Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Paving and Surfacing

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Paving and Surfacing involves the installation of durable surfacing for RV parking spaces and access drives for the Ocotillo RV Storage project located in Imperial County, California. The scope of work requires the contractor to lay the sub-base and apply either concrete or asphalt for 100 RV spaces and the associated drive aisles using ready-mix concrete and asphalt paving mixtures. The primary objective of the agreement is the delivery of a fully completed paved parking lot and access roads. This project falls under NAICS code 237310 and is coordinated through the state of California for performance within Imperial County.

General Info

Paving subcontract for RV parking and access drives in Imperial County, California.

Documents

This scope was carved out of CUP23-0029/MERG00157/IS24-0022.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CUP23-0029/MERG00157/IS24-0022 Ocotillo Rv Storage

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom CUP23-0029/MERG00157/IS24-0022 Ocotillo Rv Storage
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Imperial County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs durable surfacing for RV parking spaces and access drives for prime contractors on the Ocotillo RV Storage project in Imperial County, CA. Lays sub-base and pours concrete or lays asphalt for 100 RV spaces and drive aisles using ready-mix concrete and asphalt paving mixtures. Delivers a completed paved parking lot and access roads.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
STADIUM GATEWAY PARKING LOT SLURRY SEAL SERVICES
Solicitation # 26-27-12
The City of Anaheim is soliciting bids for slurry seal services at the Stadium Gateway Parking Lot, located at 1900 S. State College Blvd. The project involves cleaning and preparing approximately 158,000 square feet of asphalt, applying one coat of Type 1 slurry seal, and restriping the lot to its existing layout with two coats of paint and updated stenciling. All work must be completed within 45 calendar days of commencement, with the specific requirement that the application be finished in two moves over a single weekend. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including price, past performance, and the ability to meet all technical specifications. Qualified bidders must hold a valid California C-32 Parking and Highway Improvement Contractor's License and be registered as a Public Works Contractor with the Department of Industrial Relations to ensure the payment of prevailing wages. Required submittals include a bid bond, proof of insurance, and a completed vendor questionnaire. Upon award, the contractor must provide performance and labor and materials bonds equal to 100 percent of the annual contract value within 10 calendar days. The contract includes a one-year warranty against defects in workmanship and materials, and requires the submission of Safety Data Sheets for all hazardous substances used. Bids must be submitted electronically by December 18, 2026, and remain valid for 180 days following the closing date.
Convention/Sports/Entertainment

POSTED

about 6 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237310
New
SLED
P-020-170-002A Bridge Crossing and Trail Improvements at Patapsco Valley State Park – Mckeldin Area
Solicitation # BPM059427
Solicitation BPM059427 is an Invitation for Bids issued by the Maryland Department of General Services for the construction of a new pedestrian and equestrian bridge in the McKeldin Area of Patapsco Valley State Park. The project involves installing a 105-foot precast concrete bridge consisting of five arch culvert sections with architectural fieldstone facing and 54-inch high breakaway timber safety rails. Additional scope includes trail restoration and tree planting. All work must adhere to the 2026 MDOT-SHA Standard Specifications for Construction and Materials. Bids are due by January 11, 2027, via the eMMA portal, and the contract will be awarded by lot to the responsible bidder offering the lowest price. Key requirements for bidders include the submission of a Bid/Proposal Affidavit, a valid county construction firm license, and at least three professional references. The contract mandates a 25.00 percent MBE and 1.0 percent VSBE procurement goal. Financial guarantees include performance and payment bonds of 200,000 dollars if the award value exceeds that amount. Contractors are subject to prevailing wage rates, Buy American Steel requirements, and a one percent electronic transaction fee on approved invoices. Project completion is defined by the successful testing of all systems and the approval of the Department of General Services.

POSTED

about 9 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
2017 Fire Damaged Roadway Repairs
Solicitation # C02239
The City of Santa Rosa Transportation and Public Works Department is soliciting bids for the 2017 Fire Damaged Roadway Repairs project, which involves repairing pavement damage caused by the Tubbs Fire. The scope of work is focused on two primary roadway corridors: Bicentennial Way from Cleveland Ave to the Fountaingrove Pkwy on-ramp, and Fountaingrove Pkwy from Mendocino Ave to Daybreak Ct. Key deliverables include the provision of as-built drawings, the replacement of damaged striping with thermoplastic, and the maintenance and relocation of rural mailboxes. The project requires adherence to City Construction Specifications for Public Improvements, City Design and Construction Standards, and the most current Caltrans Standard Specifications. The contract will be awarded to the responsible bidder who submits the lowest responsive bid. Bidders must provide a bid bond of 10 percent of the maximum bid amount, and the successful contractor will be required to provide performance and payment bonds for 100 percent of the contract price. Performance requirements include strict equipment labeling, the submission of baseline and progress schedules, and compliance with ADA standards for curb ramps. The project is subject to prevailing wage requirements and requires the contractor to maintain workers compensation insurance. Bids must be submitted in a sealed envelope to the Transportation and Public Work Department office in Santa Rosa.
Transportation and Public Works Department of City of Santa Rosa

POSTED

about 9 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237310
New
SLED
Asphalt Rehabilitation At Diaz Road Facility
Solicitation # 265-2026
The Rancho California Water District is soliciting bids for solicitation 265-2026 to perform asphalt pavement rehabilitation and concrete flowline replacement at its former headquarters facility located at 28061 Diaz Road, Temecula, California. The scope of work includes the removal and replacement of approximately 16,510 square feet of asphalt to a depth of four inches, the milling and overlay of 7,150 square feet of asphalt, and the replacement of 52 linear feet of 6-inch concrete flowline across three locations. The project must be executed in two coordinated phases to ensure continuous access for commercial deliveries and businesses, with all work completed within 30 calendar days of the award and on-site construction finished within five consecutive calendar days of commencement. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid amount. Bidders must submit their proposals via the PlanetBids platform by November 25, 2026, at 2:00 p.m., and must provide bid security of at least 10% of the total bid amount. Mandatory requirements include current registration with the Department of Industrial Relations, compliance with California State Labor Code prevailing wage laws, and the submission of a non-collusion declaration and workers' compensation certification. The successful contractor will be required to provide performance and payment bonds equal to 100% of the contract price and must implement a comprehensive construction site safety plan. Payment may be structured as a lump sum upon project completion or through progress payments.
Procurement Department of Rancho California Water District

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → Imperial County

Same awarding agency

NAICS: 541620
New
SLED
Imperial County Lithium Valley Specific Plan
Solicitation # 2023120104
The Imperial County Lithium Valley Specific Plan (LVSP) is a comprehensive land use and zoning initiative authorized by Senate Bill 125 to develop lithium resources and renewable energy infrastructure within the Salton Sea Known Geothermal Resource Area. Spanning approximately 51,620 acres, the project aims to establish an environmentally conscious employment hub by streamlining the permitting process for geothermal energy production and lithium extraction, processing, and manufacturing. The plan introduces various land use designations, including Green Industrial, Manufacturing, Logistics, and Conservation, while incorporating an Agricultural Overlay to balance industrial growth with the preservation of prime farmland. This initiative is designed to support the national production of sustainable energy technologies, enhance local economic stability through excise and property taxes, and fund Salton Sea restoration and community benefits. The project is governed by a Program Environmental Impact Report (PEIR) and a Water Supply Assessment to ensure compliance with the California Environmental Quality Act and Senate Bill 610. Key operational requirements include a 40 percent local hiring goal for construction workers, the payment of prevailing wages, and strict adherence to Cal/OSHA and OSHA safety standards for hazardous materials and excavation. Environmental protections are prioritized through the use of qualified biologists for wildlife surveys, rigorous dust control measures, and the protection of sensitive cultural resources. The project involves extensive coordination with state agencies, including Caltrans for transportation impacts, the California Energy Commission for geothermal permitting, and the Department of Toxic Substances Control for hazardous waste management.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

N/A
View Details
NAICS: 812930
SLED
Linn Parking & Storage Project (CUP #25-0015, MERG #00165, IS #25-0033)
Solicitation # CUP #25-0015, MERG #00165, IS #25-0033
The Linn Parking and Storage project, identified by Conditional Use Permit #25-0015, Lot Merger #00165, and Initial Study #25-0033, involves the expansion of a parking and storage facility located at 1624 Gateway Road in Calexico, California. The project will merge three contiguous parcels to create a 7.1-acre site designed to accommodate up to 140 trucks and trailers and 60 passenger vehicles. The facility will operate 24/7 with approximately eight employees and will include mini-storage units for receiving customer packages from delivery companies. The expansion aims to improve traffic circulation and site safety, with projected daily traffic of 60 trucks and 30 passenger vehicles accessing the site via Gateway Road. The project was approved on September 9, 2026, following an environmental review that resulted in a Negative Declaration under the California Environmental Quality Act. Construction is scheduled to begin on June 2, 2026, with a phased timeline including demolition, site preparation, grading, building construction, paving, and architectural coating, concluding in late November 2026. Key requirements include compliance with Imperial County Fire Department standards, the installation of fire-rated access roads and water systems, and the submission of hazardous material management plans. The applicant is responsible for all costs related to land acquisition, infrastructure relocations, and the payment of water, sewer, benefit impact, and traffic mitigation fees prior to the issuance of building or grading permits.
Parking Lots and Garages

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
The Towers LLC (CUP26-0006/IS26-0007)
Solicitation # CUP26-0006
The Towers, LLC is proposing the construction of a Wireless Communication Facility in Niland, California, located at 307 E. Winslow Rd. The project consists of a 120-foot-tall, non-reflective, galvanized sky-blue monopole tower and related equipment situated within a 50-foot by 50-foot leased and fenced area. The primary objective of the facility is to enhance Verizon's 5G and 4G LTE coverage in the Calipatria area, specifically along Highway 111. The installation includes a 6-foot chain-link fence for equipment screening, internal cabling, FAA-compliant aircraft warning lighting, and an adjacent IID transformer, while water and sewer services are not required. The project is managed under Conditional Use Permit CUP26-0006 and Initial Study IS26-0007 by the Imperial County Planning and Development Services Department. An environmental review conducted under CEQA guidelines resulted in a Negative Declaration, concluding that the project will not have significant environmental effects. The Imperial County Planning Commission approved the project on September 9, 2026, with a Notice of Determination filed on September 17, 2026. Key regulatory requirements include compliance with FCC RF exposure standards, National Electrical Code standards, and the ability to support the co-location of two additional carriers. The applicant has requested a 10-year permit term and is subject to site restoration requirements and potential public benefit agreements with the Imperial Valley Emergency Communication Authority.
Power and Communication Line and Related Structures Construction

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 624229
SLED
NHHA (National Healthcare & Housing Advisors) CUP#26-0001, IS#26-0001
Solicitation # CUP26-0001
The applicant, National Healthcare & Housing Advisors, LLC, has requested a Conditional Use Permit to operate an Interim Recuperative Care and Transitional Housing facility within the Imperial Center Specific Plan Area, asserting that the proposed use is functionally analogous to an extended-stay hotel with integrated social services—a use already recognized under the plan. The facility will span approximately 27,000 square feet across two buildings, divided into three 9,000-square-foot suites, and will serve 80 to 100 clients while employing up to 50 local staff members. Operations will run continuously, 24 hours a day, seven days a week. Services include day habilitation, post-hospitalization recuperative care, behavioral health support, community health worker programs, a sobering center, enhanced care management, and street medicine, all aligned with NHHA’s CalAIM program aimed at achieving permanent housing stability for participants. Clients may receive services for an initial 90-day recuperative period, with the possibility of extending housing support for an additional six months. The project falls under the same regulatory review framework applied to hotels and transitional housing in the area, and its approval hinges on securing the conditional use permit, designated as CUP#26-0001.
Other Community Housing Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 221116
SLED
CUP23-0020/IS23-0026-Dogwood Geothermal Energy Project
Solicitation # GEO Heber Field Co. 2 Wells 06052026
The Dogwood Geothermal Energy Project is located on approximately 125 acres about one mile south of Heber in Imperial County, California. The project encompasses the construction and operation of a geothermal plant, associated facilities, a geothermal fluid pipeline, and solar energy facilities, including a 15 MW solar facility and a 7 MW parasitic solar facility. The scope of work specifically involves the installation of geothermal production and injection wells, which includes preparing well pads, drilling and completing the wells, and connecting them to the pipeline network. Under solicitation GEO Heber Field Co. 2 Wells 06052026, CalGEM has approved permits for Heber Field Company to install two specific geothermal wells, identified by API numbers 02591586 and 02591587. The project is governed by the California Environmental Quality Act and is based on an Environmental Impact Report prepared and certified by the Imperial County Planning and Development Services in August 2025. Final approval for the project was granted by the Imperial County Board of Supervisors on August 5, 2025, with subsequent permit approvals from the California Geologic Energy Management Division issued on June 5, 2026. The project site is located at 855, 853, and 602 Dogwood Road, Heber, CA, and must adhere to all adopted mitigation measures and monitoring plans specified in the environmental documentation.
Geothermal Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Parcel Map (PM) #02518/IS25-0022
Solicitation # PM#02518/IS#25-0022
Parcel Map #02518 and Initial Study #25-0022 involve the subdivision of an 8.83-acre agricultural property located at 604 W. Murphy Road in Imperial, California. The project, proposed by Josh Quintero and overseen by the Imperial County Planning and Development Services Department, aims to divide the land into four legal parcels to separate an existing shop and facilitate residential development. Parcel 1 will be approximately 4.85 acres, while Parcels 2, 3, and 4 will each be approximately 1.33 acres. Access to Parcel 1 and 4 will be via Murphy Road, and Parcels 2 and 3 will be accessed via Nance Road. The project has been processed under the California Environmental Quality Act, resulting in a Negative Declaration and a Notice of Determination stating that the subdivision will not have a significant environmental effect. Technical requirements include a parcel map prepared by a licensed California Land Surveyor or Civil Engineer using the North America Datum of 1983. Infrastructure mandates include the installation of an approved water supply for fire flow per California Fire Code, the construction of three driveways on Nance Road, and the installation of non-contiguous sidewalks. Additionally, the project requires a grading and drainage plan to prevent cross-parcel drainage and may necessitate financial security, such as a road improvement bond or letter of credit, for off-site improvements. Final recordation of the map is contingent upon providing a tax certificate and a subdivision guarantee.
Land Subdivision

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Heber 1 Parasitic Solar Energy ProjectThe Heber 1 Parasitic Solar Energy Project involves the development of a 20 megawatt solar energy facility and an interconnecting medium voltage cable line in unincorporated Imperial County, California. The facility is designed as a behind-the-meter system to provide parasitic load power to offset the auxiliary load of the existing Heber 1 Geothermal Plant, meaning it will not connect to or generate power for the transmission grid. The project will be located on approximately 121.44 acres of land, including a 106.19-acre solar field and a cable route of approximately 15.25 acres. Construction is anticipated to take 16 to 19 months starting in late 2025, spanning site preparation, project construction, and switch development and interconnection. The project is subject to a Conditional Use Permit and comprehensive environmental review under the California Environmental Quality Act. Key requirements include compliance with fugitive dust regulations, the implementation of a Water Quality Management Plan, and the execution of a Stormwater Pollution Prevention Plan. Extensive biological and cultural assessments have been conducted, including surveys for western burrowing owls, bat acoustics, and avian populations, as well as tribal cultural resource consultations. The project requires the use of approved botanical field surveyors and the implementation of a mandatory education program for all construction personnel. Additionally, the project applicant must participate in the Imperial County Public Benefit Program and enter into a public benefit agreement to cover associated costs and fees.
Solar Electric Power Generation

POSTED

10 months ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS