Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Interstate 680 Northbound Express Lane Completion Project

Forecast
04-CC-680State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Nicholas PiucciSenior Environmental Scientist (Specialist)

Full Description

Show more
As a major north-south freeway, I-680 is a heavily traveled corridor that connects the Southern San Francisco Bay Area with Interstate 80 and passes through Santa Clara, Alameda, Contra Costa, and Solano counties. Within Contra Costa county, travelers experience congestion, traffic bottlenecks within the corridor, and increased travel times. The Project proposes to construct a northbound express lane from Livorna Road to State Route (SR-) 242 and convert the existing northbound High Occupancy Vehicle (HOV) lane from SR-242 to north of Arthur Road near Martinez to an express lane. the Project has four build alternatives (1C, 2, 3, and 5) and one no build alternative. Alternative 2 has been identified as the Preferred Alternative. The Project is located within Alamo, Walnut Creek, Concord, Pleasant Hill, and Martinez on I-680.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil infrastructure and site work. Key scopes of work include underground utilities such as tunneling, boring, jacking, micro tunneling, and cathodic protection; site preparation involving land surveying, site clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, traffic signals, lighting, and landscaping. Required materials include ready mix supply, precast concrete, manhole materials, and valves. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Additionally, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for bid submission is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
SLED
KTA 8289
Solicitation # 8289
The Kansas Turnpike Authority solicitation 8289 is for a roadwork project on I-335 in Shawnee County, spanning from mile marker 183.5 to 194.5. The scope of work includes pavement patching, the application of Type A Ultrathin Bonded Asphalt Surface (UBAS) on eastbound and westbound mainline lanes, and a 2-inch cold mill and 2-inch inlay on the shoulders. The contractor is also responsible for installing all mainline permanent pavement markings. All work must adhere to the 2015 Edition of the Standard Specifications for State Road and Bridge Construction published by the Kansas Department of Transportation, with specific asphalt mix requirements of SM-12.5A or SR-12.5A and binder grades of PG 64-28 and PG 70-28. The project is scheduled to begin no earlier than March 15, 2027, with a final completion date for minor clean-up work of November 19, 2027. Quality control and testing must be performed by an independent laboratory approved by the Director of Engineering, while the Authority handles batch plant inspection. Financial terms include a 5% retainage from the total work completed until contract and bond provisions are met. The contractor must maintain specific insurance coverages, including 1 million dollars for general and automobile liability and statutory worker's compensation. Strict safety protocols are in place, including a prohibition on turnarounds through barrier walls; violations will result in immediate work suspension without extensions to completion deadlines. The Kansas Turnpike Authority is tax-exempt under K.S.A. 79-3606(d).
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days
View Details

More opportunities from California → Caltrans, District 4 - Bay Area/Oakland

Same awarding agency

NAICS: 237310
SLED
Solano State Route 12 Pavement Preservation (04-0AA53)
Solicitation # 04-0AA53
The Solano State Route 12 Pavement Preservation project (EA 04-0AA53) is a Caltrans District 4 initiative located in Solano County, California, spanning State Route 12 between postmiles 14.10 and 20.68. With a total programmed cost of approximately 37.388 million dollars, the project focuses on comprehensive roadway improvements including pavement dig-outs, cold planing, asphalt concrete overlay, and the installation of AC dikes. Additional scope elements include shoulder widening, drainage improvements, the upgrade of metal beam guardrails, traffic signing panel updates, and the installation of centerline and shoulder rumble strips and pavement delineation. The project is governed by the 2025 Caltrans Standard Specifications, with specific requirements for job site management and the handling of hazardous waste and contamination. Environmental compliance is a primary focus, as evidenced by a Mitigated Negative Declaration under CEQA and the requirement for various permits, including a 1602 Lake and Streambed Alteration Agreement and a Section 401 Clean Water Act Permit. Strict protocols are in place for the delineation of Environmentally Sensitive Areas using high-visibility markings and the implementation of biological inspection measures for pipes, culverts, and open trenches. The project also adheres to Title VI of the Civil Rights Act and the Americans with Disabilities Act to ensure non-discrimination and accessibility.
Highway, Street, and Bridge Construction

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Sonoma State Route 116 Capital Preventive Maintenance ProjectThe Sonoma State Route 116 Capital Preventive Maintenance Project, managed by Caltrans District 4, involves comprehensive roadway and infrastructure improvements in Sonoma County. The scope of work covers State Route 116 from Post Mile 7.74 in Monte Rio to Post Mile 25.05 near Sebastopol. Key deliverables include resurfacing the existing roadway, replacing guard rails, repairing or replacing culverts, and installing or replacing streetlights. Additionally, the project focuses on enhancing accessibility and safety by widening narrow shoulders to create Class II bicycle lanes and bicycle pull outs, adding new sidewalks and crosswalks, and upgrading all pedestrian infrastructure to meet current Americans with Disabilities Act standards. The project has undergone environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. This process confirmed that no significant environmental effects are expected, and the California Transportation Commission serves as the approving agency. Administrative oversight is led by Christopher Pincetich, Senior Environmental Scientist and Branch Chief of the Office of Environmental Analysis. The project is categorized under NAICS code 237310 for highway and street construction, with official environmental filing fees processed through the California Department of Fish and Wildlife.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
State Route (SR) 37 Sears Point to Mare Island Improvement ProjectThe State Route 37 Sears Point to Mare Island Improvement Project, managed by Caltrans District 4, involves extensive infrastructure upgrades across Napa, Sonoma, and Solano counties. The scope of work includes reconfiguring highway lanes from west of the SR 121 intersection to the Walnut Avenue Overcrossing at Mare Island, replacing the Tolay Creek Bridge, and widening the Sonoma Creek Bridge. Key construction elements include adding through lanes to provide two lanes in each direction consisting of tolled general purpose and High Occupancy Vehicle lanes, constructing 8-foot shoulders (with 4-foot shoulders at the Sonoma Creek Bridge), and signalizing the SR 37/Noble Road intersection. Additionally, the project incorporates safety enhancements such as CHP enforcement areas, maintenance vehicle pullouts, traffic control devices, and changeable message signs, while also focusing on the restoration of degraded marsh habitat at Strip Marsh East. The project has undergone rigorous environmental review in compliance with the California Environmental Quality Act, including the preparation of an Environmental Impact Report, an Addendum, and a Supplemental Environmental Impact Report. Official Notices of Determination filed in late 2025 and 2026 confirm that the project will not have a significant effect on the environment, provided that adopted mitigation measures and a monitoring plan are implemented. Administrative oversight is led by Senior Environmental Scientist Skylar Nguyen and Associate Deputy Director Cherry Zamora, with the project's environmental filing fees processed through the California Department of Fish and Wildlife.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
State Route 12 Pavement Rehabilitation Project
Solicitation # 04-4W230
Caltrans plans to rehabilitate pavement and improve infrastructure along State Route 12 between postmile 0.0 to 3.31 in Napa County and postmile 0.0 to 7.90 in Solano County, including drainage enhancements, installation of pedestrian islands, and updates to various system elements. The project is being evaluated under a proposed Negative Declaration, indicating that Caltrans anticipates no significant environmental impacts from the proposed work. Based on an Initial Study, the project is not expected to substantially affect aesthetics, agriculture, air quality, cultural resources, energy, geology, hydrology, land use, mineral resources, population, housing, public services, recreation, tribal cultural resources, utilities, wildfire risk, greenhouse gas emissions, hazards, noise, transportation, traffic, or biological resources. While the project may result in minor or less than significant effects in certain areas, it is not anticipated to trigger the need for an Environmental Impact Report. The project is formally listed under the title State Route 12 Pavement Rehabilitation Project with a forecast posting date of June 24, 2026, and is managed by Caltrans District 4 – Bay Area/Oakland. Public and agency comments may still influence the final determination of the Negative Declaration, and the decision is not yet final. The primary point of contact for environmental inquiries is Matthew Coughlin, Environmental Scientist, reachable via email or phone. The project’s official documentation and updates can be accessed through the provided online link.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS