Garvey Reservoir Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Garvey Reservoir Rehabilitation Project, managed by the Metropolitan Water District of Southern California, involves comprehensive upgrades and new construction at the 142-acre site in Monterey Park, California. The primary objectives are to ensure facility reliability, improve seismic safety, and achieve compliance with the Americans with Disabilities Act and current building codes. Key technical scopes include the replacement of the reservoir floating cover and polypropylene liner, seismic retrofitting of the inlet/outlet tower and access bridge, and the replacement of five valves within the junction structure. Additionally, the project encompasses a redesign of the electrical system to provide 240-volt to 480-volt power, the installation of a new standby generator meeting EPA emission standards, and improvements to the surge tank telemetry equipment. Facility improvements also extend to the Administration Building and Water Quality Control Laboratory, featuring a new interior layout, ADA-compliant parking and restrooms, and the reconstruction of a south-side retaining wall. Site-wide upgrades include ammonia feed system improvements, roadway repairs, new fencing, stormwater control installations, and enhanced security features. Performance is scheduled primarily between September 2025 and December 2027, with a third phase occurring between January 2034 and June 2035. Contractors must adhere to strict environmental mandates, including the use of US EPA Tier 4 compliant off-road diesel equipment for engines over 25 horsepower and the use of electrically powered welders and generators. The project is subject to South Coast AQMD rules regarding fugitive dust and VOC emissions during excavation and grading activities.

General Info

MWD project upgrading Garvey Reservoir infrastructure for safety, reliability, and ADA compliance.

Agency

Metropolitan Water District of Southern California

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Orange Avenue and Tegner Drive, Monterey Park, CA, 91755

Set-Aside

NONE

Documents

(1)

Garvey Reservoir Rehabilitation Project Final Environmental Impact Report Nov 2024

PDFenvironmental-impact-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMetropolitan Water District of Southern California
Contacts1 person available
OfficeN/A
Organization / Agency
Metropolitan Water District of Southern California
Office AddressN/A
Contacts
Michelle MorrisonSenior Environmental Specialist

Full Description

Show more
The proposed Project involves various upgrades, replacements, and improvements to Metropolitan facilities located at Garvey Reservoir, including but not limited to, replacement of the reservoir floating cover and liner, seismic retrofit of the inlet/outlet tower, replacement of five valves in the junction structure, upgrades and redesign of the facility electrical system, replacement of the existing standby generator, improvements to the telemetry equipment associated with the surge tank, re-configuration of and upgrades to the Administration Building and Water Quality Control Laboratory, construction of a new pump station facility, and various site upgrades such as upgrading the ammonia feed system, re-pavement or repair of existing internal roadways, replacement of fencing, installation of stormwater control improvements, landscaping removal and/or replacement, and upgrades to security features. Operations and maintenance activities at the Garvey Reservoir, including the frequency of staff visits, monthly testing of the standby generator, electricity usage, and water usage in the Administration Building and Water Quality Laboratory, would remain similar to existing conditions once construction activities are completed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS