Minor Alteration No. WA2026108 – Utility Installation for Natomas Power Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Minor Alteration No. WA2026108, managed by the Central Valley Flood Protection Board, involves the installation of temporary utility infrastructure to support a larger solar farm project connecting to the Sankey Diversion facilities. Located on the Reclamation District No. 1000 Unit No. 01 Sacramento River left bank levee in Sutter County, the project consists of three primary components: one temporary utility pole set 12 feet deep on the waterside of the levee, approximately 80 linear feet of underground conduit installed at a depth of four feet leading to an existing control building, and overhead power and fiber optic lines crossing the levee crown with a minimum vertical clearance of 25 feet. All construction activities, including the use of controlled low-strength material for backfilling the pole and utility trenches, must strictly adhere to California Code of Regulations Title 23 Waters Division 1 standards. The temporary utility pole is positioned to remain above both the 100-year and 200-year water surface elevations and is situated within the original waterside levee prism. This project has been declared exempt from the California Environmental Quality Act under categorical exemptions Section 15303 and 15304.

General Info

Temporary utility installation for solar farm project on Sutter County levee, WA2026108.

Agency

California → Central Valley Flood Protection Board

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

WA2026108 - Notice of Exemption for Natomas Power Project

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist
Brett GrayGeneral Manager

Full Description

Show more
To install a temporary utility pole, overhead power and fiber optic line crossing, and associated underground conduits as part of the larger solar farm project that will connect to the Sankey Diversion facilities permitted by Board Permit No. 18491. The scope of work includes installing (1) the temporary utility pole, set to a depth of 12 feet and backfilled with controlled low-strength material (CLSM), on the waterside of the levee, (2) approximately 80 linear feet of underground conduit from the utility pole to the existing control building at a depth of approximately four feet and backfilled with CLSM, and (3) an overhead power and fiber optic line that crosses the levee crown with a minimum vertical clearance of 25 feet. The base of the temporary utility pole sits above both the 100-year and 200-year water surface elevation. The pole will be set within the prism of the original waterside levee as originally constructed with the original federal project; the temporary pole and utility trenches will be backfilled according to Title 23 standards. All aerial clearance for overhead lines, construction activities and placement of materials will comply with California Code of Regulations, Title 23, Waters, Division 1 (Title 23) standards.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
SLED
Construction Of Adams Avenue Rule 20B Underground Utility District No. 22
Solicitation # 26-07
The City of Costa Mesa is soliciting bids for Project No. 26-07, the construction of the Adams Avenue Rule 20B Underground Utility District No. 22. The project involves the relocation of existing overhead electrical and communications facilities underground along Adams Avenue, from Redwing Circle to Albatross Drive. The scope of work includes the installation of conduits, vaults, manholes, and service laterals, as well as the full restoration of affected public and private property, such as pavement, sidewalks, and landscaping. All work must comply with the technical specifications and plans approved by Southern California Edison, AT&T, and Charter Spectrum. The contract will be awarded to the lowest responsive and responsible bidder based on the total base bid amount. The project must be completed within 90 working days from the date of the notice to proceed. Key requirements include the provision of payment and performance bonds for 100 percent of the contract amount, adherence to prevailing wage laws for public works, and compliance with ADA accessibility and environmental standards. Payments will be made via monthly progress payment orders, subject to a five percent retention. Bids must be submitted electronically via the PlanetBids portal by October 13, 2026, and must include a notarized noncollusion affidavit and the required bid security.
CITY OF COSTA MESA

POSTED

about 21 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237130
New
Federal
Power Construction and Services II (PCS II) MATOC
Solicitation # W912BU26RA032
The US Army Corps of Engineers, Philadelphia District, is soliciting proposals for the Power Construction and Services II (PCS II) Multiple Award Task Order Contract (MATOC). This firm-fixed-price IDIQ contract aims to establish a pool of three to seven contractors to provide power construction and services in contingency or austere environments. The scope of work covers the United States Central Command (CENTCOM) Area of Responsibility and select European Command (EUCOM) countries, including Ukraine, Poland, Romania, Bulgaria, Kosovo, Bosnia, Norway, Turkey, Slovakia, and Greenland. The total shared contract capacity is 249,000,000 dollars, with a primary period of performance from June 7, 2027, to June 6, 2032. The contract encompasses single-source responsibility for the construction of low, medium, and high voltage electrical systems, as well as the operation and maintenance of power plants and distribution systems. Key requirements include the ability to provide personnel and equipment for preventive, scheduled, and emergency maintenance, as well as fueling operations for diesel generator sets. Award decisions will be based on a best-value tradeoff process, evaluating technical approach and past performance, with the combined non-priced factors being approximately equal in importance to price. Proposals must be submitted electronically via the PIEE Solicitation Module by October 13, 2026.
W2SD Endist Philadelphia

POSTED

about 23 hours ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS