Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Florida was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mechanical Refurbishment Services for Belt Press #4 (Full Rebuild)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

A complete mechanical rebuild of Belt Press #4 is required, encompassing full disassembly, replacement of all worn or defective components, precise reassembly, alignment to original equipment manufacturer specifications, and rigorous system testing to ensure optimal performance. The work must be executed to OEM standards, ensuring the restored equipment meets or exceeds its original operational efficiency and reliability. This subcontract opportunity is open for bidding under NAICS code 811310, with a response deadline of July 2, 2026, and is associated with the Public Utilities agency in Florida. All work is to be performed at the designated facility, though specific location details are not provided in the posting. Interested parties must submit proposals prior to the stated deadline through the linked procurement platform.

General Info

Mechanical rebuild of Belt Press #4 to OEM standards, due July 2, 2026, for Florida Public Utilities.

Agency

Florida → Public UtilitiesView Agency

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and MaintenanceView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of 21169326.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Belt Presses Services & Maintenance Agreement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Utilities
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Public Utilities
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Complete mechanical rebuild of Belt Press #4, including disassembly, component replacement, reassembly, alignment, and system testing to OEM standards.

More opportunities from Florida → Public Utilities

Same awarding agency

NAICS: 237310
SLED
Johnson Street and I-95 Drainage Culvert (Project No. 24-11064)
Solicitation # IFB-394-26-JM
The City of Hollywood, Florida, is soliciting bids under IFB-394-26-JM for the Johnson Street and I-95 Drainage Culvert project (Project No. 24-11064). This infrastructure project aims to mitigate neighborhood flooding caused by runoff from the City and FDOT, which currently overflows from an undersized storage ditch. The scope of work includes raising the eastern top-of-bank of the FDOT I-95 ditch to approximately 5 ft-NAVD, re-grading the ditch south of Johnson Street, and installing approximately 165 linear feet of 43-inch by 68-inch elliptical reinforced concrete pipe. Additional requirements include the installation of junction boxes, headwalls, and the restoration of pavement, sidewalks, and chain-link fencing. The contract will be awarded to the responsive and responsible bidder offering the lowest price. Qualified contractors must be prequalified by the Florida Department of Transportation in Drainage (DR) and adhere to strict compliance standards, including the Florida Trench Safety Act, prevailing wage requirements, and ADA compliance for sidewalk restoration. The project timeline specifies a commencement within 10 calendar days of the Notice to Proceed, with substantial completion required within 180 calendar days and project closeout within an additional 30 days. Financial security is mandated through a 5% bid guaranty and subsequent performance and payment bonds. Bids must be submitted electronically via the OpenGov portal by September 22, 2026.
Highway, Street, and Bridge Construction

POSTED

24 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS