Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Parkview Townhomes Project

Forecast
2025100346State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Parkview Townhomes Project is a residential development located at 550 West El Norte Parkway in Escondido, California, situated on a 4.96-acre site. The project involves a General Plan Amendment and a Zone Map Amendment to transition the land use from Professional Commercial to High Multiple Residential. The development proposes the construction of 70 townhomes across seven buildings, totaling 126,582 square feet. These units are divided into four distinct floor plans ranging from 1,110 to 1,576 square feet, with a maximum building height of 35 feet and 9 inches. The community will include approximately 51,496 square feet of open space, featuring recreational amenities such as a private community pool, a tot-lot children's park, a play lawn, and various seating areas. The project is currently in the environmental review and planning phase, guided by a Draft Initial Study and Mitigated Negative Declaration to ensure compliance with the California Environmental Quality Act. Comprehensive technical studies have been conducted to address air quality, noise, transportation, biological resources, and geotechnical stability. Key environmental considerations include the management of stormwater through a dedicated Quality Management Plan, mitigation of impacts on special status species, and the preservation of cultural and archaeological resources. Additionally, the project must adhere to specific regulatory standards, including the Title 24 Energy Code, CALGreen building standards, and ADA accessibility requirements for parking and pedestrian paths. Construction is anticipated to begin around April 2026 with an estimated duration of two years.

General Info

Escondido residential development proposing 70 townhomes on 4.96 acres with various recreational amenities.

Agency

California → City of Escondido

Place of Performance

550 West El Norte Parkway, West El Norte Parkway and South Iris Lane, Escondido, CA, 92025

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Escondido
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Escondido
Office AddressN/A
Contacts
Ivan FloresPrincipal Planner
Morgan WeintraubAssociate Project Manager

Interested Companies (1)

RECON EnvironmentalSan Diego, California

Full Description

Show more
The project site is in the City of Escondido, California, north of West El Norte Parkway on assessor parcel number 226-380-48. The project proposes a General Plan Amendment to amend the existing land use designation of SPA 13 Imperial Oakes Corporate Center to Urban IV and a Zone Map Amendment to amend the existing zoning from Professional Commercial (CP) to High Multiple Residential (R-4). The project also includes a Tentative Subdivision Map/Condominium Permit, a Major Plot Plan, and Design Review permit to construct 70 townhomes and associated recreational areas, including a tot-lot children 's park, play lawn, seating area, and private community pool. The project would include seven buildings totaling 126,582 square feet and the townhomes would be broken into the following four plans: 1. Plan 1 would consist of fifteen 1,110-square-foot town homes consisting of two bedrooms and two and a half bathrooms. 2. Plan 2 would consist of seventeen 1,186-square-foot town homes consisting of two bedrooms and two and a half bathrooms. 3. Plan 3 would consist of sixteen 1,380-square-foot townhomes consisting of three bedrooms and three and a half bathrooms. 4. Plan 4 would consist of twenty-two 1,576-square-foot townhomes consisting of three bedrooms and three and a half bathrooms. The townhomes would reach a maximum height of 35 feet and 9 inches. In addition, the project would include 51,496 square feet of open space (2,447 square feet for private patios, 1,810 square feet for private decks, 7,028 square feet for recreational areas, and 40,211 square feet for common areas). The project would demolish the existing single-family residence and ancillary structures. The Project also includes a Grading Exemption to allow for fill slopes within 50'–0" of the property line to be up to 40'–0" in height, cut slopes within 50'–0" of the property line to be up to 22'–0" in height, and a 1.5:1 cut slope along the norther portion of the project site; and an Administrative Adjustment to allow up to a 25% reduction in the rear yard setback requirement for the 1st and 3rd floor.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # RFP #27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The scope of work includes comprehensive renovations involving demolition of existing pavement, fencing, and amenities, as well as the installation of new heavy-duty concrete paving, a 27'x40' pavilion shade structure, and expanded athletic courts including additional pickleball courts. The project also encompasses site work, grading, stormwater treatment, and landscaping, including the installation of sod and specific UltraSite branded park furniture. All work must adhere to building codes and the full intent of ADA Title II guidelines. The project is scheduled to begin with a Notice to Proceed on December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals are evaluated on a 25-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project-specific approach. Awarded contractors must provide a Performance and Payment Bond for the total contract price and maintain all required insurance. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of each payment until the project is satisfactorily completed. Liquidated damages of $250 per day apply if the work is not completed within 90 calendar days of the Notice to Proceed. All submissions must be received electronically via the County's procurement portal by November 25, 2026.
PARKS ADMINISTRATION

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
22275 RB - Hague NE Bulkhead Rehabilitation
Solicitation # 22275 RB
The City of Norfolk, Virginia, is soliciting bids for the Hague NE Bulkhead Rehabilitation project (Solicitation 22275 RB), which involves the replacement of the concrete bulkhead at the eastern portion of the Hague. The scope of work includes bypass pumping, maintenance of flow in storm drainage systems, survey and vibration monitoring, wetland planting, and the disposal of contaminated soils, estimated at 695 tons for the North side and 315 tons for the South side. The project is structured as a Base Bid with three additives, with several items converted to lump sum costs. Performance must adhere to modified AIA A201-2017 General Conditions and technical specifications prepared by Moffatt & Nichol. The contract requires a performance bond and a labor and material payment bond, each for 100% of the contract price, and a bid security of 5% of the total bid. Work must commence within ten days of the Notice to Proceed and be completed within 700 calendar days. Bidders must be registered Virginia contractors and hold a City of Norfolk business license. All bids must be submitted electronically via the OpenGov portal by December 7, 2026, with all Requests for Information (RFIs) due by November 16, 2026. Quality control is managed through a CQC Plan and VDOT Form C-25, with final site inspection and acceptance conducted by the Contracting Engineer.
Public Works (D&C)

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS