Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Mid-AtlanticView Agency

NAICS

N/A

Place of Performance

ML: PENNS, USA

Set-Aside

8A

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Mid-Atlantic
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This WON scope is for multiple TF-1s: Repair/replacement of substations 1-3, replacement of distribution feeders and repairs to underground conduits and manhole systems. The project will be broken into phases. Feeder cables & connectors have faulted several times over the past couple years. Cables are getting shorter as faulted portions are cut to replace cable connectors. Majority of the Cables are 35+ years old which is well beyond the service life of 20 years. Few of them though the feeder lines are operational, are closer to 45 years of age. Remove all cables and connectors from each terminating manhole from north to south or east to west to facilitate pulling in new cables and replacing all dead break connectors, splices and "T"s. Proof test all cables at end of construction to ensure cables & connectors have adequate insulation properties. If conduit is not replaced inspection is necessary. Conduct phase rotation checks before demolition of old cables and after new cables are energized on all three phase transformers to ensure proper rotation of three phase electrical loads. Additional work needed will include setting up light plants to locations identified per feeder cable project and generators to facility as needed to include refueling of generator as needed. Scheduling each power outage well in advance to notify base populace.