Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

State Route (SR) 37 Sears Point to Mare Island Improvement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State Route 37 Sears Point to Mare Island Improvement Project is a California Department of Transportation (Caltrans) initiative to reconfigure and expand a segment of SR 37 from west of SR 121 to the Walnut Avenue Overcrossing at Mare Island, located primarily within Vallejo, California, and extending into Napa, Sonoma, and Solano counties. The project includes replacing the Tolay Creek Bridge, widening the Sonoma Creek Bridge, adding two dedicated lanes in each direction—one tolled general-purpose lane and one High Occupancy Vehicle (HOV) lane—along with 8-foot paved shoulders, except for a 4-foot shoulder at Sonoma Creek Bridge. Additional improvements involve signalizing the SR 37/Noble Road intersection, installing traffic control devices and message signs, relocating toll gantries, and constructing maintenance vehicle pullouts and CHP enforcement areas. Environmental mitigation is a critical component, with enhanced restoration of degraded tidal marsh habitat at Strip Marsh East and compliance with the California Environmental Quality Act (CEQA), including the filing of a Negative Declaration and associated environmental fees totaling over $7,000 paid to the California Department of Fish and Wildlife. The project’s scope was expanded through a supplemental EIR to include further habitat enhancements and operational infrastructure. All administrative and environmental compliance activities are managed by Caltrans District 4, with Skylar Nguyen serving as the primary environmental liaison. There is no formal solicitation number, contract award date, contract type, pricing structure, or federal Acquisition Regulation clauses identified, indicating this is a pre-solicitation or planning-phase forecast document. Payment for environmental filings is processed manually via check mailed to the California Department of Fish and Wildlife in Sacramento, with no electronic invoicing, federal appropriation codes, or contractor-specific requirements outlined. Acceptance and inspection responsibilities fall solely under Caltrans, with project records maintained at the District 4 office in Oakland. No offeror representations, socioeconomic certifications, UEI or CAGE codes, or evaluation factors are present, as this document reflects state-level environmental planning and regulatory compliance rather than a competitive federal procurement. The project approval date is listed as December 1, 2025, with a corresponding cash receipt dated December 8, 2025, but no performance period, delivery schedule, or contract value is specified.

General Info

Caltrans upgrades SR 37 with widened lanes, new bridges, habitat restoration, and environmental compliance in Bay Area counties.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Vallejo, CA

Set-Aside

NONE

Documents

(3)

Notice of Determination for State Route 37 Sears Point to Mare Island Improvement Project

PDFdetermination-and-findings

Notice of Determination for State Route 37 Sears Point to Mare Island Improvement Project

PDFnotice-of-determination

2025 Environmental Document Filing Fee Cash Receipt - State Route 37 Project

PDFcash-receipt

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Cherry ZamoraAssociate Deputy Director
Skylar NguyenSenior Environmental Scientist

Full Description

Show more
The project would reconfigure the existing SR 37 highway lanes from west of the SR 121 intersection to the Walnut Avenue Overcrossing at Mare Island; replace the Tolay Creek Bridge; construct additional through lanes to provide two lanes (tolled general purpose and High Occupancy Vehicle) in each direction; construct 8-foot shoulders (except at Sonoma Creek Bridge, which would have 4-foot shoulders); widen the Sonoma Creek Bridge; signalize the SR 37/Noble Road intersection; and enhance the degraded marsh habitat at Strip Marsh East, located south of SR 37.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Quality Assurance and Compliance Testing (Environmental/Chemical)The contract requires third-party testing and verification of brine salt to ensure full compliance with TxDOT CAT 8C-B specifications, focusing on critical parameters such as concentration, purity, and corrosion characteristics. This work is essential for confirming that the brine salt meets the stringent environmental and chemical standards mandated by the Texas Department of Transportation for use in transportation infrastructure applications. The testing must be conducted by qualified external laboratories with proven expertise in chemical analysis and environmental compliance to guarantee accurate, reproducible results aligned with state requirements. The solicitation is classified as a subcontract under NAICS code 541620, indicating it involves scientific and technical testing services. It is posted under the Texas SmartBuy portal with a response deadline of September 1, 2026, allowing potential bidders sufficient time to prepare detailed proposals demonstrating their technical capability, equipment certification, and experience with similar transportation-related materials testing. The place of performance and point of contact details are unspecified, but all work must align with Texas Department of Transportation's operational and regulatory expectations, ensuring the brine salt used in state projects remains safe, effective, and environmentally compliant.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541620
New
SLED
Erosion Control and Stormwater ManagementThe contract pertains to erosion control and stormwater management activities required during and after construction projects under the jurisdiction of the Texas Department of Transportation. It encompasses the installation and maintenance of best management practices such as silt fences, sediment basins, inlet protection structures, and related measures designed to prevent sediment runoff and protect water quality. The work must be performed in accordance with state and federal environmental regulations to mitigate the impact of construction on surrounding ecosystems and waterways. All activities are to be completed within the designated project areas, with strict adherence to timelines and performance standards. The contract is classified as a subcontract and is open for bids with a response deadline of September 2, 2026. It falls under the NAICS code 541620, indicating it involves environmental consulting and related services. The solicitation was posted on August 7, 2026, and is accessible through the Texas SmartBuy portal. While specific performance locations and contact details are not provided, the work is expected to occur across various Texas transportation construction sites. Contractors must demonstrate experience in implementing erosion and sediment control systems and be prepared to provide documentation and inspections to verify compliance with established environmental protocols.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 25 days
View Details