Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Veterans Affairs was posted on June 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

J042--SOURCES SOUGHT - MARKET RESEARCH FOR Jackson Fire Suppression Maintenance

Closed
36C10D25Q0111Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541350
New
SLED
HSR26-26 Re-Bid #2 Fresno Building Inspection
Solicitation # HSR26-26
The California High-Speed Rail Authority is soliciting informal bids under solicitation HSR26-26 Re-Bid #2 for a comprehensive on-site building inspection and repair recommendation project for its Fresno Office located at 11111 H Street, Fresno, CA 93721. The selected contractor will be responsible for evaluating all major building systems, including plumbing, sewer, drainage, electrical, HVAC, roofing, security, the building envelope, and life-safety and structural components. Key deliverables include a comprehensive written inspection report with supporting photographs, an executive summary of critical risks, a prioritized list of corrective actions, and rough order-of-magnitude cost estimates for all recommended repairs. The project requires personnel knowledgeable in federal, state, and local building codes, as well as current safety and accessibility standards. The response deadline is November 6, 2026, and the solicitation is categorized under NAICS code 541350. Bidders must provide a valid Class A or Class B license from the California Contractors State License Board and submit several required documents, including a cost sheet, payee data record, and bidder certifications. Evaluation is based on cost reasonableness and past performance, with a 3% to 5% incentive applied for Disabled Veteran Business Enterprise participation. The contract includes strict compliance requirements regarding the Authority's Conflict of Interest Code, the Americans with Disabilities Act, and a ten-year confidentiality survival period. Invoicing is permitted monthly in arrears, and the final report is due five business days after the Authority provides feedback on the initial draft.
California High-Speed Rail Authority

POSTED

about 6 hours ago

DEADLINE

in 9 days
NAICS: 541350
New
SLED
Operation and Management of the Building Department
Solicitation # AD-26-01
The City of Pembroke Pines is soliciting proposals under RFP AD-26-01 for the operation and management of its Building Department. The project utilizes a City-Provided Leadership Model, where the City retains the Chief Building Official and Building Department Operations Manager, while the contractor provides all other necessary administrative, clerical, and technical staff, including Assistant Building Officials, Trade Chiefs, Plan Reviewers, and Inspectors. The selected firm will be responsible for issuing permits, performing inspections, and executing statutory duties in accordance with the Florida Building Code and Broward County Amendments. The contract is for an initial five-year term with one five-year renewal option. Proposals are due by 2:00 pm on November 10, 2026, and must be submitted electronically via the City's e-Procurement Portal. Pricing is based on a proposed percentage of gross revenue derived from building permit fees, with specific daily rates established for key roles such as Assistant Building Officials at 1,500 dollars and Trade Chiefs at 1,000 dollars. Award decisions will be based on the most responsive and advantageous proposal, with preference points available for local Pembroke Pines vendors, Broward County vendors, and Veteran-Owned Small Businesses. Contractors must ensure all personnel have at least three years of relevant experience and hold required state and county certifications. Strict vehicle marking standards are required, including uniform colors and specific City of Pembroke Pines identification. The contractor must also implement a comprehensive Quality Assurance program to track performance metrics such as turnaround times and error rates. Required submittals include a Letter of Intent and a sworn Affidavit of Accuracy.
City Manager's Office

POSTED

2 days ago

DEADLINE

in 13 days
NAICS: 541350
New
SLED
OER Solar Quality Assurance Study and Report
Solicitation # RFP27007093
The State of Rhode Island Office of Energy Resources is soliciting a consultant under RFP27007093 to conduct a Quality Assurance Study and Report for the Renewable Energy Growth Program installations from the 2026-2028 program years. The selected consultant will perform on-site assessments by licensed electricians to ensure systems are safe, high quality, and compliant with NEC and state specifications. Key deliverables include a sampling memo for OER approval, standardized inspection reports for installers and homeowners, a customer feedback survey, and a final report presented in person to the DG Board. The initial contract term is three years starting approximately January 1, 2027, with the possibility of two additional 12-month renewals. Award decisions are based on a weighted scoring system of 106 points, requiring a minimum technical score of 55 points to proceed to cost evaluation. Bidders must provide a detailed cost proposal broken down by specific tasks, ranging from small-scale PV inspections to larger wind and hydropower projects. Mandatory requirements include a Supplemental Bidder Attestation regarding conflicts of interest, an ISBE participation plan for MBE, WBE, or Disability Business Enterprises, and professional certifications such as NABCEP. The consultant must also maintain significant insurance coverage, including 2 million dollars in professional liability and 1 million dollars in commercial general liability and automobile liability.
State of Rhode Island

POSTED

2 days ago

DEADLINE

in 22 days
NAICS: 541350
New
International
PARK VIEW HEALTH AND WELLBEING CENTRE BUILDING SUPERVISOR SERVICES
Solicitation # CAV-FTS-64586
The Cardiff and Vale University Health Board is seeking a qualified consultant for the provision of Building Supervisor Services for the Park View Health and Wellbeing Centre in Ely, Cardiff. Under solicitation CAV-FTS-64586, the appointed supervisor will act as the Health Board's independent representative on-site, providing quality assurance, compliance monitoring, and reporting throughout the construction, commissioning, and handover phases. Key responsibilities include monitoring workmanship and materials against contract documents, inspecting high-risk and concealed work, and maintaining a detailed quality observation and non-conformance log. The contract is estimated at 140,000 GBP excluding VAT and is scheduled as a 90-week appointment, with an assumed 12-month defects period. The successful tenderer will be appointed under an NEC PSC contract and must adhere to strict reporting timelines, including issuing site visit reports within one working day and escalating urgent safety concerns within two hours. Evaluation for the award is based on a Most Economically Advantageous Tender approach, weighted 60 percent for commercial cost and 40 percent for technical quality. Mandatory insurance requirements include 5 million GBP for Professional Indemnity and Public Liability, and 10 million GBP for Employers Liability. The submission deadline for this open procedure is November 16, 2026, with a particular suitability noted for small and medium-sized enterprises.
Cardiff and Vale University Health Board

POSTED

2 days ago

DEADLINE

in 19 days
NAICS: 541350
New
SLED
Third Party Elevator Inspections
Solicitation # 2026-23
The City of Newark, New Jersey, through the Division of Central Purchasing, is soliciting proposals under solicitation number 2026-23 for a Private On-Site Inspection Agency to provide third-party elevator subcode enforcement services. The selected contractor must be authorized by the New Jersey Department of Community Affairs and operate in accordance with N.J.A.C. 5:23-4.14 and the NJBIC. The scope of work requires the agency to provide on-call inspectors under the guidance of the City Construction Code Official, with a minimum staffing requirement of one Elevator Sub-Code Official and at least two full-time elevator inspectors assigned to Newark. The agency must maintain an office staffed at least 40 hours per week and conduct monthly performance review meetings with City representatives to monitor service quality and workload. The contract is for an initial term of three years, with the possibility of two additional one-year renewal terms, totaling a maximum of five years. Proposals must be submitted electronically via the OpenGov e-Procurement Portal by November 24, 2026, at 2:00 pm. Submissions must be divided into a separate technical proposal and cost proposal, accompanied by various certifications, including W-9, Federal Debarment, and disclosures regarding Iran and Russia-Belarus activities. Award decisions will be based on the most advantageous offering that best meets the City's needs, with a focus on responsiveness and the standards of responsibility. Failure to provide required information or submitting inadequate pricing may result in a proposal being deemed non-responsive.
Division of Central Purchasing

POSTED

2 days ago

DEADLINE

in 27 days
NAICS: 541350
New
International
Depot Fire Break & Void Detection Surveys
Solicitation # ocds-h6vhtk-079033
Thameslink Southern Great Northern Limited (TSGN) is seeking a contractor to address fire safety non-compliances across several depots. The project focuses on reviewing existing fire prevention measures within ceiling voids, including fire stopping and fire breaks. The primary deliverable is a comprehensive scope of works for roof void fire protection, which must include fire breaks, fire stopping for existing walls, and a detailed review of void protection aligned with the current fire alarm system. The contract is divided into three geographical lots: Lot 1 covers Bedford, Peterborough, Letchworth, and Welwyn; Lot 2 covers Selhurst, Battersea, Hornsey, Streatham Hill, and Cricklewood; and Lot 3 covers Brighton, Bognor Regis, Hove, Littlehampton, and Horsham. The total estimated value of the project is 540,000 GBP including VAT, with individual lot estimates ranging from 168,000 GBP to 204,000 GBP. The estimated period of performance is one year, from April 26, 2027, to April 25, 2028. Award decisions will be based on a competitive flexible procedure, with evaluation weighted at 60 percent for technical quality and 40 percent for the commercial pricing proposal across all lots. The opportunity is open to small and medium-sized enterprises (SME), and all submissions must be made in English via the electronic portal.
Thameslink Southern Great Northern Limited (TSGN)

POSTED

2 days ago

DEADLINE

N/A
NAICS: 541350
New
SLED
27-004 Inspection Services
Solicitation # 27-004
Solicitation 27-004 is a Request for Proposal issued by the City of Commerce, Georgia, for professional Plan Review and Inspection Services. The contract is designed for an initial one-year term with the possibility of annual renewals for up to three years. To be eligible, firms must demonstrate ICC Residential and Commercial Building Inspection certifications across all trades, including plumbing, heating, air, electrical, and mechanical, as well as expertise in inspecting footings, foundations, concrete slabs, and framing, providing proof of such certifications for the last three years. The City will evaluate proposals based on the completeness of the submission, the applicant's understanding of the services, experience and past performance, and cost. Submissions are due by December 1, 2026, and must include two paper copies, an electronic copy, a notarized Contractor Affidavit complying with the Illegal Immigration Reform and Enforcement Act of 2011, a W-9, and a Vendor Master Form. A 5% bid bond is required with the proposal, and the selected vendor must provide a 100% performance bond along with proof of liability and workman's compensation insurance before commencing work. The contract is governed by Georgia state law and incorporates mandatory federal requirements from 2 CFR Part 200 Appendix II for projects funded with State and Local Fiscal Recovery Funds. Proposals must include a Total All-Inclusive Not to Exceed Maximum Price submitted in a separate envelope.
City of Commerce

POSTED

5 days ago

DEADLINE

in about 1 month

General Info

NAICS

541350 - Building Inspection Services

Place of Performance

Department of Veterans Affairs Veterans Benefits Administration Acquisition Division 1800 G Street NW, Washington, DC, 20006, USA

Set-Aside

SDVOSBC

Documents

1

Sources Sought - Jackson Fire Suppression Maintenance

DOCX, High priority: read this firstsources-sought
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Veterans Benefits Administration (36C10D)
Contacts1 person available
OfficeWASHINGTON, DC, 20006, USA
Office AddressWASHINGTON, DC, 20006, USA
Contacts
Tiffany GarfieldContract Specialist

Full Description

Show more
1 THIS IS A DRAFT STATEMENT OF WORK FOR MARKET RESEARCH PURPOSES ONLY This Sources Sought is merely looking for qualified and interested contractors for an upcoming solicitation FIRE AND SAFETY SYSTEM MAINTENANCE STATEMENT OF WORK (SOW) General: The Contractor shall provide all supplies, travel, equipment, materials, parts, supervision, personnel/labor and technical supervision required to provide fire suppression system inspection and testing in accordance with the National Fire Protection Association (NFPA) codes, Joint Commission, The Department of Veterans Affairs, federal, state and local codes, and the manufacturer s recommended procedures for the Veterans Benefit Administration (VBA) Building at 1600 East Woodrow Wilson Ave, Jackson, MS 39216. Scope: The Contractor shall provide services which include, but are not limited to: Perform scheduled and preventative maintenance including inspecting, testing, adjusting, repairing and parts replacement, Troubleshooting services to remedy failures and malfunctions, Major equipment maintenance and overhaul, Maintenance reports, daily logs, and record keeping, Maintenance manual updating. The performance inspection, testing and repair of the fire alarm and notification systems, equipment and related components. The facility utilizes a Simplex FACP-4100U fire alarm system. Provide all labor to perform annual fire extinguisher inspection for up to 75 fire extinguishers of 5lb, 10lb, 20lb and two 131lb wheeled badger ABC extinguisher to include six and twelve-year maintenance testing and tagging. Perform Hydrostatic testing and Maintenance on fire extinguishers as needed and replacement if needed in the VBA Building, Parking Garage, and Basement Storage Room. (Note: most ABC extinguishers were purchased in June 2013 therefore will be due hydrostatic testing at the same time). The Contractor will be responsible to conduct a Five Year Internal and Obstruction inspection due on 18 wet sprinklers and gauges in accordance with NFPA 25, Chapter 13. In accordance with Section 13.2.7 (Gauges) shall be inspected to verify that gauges are operable and not physically damaged. Section 13.4.2.1 (Check Valves) Inspections shall be inspected internally every 5 years to verify that all of the valve s components operate correctly. Section 13.4.3.1.5 (Strainers, Filters, Restricted Orifices, and Diaphragms Chambers) shall be inspected internally every 5 years unless test indicate a greater frequency is necessary. During this inspection any sprinkler gauges deemed out of date or requires replacing must be replace in accordance with NFPA 25, Section 13 The Contractor shall be responsible to perform all services necessary to perform semi-annual inspection and certification of automatic kitchen hood suppression system and replace fusible links, located in the 2nd floor canteen during the months of October and April respectively (unless written changes are agreed upon in advance). The Contractor shall provide written notice two weeks in advance to the COTR to allow scheduling with all parties involved and prevent interfering with canteen serving schedule. The Contractor is required to steam clean canteen vent hood twice during each contract year. Regular cleaning is necessary to keep the vent hood system functioning at its peak and to avoid costly breakdowns, cleaning is a must to stay in compliance with local health and fire codes. The cleaning shall include the entire hood system including exhaust fan(s), stack, grease filters, and backsplash. Polish the hood and clean up afterwards to follow NFPA Part 96 fire code regulations and applicable health codes. Antifreeze System: The freezing point of solutions in antifreeze will be tested annually by measuring the specific gravity with a hydrometer or refractometer and adjust the solutions if necessary. Alarm devises will be inspected quarterly to verify that they are free of physical damage. Test 8 backflow preventers once per contract year. Monthly maintenance will include inspect building fire sprinkler system to include operating the floor control valves for each floor of the building; opening and closing each standpipe valve; operating and test fire pump. Any associated labor and parts for maintenance or repairs shall be included in this contract. No work is to be performed on the site on Saturdays, Sundays or legal holidays unless otherwise specified and the COTR is duly notified in writing no less than forty-eight hours in advance of the contemplated work and written approval for such is obtained. Devices include manual alarm devices, smoke and heat detectors, remote and graphic annunciators, main fire alarm panel and components to include; programming, voice alarm system, speakers and horns, and other audible and visual alarm devices. Additional components include wiring circuits and junctions, other alarm detection, control, ancillary, and emergency power operation devices. General Requirements Fire Alarm System Operability - The Contractor shall ensure that the fire alarm system is operable always except when being tested or repaired. When services require the system be turned off, the Contractor shall provide backup fire monitoring protection by providing sufficient personnel to perform the service and monitor the fire alarm system control panel until the system is brought back on line. All routine service visits shall be scheduled with the COR. Regardless of the reason for, or duration of a shutdown, the affected portion of the alarm system shall be tested to ensure that protection has been restored. The Contractor is responsible for obtaining all necessary permits and licenses required for performing fire alarm tests and inspections, at the contractor's expense. Hazardous Condition - If the Contractor encounters equipment that is in a condition that may endanger life or property, the Contractor shall immediately notify the COR. The Contractor shall also provide a written report which outlines the hazardous condition and recommended corrective action to the COR within 24 hours. The Government reserves the right to monitor services in accordance with the contract as deemed necessary to ensure the system is operating as required. Each contract employee must sign in with the COR when arriving on VA Property, and will be escorted while in the building. The Contractor shall not be permitted on VA property without displaying proper ID. The Contractor shall deliver the service report and test reports to the Contracting Officer Representation (COR) located in the Support Services Division (SSD), Room 154, 1600 E. Woodrow Wilson Ave, Jackson, MS 39216. Hours of Inspection- Inspections shall be performed during normal working hours, 6:00 AM - 6:00 PM, Monday- Friday, exclusive of federal holidays. All alarm system service visits must be coordinated and scheduled with the COR 48 hours in advance. All annual testing of the strobes and alarms are to be conducted between the hours of 6:00 PM 8:00 PM on a weekday. The Contractor shall report the results of inspections and tests in accordance with NFPA-recommended format, or as directed by the COR. Inspection reports will list each appliance and peripheral device; including audio, visuals, strobes, speakers and door holders that are connected to the fire alarm control panel, by device location and mapnet address, if such an address is available in the Fire Alarm Control Panel (FACP). Fire Alarm Inventory Changes The Contractor shall maintain an inventory of all active devices in the fire alarm system. COR shall inform the Contractor of any changes due to construction or other adjustments. Non-Contract Services - Those services not covered by this contract shall be negotiated between the Government and the Contractor and shall be procured through separate purchase agreements. The Contractor shall provide a scope of work, cost proposal and verification that technician(s) performing any non-contract work are properly certified. Contractor Requirements The Contractor agrees in accordance with NFPA 72, Section 14.2.3.6 (Service Personnel Qualifications and Experience). Service personnel shall be qualified and experienced in accordance with the requirements of 10.5.3 of the NFPA 72. The Contractor may be asked to remove persons who pose a threat to health, safety, security or property. The Contractor shall have enough qualified employees available to adequately and safely perform all work required under the terms of this contract. In accordance with NFPA 72, Section 10.5.3 (Inspection, Testing, and Service Personnel) Service personnel shall have the knowledge and experience of the testing requirements contained in this Code, of the equipment being serviced or maintained, and of the servicing or maintenance methods. The Contractor must demonstrate that its technicians are factory trained and certified for the specific type and brand of system being serviced, or who are certified by a nationally recognized certification organization acceptable to the authority having jurisdiction. All Contractor and Subcontractor personnel performing work in this contract must possess any required state, county, locality or other licenses or permits. Fire Alarm System Testing and Inspection Requirements The Contractor shall perform an annual system and inspection, smoke detector cleaning, 24-HR, 7-day emergency coverage, and a complete written notification of any deficiencies and recommendations for repair covering all fire suppression, detection, and audio-visual devices present in the VBA Building, Parking Garage and basement Storage Room. Service and inspect the ANSUL fire suppression system twice per each contract year in accordance with the testing methods and frequencies listed in the most recent edition of NFPA 72, National Fire Alarm Code. The Contractor shall perform control equipment testing utilizing NFPA 72, Section 7.6 Inspection, Testing, and Maintenance Documentation (SIG-TMS): Section 7.6.6 (Record of Inspection and Testing). The record of all inspections, testing, and maintenance as required by section 14.6.2.4 shall be documented using either the record of inspection and testing forms, Figure 7.8.2(g) through Figure 7.8.2(l), or an alternative record that includes all the applicable information shown in Figure 7.8.2 (g) through Figure 7.8.2 (l). Verify correct receipt of alarm, supervisory and trouble signals (inputs). Operation of evacuation signals and auxiliary functions (outputs). Circuit supervision; including detection of open circuits, ground faults and power supply supervision for detection of loss of AC power and disconnection of secondary batteries. Auxiliary functions to be tested include, but are not limited to: Voice and strobe signals Door release service Door unlock service Elevator recall Heat detector/shut trip for elevator mechanical rooms Fan shut down on activation of associated duct detectors The Contractor shall confirm that all auxiliary functions were tested and are functioning properly. The Contractor shall prepare and submit a report of the inspection and test results to the COR within 14 days after inspection and testing has been completed, which shall include a list of all appliances and peripheral devices; including audio/visuals, strobes, speakers, and door holders that are connected to the fire alarm control panel, by device location and mapnet address. The report must also contain the following: The Contractor s Inspection and Testing Form that includes all the information required by NFPA 72, most recent edition. The date of manufacture of fire alarm system and whether replacement parts are readily available. Any deficiencies noted, including inoperable or unsupervised devices or equipment, and devices that cannot be calibrated, tested or serviced in accordance with the manufacturer s recommendations. A cost proposal to correct any deficiencies, by device, separated into parts and labor costs. Inspection and testing shall be performed in the following locations: Veterans Benefits Administration Building Parking Garage Basement Storage Room In accordance with NFPA 72, section 14.2.4.1; Before proceeding with any testing, all persons and facilities receiving alarm, supervisory, or trouble signal s and all building occupants shall be notified of the testing to prevent unnecessary response. The Contractor shall notify the VBA Safety Office, VBA Police, Alarm Monitoring Provider, and the local fire department. The COR shall ensure that all building occupants are notified. In accordance with NFPA 72, section 14.2.4.2; At the conclusion of testing, those previously notified (and others, as necessary) shall be notified that testing has been concluded. The Contractor may be required to perform some inspections or tests outside of normal working hours. Any work that would be considered disruptive to occupants (testing audible devices, elevator capture, fan shutdown, etc.) shall be performed after normal working hours between 6:00 PM 8:00 PM on weekdays. The Contractor and COR will coordinate after-hours building access. Any damage to the fire alarm or associated equipment (fans, elevators, generators, pumps) caused by normal testing shall be repaired by the Contractor at no additional cost to the Government. At its discretion, the Government may have representatives present to witness any or all such tests. All costs associated with this damage shall be borne by the Contractor. Equipment list: Item Number Description 1 Backflows- 8; (2 domestic water, 2 irrigation water, 2 on chilled water makeup, 1 in basement on main supply, 1 on antifreeze loop) 2 Kitchen Hoods- 1 hood with 3 links 3 FACP-4100U 4 Batteries-2 5 Ducts-13 6 Flame Det-1 7 Heats-7 8 Smokes-70 9 Pulls-35 10 Water Flows-15 11 ZAMs-7 12 Elevator Recall 13 AV-67 14 Annunciator-1 15 VO-7 16 Tampers-30 17 Horn-1 18 Power Supply-2 19 Extinguishers-up to 75 20 2 wet system with 16 total zones 21 1 fire pump 22 1 antifreeze loop Repairs and Repair Charges Repairs are defined as unscheduled work to repair or modify the fire alarm system, or to correct recurring system and/or equipment malfunction(s) or deficiencies identified during testing. All repairs must be authorized by the Contracting Officer (CO) or a representative before any work begins. The Contractor must be able to secure replacement parts for the system within 24 hours for the central processing unit (CPU), controller, monitoring and signaling cards, display boards, and other critical parts that may be required to restore the system to fully functional. If a replacement part is no longer available, the Contractor shall provide a replacement part model number and cost to the contracting officer. When repairs are made that require replacement parts, The Regional Office shall issue a separate purchase order to cover the cost of these parts when funding is approved and authorized by the contracting officer. When the Contractor identifies a repair need, they shall notify the Contracting Officer before any repair work is started. If authorized, the Contractor shall complete the repair and submit a written report which contains the following: Details the deficiency and suspected causes Nature of the repair work provided List of any replacement parts used The number of hours needed to complete the work Once corrected, all deficiencies shall be tested according to the requirements in NFPA 72, most recent addition. The Contractor shall provide a written record of all alarm system repairs upon request. Safety Requirements The Contractor shall adhere to all OSHA, EPA, NFPA Life Safety Codes, and all other regulatory requirements. In performance of this contract, the Contractor shall follow VBA safety policies and standards for safe work practices and take such safety precautions as the Safety Officer or designee may determine to be reasonably necessary to protect the lives and health of occupants of the building. Employee, visitor, and Contractor personnel safety best practices shall be adhered to always. The Contractor is responsible for the safety and health of his/her employees. The Contractor shall submit to the Contracting Officer, prior to the start of the contract, the Safety Data Sheets (SDS) for all potentially hazardous materials (lubricants, cleaners, working fluids, etc.) to be used in the facility during performance of the contract, and will not use in the facility, any materials which have not been cleared in advance with COR. SDS for new chemicals shall be furnished concurrently with the arrival of the chemical on site. The Contractor shall maintain a copy of all SDS at the chemical storage site in a location accessible to Regional Office personnel to assure compliance with all laws and requirements regarding the Right to Know law. The Contractor is responsible for identifying, providing and maintaining all personal protective equipment (PPE) required to perform the duties outlined in the contract. Additionally, the Contractor is responsible for identifying and adhering to all applicable safety program guidelines (lockout/tag out, confined space entry, universal precautions, etc.) required to perform the work. Contractor is responsible for providing and documenting all required safety training and proper use of PPE to their employees. Training documentation shall be provided to the COR upon request. The Contractor shall be notified of any non-compliance with the provisions of the contract. The Contractor shall, after receipt of such notice, immediately correct the condition and notify the COR/contracting officer in writing that the condition has been corrected. If, in the opinion of the Regional Office Safety Officer or designee, the compliance condition is life threatening, he/she shall instruct the Contractor to stop work until the condition has been corrected. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order halting all or any part of the work, and Contractor may be held in default. The Contractor shall bear all costs associated with a stoppage of work or time spent correcting any safety hazards. The Contractor shall provide the following information within ten (10) working days after award of the contract: A detailed listing of safety programs and procedures that will be followed by the Contractor during the performance of the contract, and the work activities indicating when such procedures would be required. A detailed listing of the personal protective equipment (PPE) which Contractor personnel will utilize during the performance of the contract, and the work activities indicating when such equipment would be required. Safety Data Sheet (SDS) for any chemical(s) utilized by the Contractor in the performance of this contract. The Contractor is responsible for the supervision of all its employees while on government property. It is the Contractor s responsibility to assure compliance with the scope of work and the requirements of this contract. Provisions provided in the scope of work are not intended to relieve the Contractor of this responsibility. In the event of an accident or injury, the Contractor shall submit a written report to the COR within five work (5) days of the incident detailing the malfunction, accident or injury involved on site. The report shall state the cause of the injury or accident, and a list of completed or scheduled corrective actions to avoid further incidents. Contractor Employee Conduct Contractor shall ensure that their employees comply with the following at all times while on VBA property: Contractors may not use government office equipment or computers, and should never search through desks, cabinets or files. Government telephones may be used for contract related work only. The Contractor shall follow all applicable VA regulations and directives and will comply with any direction or instructions from government officials including the contracting officer (CO), COR, federal police officers, inspectors, etc. The Contractor shall leave areas where it performs work neat, clean, and orderly. Invoices Invoices will be submitted no later than the 5th day of each month to the SSD mailbox (contact@example.gov), COR and Contracting Officer. A proper invoice is defined as one that identifies the contractor s name, phone number, contact information, invoice date, and itemized amount of billable work performed. Invoices shall include the following: Contact Number Company Name and Address Invoice Date Invoice Number (Note: Each invoice must have a different Invoice Number) Contract Number Obligation Number Description of services provided as well as referencing the appropriate Contract Line Item Number (CLIN). This way, the proper CLIN can be billed for the Invoice. Dates of services Terms for any discount for prompt payment The information page for the Financial Service Center of the Department of Veterans Affairs that includes information regarding electronic invoice submission can be referenced at: http://www.fsc.va.gov/einvoice.asp NOTE: Invoices for payment may be rejected if all information required by FAR Clause 52.212-4(g) is not included. Invoices without the required information will be returned. Invoices must be approved by the Contracting Officer s Representative prior to payment release. Invoices without the required information will be returned. All invoices must include the assigned purchase order number and be submitted within 10 days following the month of service. Failure to comply with all terms and conditions of this contract shall result in invoices/claims submitted for reimbursement during that period to be considered incomplete. Interest penalties imposed under the Prompt Payment Act shall not apply to incomplete invoices or invoices received after the established invoice due date. Contractor shall identify and assign personnel to be the liaison for billing purposes. The Department of Veterans Affairs Financial Service Center (FSC) is the designated agency office for invoice receipt in accordance with the Prompt Payment Act (5 CFR Part 1315). FSC or its designated representative may contact the vendor to provide specific instructions for electronic submission of invoices. The vendor shall be responsible for any associated expenses. FSC may utilize third-party contractors to facilitate invoice processing. Contractor Remittance Address: All payments by the Government to the Contractor shall be made by Electronic Funds Transfer (EFT). Special Contract Requirements Safety Requirements: To protect the lives and health of occupants of the buildings, the Contractor in the performance of this Contract shall take such safety precautions as the CO, or his designate, may determine to be reasonably necessary. The CO, or his designate, shall notify the Contractor of any non-compliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed. Such notice, when served on the Contractor or his representative shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the CO may issue an order, stopping all or any part of the work, and hold the Contractor in default. Noncompliance may result in Contract termination. Interference with Normal Functions: The Contractor s personnel are required to interrupt their work at any time so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility visitors, employees, equipment and emergency and/or service carts. These interruptions should only be occasional. Any interruptions considered to be excessive should be brought to the attention of the CO. Security Requirements All Contractors and Contractor personnel shall be subject to the same Federal security and privacy laws, regulations, standards and VA policies as VA, including the Privacy Act, 5 U.S.C. §552a, and VA personnel, regarding information and information system security. Each employee working in the Regional Office Building will be required to view a Security Video (duration of 45 minutes) and sign a rules of behavior form.

More opportunities from Department Of Veterans Affairs → Veterans Benefits Administration (36C10D)

Same awarding agency

NAICS: 624310
New
Federal
U006--VR&E Self-Employment Services RFI
Solicitation # 36C10D27Q0008
The Department of Veterans Affairs, Veterans Benefits Administration, is issuing a Request for Information to explore industry partnerships for Veteran Readiness and Employment self-employment services. This initiative aims to support eligible veterans with service-connected disabilities in achieving vocational goals through entrepreneurship and small business ownership. The government is seeking information on how experienced partners can provide subject matter expertise in business planning, feasibility assessments, market research, financial planning, and startup incubation to supplement existing services. The goal is to identify scalable service delivery models that can assist veterans in evaluating business concepts and successfully launching sustainable enterprises. While this is not a formal solicitation for award, the government is considering a potential multiple-award IDIQ contract structure with individual awards for four specific regions: Northeast, Southeast, Continental, and Pacific. Interested organizations must provide their business size, socioeconomic status, past performance in entrepreneurial support, and their capacity to serve specific geographic areas using the provided Areas of Consideration Interest Form. Responses must be submitted to Contracting Officer Edward Bradford by November 25, 2026, and must adhere to a 10-page limit using Times New Roman, 12-point font.
Vocational Rehabilitation Services

POSTED

1 day ago

DEADLINE

in 28 days
View Details
NAICS: 332216
Federal
Tools for Veteran
Solicitation # 36C10D26Q0171
Solicitation 36C10D26Q0171 is a competitive Small Business set-aside request for quotation issued by the Department of Veterans Affairs for the procurement of brand-name Snap-on tools. This one-time, definite-quantity purchase order is specifically for a comprehensive set of automotive and mechanical tools, including socket sets, pliers, power kits, and diagnostic equipment, to be delivered to a Veteran's residential address in Malvern, Pennsylvania. The government has explicitly stated that this is a brand-name-only requirement, and no equal or substitute products will be accepted. All items must be delivered within 60 days of the receipt of the delivery order, and shipping costs must be included in the total quoted price. The award will be made as a single all-or-none purchase order to the responsible offeror whose proposal is most advantageous, with price and technical factors weighted equally. Technical evaluations are conducted on a pass/fail or acceptable/unacceptable basis, focusing on the offeror's ability to provide the exact part numbers and accessories listed in the technical specifications and their estimated delivery timeframes. Quotations must be submitted in three distinct volumes covering technical details, pricing, and administrative certifications. The final deadline for the receipt of offers is October 23, 2026, at 2:00 PM EDT.
Saw Blade and Handtool Manufacturing

POSTED

7 days ago

DEADLINE

in 25 minutes
View Details
NAICS: 333310
Federal
3550--Project Name: Veteran Self-Employment Plan – AI Vending Machines; Project Number: None; and Station Location: Sioux Falls, South Dakota, Veterans Affairs Regional Office (VARO), Veteran Readiness and Employment (VR&E) Division
Solicitation # 36C10D27Q0007
Solicitation 36C10D27Q0007 is a Request for Quotation issued by the Department of Veterans Affairs, Veterans Benefits Administration, for the acquisition of nine artificially intelligent-based vending machines. This requirement supports a Veteran Self-Employment Rehabilitation Plan in the automated retail industry, with the equipment being delivered to Rapid City, South Dakota. The procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope includes the delivery of various AI smart coolers, including compact single-door, high-capacity with freezer capabilities, premium single-door, and large double-door models. All equipment must be new commercial-off-the-shelf products meeting the minimum salient characteristics defined in the Statement of Work. The contract will be awarded as a Firm-Fixed-Price Purchase Order using the lowest-price technically acceptable (LPTA) methodology. Technical acceptability is based on the product specifications for the machines, while price evaluation considers the total proposed cost across all contract line items. The period of performance is ninety calendar days from the receipt of the purchase order. Due to the lack of a loading dock at the delivery site, the contractor is required to provide a vehicle equipped with a liftgate for offloading. Payments will be processed electronically via the VA's Electronic Invoice Presentment and Payment System.
Commercial and Service Industry Machinery Manufacturing

POSTED

9 days ago

DEADLINE

in 5 days
View Details
NAICS: 333914
Federal
Mobile Spray Polyurethane Foam (SPF) Application System Intergration
Solicitation # 36C10D26Q0209
The Department of Veterans Affairs, through the Veterans Benefits Administration, is soliciting quotations for a firm-fixed-price purchase order to deliver a fully integrated and operational Mobile Spray Polyurethane Foam (SPF) Application System. This project supports a Veteran's self-employment services plan under the Lincoln VA Regional Benefit Office in Nebraska. The selected contractor will be responsible for transforming a Veteran-furnished trailer and previously acquired equipment into a turnkey end item. This scope includes the procurement of additional brand-name or equal equipment—such as a proportioner package, transfer pump, spray gun, compressor, diesel generator, and vacuum system—as well as the necessary design, layout, integration, configuration, testing, commissioning, and hands-on training for the Veteran. Award will be based on the best overall value, with technical factors weighted significantly more than price. Technical evaluations will focus on the proposed design, adherence to safety and regulatory standards—specifically OSHA, NIOSH, and NFPA requirements for isocyanate handling and electrical safety—and the robustness of the testing methodology. The total period of performance is limited to 30 calendar days following the delivery of the trailer to the installation site. Final acceptance and payment are contingent upon a successful operational demonstration, the delivery of a complete as-built documentation package, and written verification of training. Verified Veteran-Owned Small Businesses (VOSB) may receive a 3.0% price reduction for evaluation purposes.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

28 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS