Middle Mile Broadband Network Project: ADF-F17-CD4-UG6; 04-26-6-BB-0549

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

American Dark Fiber, in partnership with the California Department of Technology, plans to install approximately 35 linear feet of new underground fiber optic infrastructure within Caltrans right-of-way along State Route 17 in Los Gatos, Santa Clara County, between Post Miles 6.539 and 6.541. The project involves open trenching to lay 4-inch high-density polyethylene conduit containing fiber optic cable, with all work confined strictly to existing transportation corridors and previously disturbed areas without expanding beyond current rights-of-way. Trenching operations will adhere to a certified traffic control plan, and all open trenches must be safely filled or covered during non-working hours to maintain public safety and minimize disruption. The project is identified under the title Middle Mile Broadband Network Project: ADF-F17-CD4-UG6; 04-26-6-BB-0549 and was posted as a forecast on July 2, 2026. The lead agency is Caltrans, District 4 - Bay Area/Oakland, with primary environmental and permitting oversight managed by Brian Gassner, Environmental Branch Chief, reachable at 510-506-0372. Technical coordination with American Dark Fiber is handled by Zack Baayen, VP of Operations, at 949-933-8688. All construction activities are designed to align with regulatory and environmental compliance standards and are limited to the footprint of existing roadway infrastructure to avoid new land disturbance.

General Info

American Dark Fiber to install 35 feet of fiber optic conduit in Caltrans right-of-way along State Route 17 using open trenching.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Los Gatos, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Middle Mile Broadband Network Project 04-26-6-BB-0549

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Brian GassnerEnvironmental Branch Chief
Zack BaayenVP of Operations

Full Description

Show more
American Dark Fiber, in coordination with the California Department of Technology, proposes installation of approximately 35 linear feet of new underground fiber optic infrastructure using 4-inch high-density polyethylene conduit with fiber optic cable within Caltrans right-of-way along State Route 17 in the City of Los Gatos, Santa Clara County, California, between Post Miles 6.539 and 6.541. Construction activities include open trenching and installation of associated conduit and fiber optic facilities. All trenching will be conducted in accordance with the traffic control plan, and open trenches will be filled or covered during non-working hours. All work will occur within existing roadway rights-of-way and previously disturbed transportation corridors. No expansion beyond existing rights-of-way is proposed.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Federal
Feeder 7 Repair
Solicitation # W50S8526BA007
The U.S. Air Force, through the W7NF Uspfo Activity Miang 127, is preparing to issue an Invitation for Bids under solicitation number W50S85-26-B-A007 for the construction of Electrical Repair Feeder 7 at Selfridge Air National Guard Base in Michigan. This is a firm fixed-price contract entirely set aside for small businesses under FAR 19.5, with the NAICS code 237130 for Power and Communication Line and Related Structures, and a size standard of $45 million. The project requires the contractor to furnish all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to complete approximately 5,706 feet of new underground and overhead conductors, demolition of existing cables, full-depth pavement repairs, mill/overlay, crack repairs, and associated site restoration work along Perimeter Road and Jefferson Ave. All work must strictly adhere to Drawings VGLZ262005 Repair Feeder #7, the Statement of Work, and project specifications, with any conflicts resolved in favor of the more stringent or higher-quality requirement. A Macomb County Soil Erosion Permit is mandatory and the responsibility of the contractor to obtain and pay for. The contract period is 240 calendar days from notice to proceed, inclusive of inspection and punch list items. The solicitation is being issued under FAR Part 14 procedures, with award determined solely on price and price-related factors. The prime contractor must comply with limitations on subcontracting, prohibiting payments exceeding 85 percent of the contract value (excluding materials) to non-similarly situated subcontractors under FAR clause 52.219-14(e)(3) with deviation 2021-O0008. All bidders must be registered in SAM.gov, and inquiries must be submitted in writing via email to TSgt Jack Garrettson. The formal solicitation is tentatively scheduled for release on July 13, 2026, with a pre-bid conference on July 22, 2026, and bid opening anticipated on or about August 31, 2026. The estimated contract value ranges between $1 million and $5 million, with the final amount to be determined upon bid submission.
W7NF Uspfo Activity Miang 127

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 237130
New
Federal
Request for Information - Sentinel Utility Infrastructure, Malmstrom Air Force Base, MT
Solicitation # W912DW26S1CE0
The U.S. Army Corps of Engineers, Seattle District, is issuing this Request for Information to gather market intelligence for the Sentinel Utility Infrastructure Project at Malmstrom Air Force Base, Montana. This critical enabling project supports the modernization of the land-based intercontinental ballistic missile force by constructing a comprehensive utilities distribution system, including electrical distribution and substation expansion, water and wastewater systems, natural gas service, and a fiber-optic telecommunications backbone. The scope also includes associated site work such as grading, drainage, and access paving. The project is estimated to cost between 160 million and 200 million dollars with an anticipated period of performance of approximately 1,278 calendar days. Because this infrastructure is on the critical path for the overall Sentinel beddown, any schedule delays will impact all subsequent facility construction. The government intends to utilize Other Transaction Authority under 10 U.S.C. section 2808a, meaning the agreement will not be subject to the Federal Acquisition Regulation or standard small-business set-aside rules. The proposed acquisition strategy employs a Construction Management at Risk approach divided into two phases: a preconstruction collaborative phase for constructability reviews and cost development, followed by an at-risk construction phase based on a negotiated Guaranteed Maximum Price. Design is nearly complete and is being managed by Jacobs Engineering, who will remain the Designer of Record. Interested parties must respond via an online questionnaire and may submit a supplemental capabilities statement of no more than five pages to Kyla Couch by 10:00 AM Pacific Time on August 28, 2026. Selection will be based on a trade-off process evaluating qualifications, past performance, proposed approach, commercial terms, and price.