Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

New Data Center Construction

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, involves upgrading life health safety systems within Hangar 250 at MCAS Cherry Point in Havelock, North Carolina. The scope of work encompasses architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price. Bidders must submit proposals by September 21, 2026, and those exceeding 150,000 dollars are required to provide bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and Buy American requirements. Key deliverables include a facility operating plan and manufacturer-provided training information. Administrative requirements include submitting invoices via Wide Area Workflow and providing a detailed schedule of prices within 15 days of the award. Quality control is heavily emphasized, requiring the Contracting Officer's acceptance of a QC plan before any construction work, other than mobilization and surveying, may begin.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project encompasses the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. All work must comply with ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, and proof of current Vermont state professional licensing and insurance. The award will not be based solely on the lowest bid, as ETR will evaluate technical alignment with the scope of work to minimize future change orders. Winning bidders must maintain active registration in SAM.gov and provide a Unique Entity ID. The contract incorporates various FAR clauses, including requirements for the Davis-Bacon Act, anti-lobbying certifications, and combating trafficking in persons. Payment terms are net 30 days, contingent upon the submission of a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 14 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract solicits a Service-Disabled Veteran-Owned Small Business to design and construct a new data center encompassing structural, mechanical, electrical, and security systems, with performance to be carried out at a location identified by zip code 06516. The requirement is structured as a subcontract under a SDVOSBC set-aside, ensuring eligibility and preference for businesses owned and controlled by service-disabled veterans, and falls under NAICS code 236220 for commercial and institutional building construction. The opportunity was posted on June 22, 2026, with a firm deadline for responses set for July 31, 2026, at 5:00 PM, and is managed by the Department of Veterans Affairs through the organization identified as Pcac (36C776). Contractors must be prepared to deliver a fully integrated facility meeting operational standards for reliability, scalability, and physical security, with all work required to be performed at the specified location.

General Info

SDVOSB contract to build data center at 06516 under VA, deadline July 31, 2026.

Agency

Department Of Veterans Affairs → Pcac (36C776)View Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

OH, 06516, USA

Set-Aside

SDVOSBC

Documents

This scope was carved out of 36C77626R0106.

The full solicitation package (35 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Z2DA--689-22-700 EHRM IU West Haven VAMC This ONLY for the PCAC VISN 1 Construction MATOC Pool

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Pcac (36C776)
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Veterans Affairs → Pcac (36C776)
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design and construct a new data center including structural, mechanical, electrical, and security systems.

More opportunities from Department Of Veterans Affairs → Pcac (36C776)

Same awarding agency

NAICS: 236220
New
Federal
Y1DZ--519-371 Construct New CLC Phase III Minor Construction - Big Spring, TX VAMC
Solicitation # 36C77626B0011_1
The Big Spring CLC Phase III Minor Construction project is a competitive fixed-price solicitation issued by the Department of Veterans Affairs for the construction of a new 10-bed Community Living Center cottage and associated site work at the West Texas VA Health Care System in Big Spring, Texas. This project is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated contract value between 10 million and 20 million dollars. The scope includes general construction, dirt work, and the installation of specialized healthcare systems, including Siemens Desigo fire alarms, Motorola Avigilon security cameras, and HID access control. The procurement includes a base bid for general construction and several deductive alternates to eliminate specific items such as electric fireplaces, kitchen millwork, and exterior planters. The contract is subject to strict regulatory and technical standards, including the Davis-Bacon Act for prevailing wages in Howard County, Texas, and the Buy American Act. Key technical requirements involve adherence to VHA Pre-Construction Risk Assessments (PCRA) for patient and staff safety, as well as specific standards for medical gas systems and firestopping inspections. Award will be made to the responsible bidder offering the most advantageous price. Bidders must provide electronic submissions, including a signed SF 1442, a bid guarantee on SF 24, and a certification of compliance regarding subcontracting limitations. Final acceptance is contingent upon a formal inspection by the Contracting Officer's designee and the contractor's quality control personnel.
Commercial and Institutional Building Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
Federal
Y1DA--573-21-106 EHRM Infrastructure Upgrades and Data Center Construction - Gainesville VAMC
Solicitation # 36C77626B0026
Solicitation 36C77626B0026 is a competitive design-bid-build project for the Department of Veterans Affairs to implement EHRM infrastructure upgrades and data center construction at the Malcom Randall VA Medical Center in Gainesville, Florida. The project involves replacing all data infrastructure across campus, including the removal of equipment and cabling from 59 telecom rooms, and the construction of a new 3,931 square foot data center facility. This facility will include a 1,177 square foot data center room, a generator room, and supporting spaces for mechanical, electrical, and HVAC systems. The contract is a firm-fixed-price award set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220, with a construction magnitude estimated between 20 million and 50 million dollars. The period of performance is approximately 921 calendar days from the notice to proceed, with work required to commence within 10 calendar days of that notice. Award is based on the lowest dollar value for the base bid. Key requirements include adherence to the Davis-Bacon Act for wage rates, strict compliance with VHA Infection Control Risk Assessment (ICRA) and Pre-Construction Risk Assessment (PCRA) protocols, and the use of specific brand-name systems for security, fire alarms, and building automation to ensure operational integrity. The contractor must maintain a comprehensive Quality Control organization and provide electronic bid bonds. Bids are submitted via email to the contracting office, with a final deadline of September 17, 2026.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
Federal
Y1DA--534-24-706 EHRM Data Center Upgrades Construction - Charleston
Solicitation # 36C77626B0027
Solicitation 36C77626B0027 is a sealed bid Invitation for Bid (IFB) issued by the Department of Veterans Affairs for the EHRM Data Center Upgrades project at the Ralph H. Johnson VA Medical Center in Charleston, South Carolina. This design-bid-build construction project is a competitive set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 236220, with an estimated construction magnitude between 2 million and 5 million dollars. The scope of work involves the demolition and renovation of approximately 1,000 gross square feet of the B200 Computer Room and associated rooftop HVAC equipment. Key infrastructure upgrades include the installation of redundant power distribution and UPS, improved computer room cooling, grounding and bonding, cable management, and raised floor modifications. The project also requires hazardous material abatement, specifically for asbestos-containing flooring and mastic. The contract is a firm-fixed-price agreement with a mandatory performance period of 365 calendar days, starting within 10 days of the notice to proceed. Award will be made to the responsible bidder based solely on the lowest price that is fair and reasonable. Technical requirements mandate the use of Gamewell FCI fire alarm systems and Siemens Desigo HVAC controls to ensure system compatibility. Bidders must submit their offers electronically by September 14, 2026, at 13:00 EDT, including a signed SF 1442, a bid guarantee on SF 24, and a certificate of compliance regarding subcontracting limitations. Compliance with Davis-Bacon prevailing wage rates and the Buy American Act is required. Final acceptance is contingent upon a series of inspections, including a contractor-led punch-out, a government pre-final inspection, and a formal final acceptance inspection.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS