Project involves various upgrades, replacements, and improvements to Metropolitan facilities located at Garvey Reservoir, including but not limited to, replacement of the reservoir floating cover and liner, seismic retrofit of the inlet/outlet tower, replacement of five valves in the junction structure, upgrades and redesign of the facility electrical system, replacement of the existing standby generator, improvements to the telemetry equipment associated with the surge tank, re-configuration of and upgrades to the Administration Building and Water Quality Control Laboratory, construction of a new pump station facility, and various site upgrades such as upgrading the ammonia feed system, re-pavement or repair of existing internal roadways, replacement of fencing, installation of stormwater control improvements, landscaping removal and/or replacement, and upgrades to security features. Operations and maintenance activities at the Garvey Reservoir, including the frequency of staff visits, monthly testing of the standby generator, electricity usage, and water usage in the Administration Building and Water Quality Laboratory, would remain similar to existing conditions once construction activities are completed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 17 hours ago

DEADLINE

in 26 days
View Details