Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Indian Creek Streamflow Enhancement Planning

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract targets the development of a comprehensive Collaborative Water Management Plan for the Indian Creek subwatershed in California, aiming to improve local streamflow and water resource sustainability. As part of this effort, 100% design plans will be finalized for the Maggy Hawk Planning Project, which includes the engineering design for two water storage ponds, a rainwater catchment system, and the preparation of a formal 1707 petition necessary for regulatory compliance and funding eligibility. Additionally, preliminary designs for another flow enhancement project within the subwatershed will be advanced to 65% completion to support near-term implementation readiness. All activities are coordinated through the Wildlife Conservation Board and tracked under WCB Project Tracker ID 2025159, with oversight led by Deputy Executive Director Rebecca Fris, who serves as the primary point of contact for the project.

General Info

Develop water management plan with two ponds, rainwater system, and 65% design progress for Indian Creek subwatershed.

Agency

California → Wildlife Conservation Board

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Indian Creek Streamflow Enhancement Planning

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Wildlife Conservation Board
Contacts1 person available
OfficeN/A
Organization / Agency
California → Wildlife Conservation Board
Office AddressN/A
Contacts
Rebecca FrisDeputy Executive Director

Full Description

Show more
Project will complete a Collaborative Water Management Plan for the Indian Creek subwatershed, complete 100% designs for the "Maggy Hawk Planning Project," which includes planning for 2 water storage ponds, a rainwater catchment system, and preparation of a 1707 petition, and complete 65% designs for one additional flow enhancement project within the sub-watershed. WCB Project Tracker ID: 2025159.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (C2305), aimed at designing a new municipal groundwater production well to replace and decommission the existing Corydon well in California. The project requires comprehensive professional services including structural, geotechnical, architectural, corrosion, noise, survey, and full-time on-site construction management oversight, delivered in two distinct phases: Phase 1 focuses on technical specifications, civil site design, and bidding support for drilling and abandonment of the old well, aligned with Riverside County and State Water Resources Control Board standards; Phase 2 involves detailed engineering design for equipping, testing, and commissioning the new well, including architectural, mechanical, electrical, and instrumentation and controls systems. The scope includes preparation of a Preliminary Design Report at up to 30% design level, review of approximately 200 submittals, assistance with permit amendments, development of record drawings reflecting field changes, and support for commissioning and operator training. The contract is a professional services agreement with an estimated total project cost of $2,260,788, including $2 million in construction costs and a negotiated professional services fee to be determined post-award, with a not-to-exceed limit to be established. The solicitation is designated as a Small Business Set-Aside under SBA and DBE categories, requiring all offerors to be certified as Disadvantaged Business Enterprises and to provide detailed information on any DBE subconsultants utilized, along with explanations for any not selected. Proposals must include compliance certifications covering American Iron and Steel, Lobbying, Debarment and Suspension, System for Award Management, Executive Order N-6-22, Conflict of Interest, Insurance Requirements, and Public Works Registration, all submitted via Attachment “2,” and must adhere to Build America Buy America Act provisions requiring domestic content documentation and waiver procedures for non-compliant materials. Technical evaluation prioritizes relevant experience and qualifications at 25%, followed by understanding of the project and approach (25%), scope and schedule (20%), innovation (10%), cost value (10%), and overall proposal quality (10%), with award based on demonstrated competence rather than lowest price. The proposal deadline is September 1, 2026, submitted exclusively through the PlanetBids portal, and responses must remain valid for 180 days. Payment must be processed through the Treasury’s ASAP system, with remittance details provided for both electronic and check
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project - Professional Design, Bidding Support, Engineering Services During Construction
Solicitation # corydon-well-replacement-project-professional-design-bidding-support-engineering-services-during-0
The Corydon Well Replacement Project, managed by the Elsinore Valley Municipal Water District, seeks professional design, bidding support, and ongoing engineering services during construction for a water infrastructure upgrade in Lake Elsinore, California. The solicitation, identified as C2305, is open to contractors capable of delivering comprehensive engineering expertise throughout the project lifecycle, from initial design through construction oversight. The project is categorized under NAICS code 541330 for architectural and engineering services and includes specific participation goals for Disadvantaged Business Enterprises aligned with Department of Transportation guidelines, encouraging participation from certified DBEs. The proposal response deadline is September 1, 2026, with all submissions required to meet the technical and compliance standards outlined by the contracting agency. AKM Consulting Engineers is the designated contracting authority, with Katie Neubauer serving as the primary point of contact for inquiries and submissions. Interested parties must navigate the federal opportunity portal via the provided SBA link and adhere to all submission protocols tied to the solicitation number. While location details are limited to the state of California, performance is exclusively centered on the Corydon Well site in Lake Elsinore. The agency does not specify a set-aside type beyond DBE participation, and no detailed budget or scope of work is provided in the posting, suggesting that proposers are expected to thoroughly review supplemental materials and site conditions. All communication and documentation must be directed through the provided contact information to ensure timely consideration.
AKM Consulting Engineers

POSTED

about 6 hours ago

DEADLINE

in 23 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project entails the design of a new municipal groundwater production well to replace and permanently abandon the existing Corydon Well, located on Elsinore Valley Municipal Water District property, with full engineering support for site facilities, construction management, and hydrogeological oversight throughout the drilling and equipping phases. The scope spans two phases: Phase One involves technical specifications, civil site design, line-bid items, bidding support, and full-time on-site construction management to ensure compliance with Riverside County and California State Water Resources Control Board standards for well construction and abandonment, including sanitary seal placement per AWWA guidelines and a 24-inch diameter stainless steel Ful-Flo louvered well screen matching the existing casing depth. Phase Two focuses on architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for well equipping, testing, and commissioning, supported by engineering services during construction. The project is governed by the Build America, Buy America Act and 2 CFR Part 184, mandating domestic content in materials and strict documentation of origin for iron, steel, and manufactured products, with bidders required to certify best-effort sourcing and compliance through formal submittals. Federal funding from a BOR Grant up to $400,000 imposes adherence to 2 CFR Part 200, including audit rights, debarment and suspension requirements, and lobbying restrictions under the Byrd Act, while also triggering Clean Air and Clean Water Act provisions for subcontracts exceeding $150,000. The contract demands an integrated team of hydrogeologists, civil and structural engineers, electrical and instrumentation specialists, surveyors, geotechnical analysts, environmental regulators, and construction managers, with key personnel resumes and California licensure required for submission. Proposals must detail hourly rates, task-based cost breakdowns, travel expenses, and a not-to-exceed project value capped at $1,000,000, with payment tied to monthly itemized invoices supported by progress reports and schedule updates reviewed within 45 days. Compliance extensions include public works registration, Executive Order N-6-22 sanctions certification, conflict of interest disclosures, American Iron and Steel certification, SAM and UEI registration, and active California Air Resources Board compliance. Subcontracting to certified DBEs, SDBs, WOSBs, MBEs, and other diverse businesses is strongly desired, with full disclosure of subconsultant participation mandatory. The project is scheduled to begin in November 2
GEI Consultants, Inc.

POSTED

about 6 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
Federal
On-Site Inspection and Acceptance SupportThe contract requires on-site technical support for the government inspection and acceptance of a laser system at White Sands Missile Range, specifically during the readiness verification and documentation phases. The vendor must ensure the system is fully prepared for inspection, provide expert personnel to assist with operational testing, and deliver complete, accurate, and compliant documentation to meet federal acceptance standards. All activities must occur at the designated location in White Sands Missile Range, ZIP 88002, and align with the technical requirements of the Department of Defense under the NAICS code 541330 for scientific research and development services. This is a subcontract opportunity with a response deadline of August 14, 2026, at 5:00 PM, following a posting date of August 8, 2026. The contracting office, W6QK Acc-Apg Adelphi, is part of the Department of Defense and will oversee the evaluation and award process. The support team must possess specialized knowledge of laser systems, be able to interact effectively with government inspectors, and ensure all performance metrics and procedural checks are satisfactorily completed prior to formal acceptance. No set-aside type is specified, and the contract will be awarded based on technical capability, compliance, and responsiveness to the inspection readiness requirements.
W6QK Acc-Apg Adelphi

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541330
New
SLED
A/E RFQ - Ballistic Aero-Optics and Materials Range Phase 2 - Bryan, Texas
Solicitation # TAMUS-RFQ-01-3489
The Texas A&M University System, through its Office of Facilities Planning & Construction, is seeking qualified Architect/Engineer firms to support the Ballistic Aero-Optics and Materials Range Phase 2 project at the RELLIS Campus in Bryan, Texas. This initiative expands upon a facility completed in 2024 to significantly enhance capabilities in aero-optics and hypersonic testing, including extending aero-optics performance beyond 1,000 meters and hypersonic testing beyond 500 meters, while doubling the recovery tube length from 305 meters to approximately 610 meters. The project calls for the design and construction of critical infrastructure components including a new Tail Building at the south end of the range to house the relocated Laser Firing Tank and final sections of the recovery tube, as well as at least two additional test buildings aligned with project test sections. Standardized 14.6-meter range tube sections will be used throughout the expansion. The total planning budget for the project is $70,605,000, with $17,129,803 allocated specifically for the construction contract, while the remainder covers fees, furnishings, contingencies, and related expenses. Selection will proceed through a qualifications-based process where firms submit statements of qualifications via the e-Builder portal by 2:00 p.m. Central Time on September 1, 2026. The top-ranked respondents may be invited to present their qualifications in an interview, but no pricing or cost information is solicited at this stage. All firms must complete the State of Texas Subcontracting Plan form, for which guidance and a tutorial are provided by the system’s Office of Procurement & Business Services. Inquiries must be directed to Jeff Herring at the Texas A&M University System Office of Facilities Planning & Construction, with contact information provided for phone and email. The solicitation is issued under NAICS code 541330 and administered by a state educational agency with no set-aside provisions identified.
Texas A&M University System

POSTED

about 23 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
International
Transportation and Economic Corridors - Request for Proposal - CON0025815-OVERLAYS of HWY 49:06 and HWY 49:08
Solicitation # AB-2026-05586
Alberta Transportation and Economic Corridors is soliciting proposals from three pre-qualified firms—Associated Engineering Alberta Ltd., Progressive Engineering and Consulting Ltd. (dba CAP Engineering), and ISL Engineering and Land Services Ltd.—for comprehensive engineering services on two sections of Highway 49: Overlay limits 34.946 to 52.425 (WAC0077705) and 0.000 to 2.486 (WAC0077705). The scope includes preliminary engineering, detailed design, contract tendering, contract administration, construction supervision, post-construction review, and warranty inspections. Proposals must be submitted in two separate PDF files under 10 MB each: one detailing technical qualifications and the other containing the proposal fee. This is a Request for Proposal, not an Invitation to Tender, and only submissions from the listed firms will be considered. Alberta Transportation and Economic Corridors reserves the right to request clarifications, accept or reject proposals without negotiation, or negotiate changes with the selected firm. There is no reimbursement for proposal preparation costs. Selection will be based on overall value, not simply the lowest price. The deadline for submissions is September 2, 2026, at 5:30 AM MT, and inquiries should be directed to Rence Balaccua, Project Procurement Officer.
Transportation and Economic Corridors

POSTED

1 day ago

DEADLINE

in 24 days
View Details