Loveland Reservoir Fishing Relocation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sweetwater Authority is implementing the Loveland Reservoir Fishing Relocation and Trail Safety Improvements Project in San Diego County, California. This initiative builds upon a previous relocation of public fishing access from U.S. Forest Service land to Authority property, which established a parking area, access trails, and shoreline easements. The current phase focuses on safety-oriented enhancements to the existing trail network to address hazards such as steep drop-offs, eroded surfaces, and informal user-created paths that threaten public safety and local vegetation. The scope of work includes general trail safety and stabilization improvements, the installation of a pedestrian bridge at a drainage crossing, and the construction of a small observation deck for scenic viewing and wildlife observation. These efforts are designed to provide a clearly defined recreational path and minimize unauthorized travel through surrounding habitats. Administrative actions for this project include a Notice of Determination filed in September 2026, with associated filing fees paid to the California Department of Fish and Wildlife and county administrative offices. The project is categorized under NAICS code 237990.

General Info

Sweetwater Authority will improve trail safety and access at Loveland Reservoir, San Diego.

Agency

California → Sweetwater Authority

Place of Performance

Japatul Road, approx. 0.6 miles east of the intersection of Japatul Rd and Sequan Truck Trail, CA, 91901

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sweetwater Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Sweetwater Authority
Office AddressN/A
Contacts
Israel MarquezLand and Environmental Manager

Full Description

Show more
The Final 1996 Mitigated Negative Declaration evaluated the relocation of public fishing access from U.S. Forest Service land to Sweetwater Authority (Authority) property on the eastern portion of Loveland Reservoir. To maintain public access, the Authority granted the Forest Service an easement encompassing a parking area, reservoir access trail, and a 50-foot wide shoreline strip above the high-water mark. The relocation project included construction of turn lanes from Japatul Road and a 0.78-acre graded parking area accommodating approximately 50 vehicles. Additional improvements included installation of trash receptacles, restrooms, informational trailhead signage, and erosion control measures along the access trail. A portion of the California Riding and Hiking Trail was also realigned to avoid conflicts with the new driveway, while planning for future amenities including expanded restroom facilities and a floating pedestrian bridge. Sweetwater Authority is now proposing safety-oriented improvements along the existing trail network to enhance public safety, improve trail stability, and maintain long-term recreational access. The existing trail contains narrow segments, steep drop-offs, eroded surfaces, and informal user-created paths that present safety concerns and contribute to disturbance of adjacent vegetation and habitat. In some locations, recreationists currently use branches, fallen tree trunks, or logs to cross a drainage channel or travel through vegetated areas, potentially exposing users to hazards such as unstable footing, falls, snakes, poison oak, ticks, and other trail-related risks. The proposed Project would include general trail safety and stabilization improvements, installation of a pedestrian bridge at the drainage crossing, and construction of a small observation deck adjacent to the existing trail alignment. The observation deck would provide a designated elevated vantage point for scenic viewing, wildlife observation, exercise, and passive recreation. Collectively, these improvements are intended to provide safer and more clearly defined recreational access within the existing trail vicinity while minimizing informal travel through surrounding areas.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 15 hours ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS