Pool Infrastructure Upgrade

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pool Infrastructure Upgrade project involves the rehabilitation and modernization of the dilapidated pool complex at Grover Hot Springs State Park in California. The scope of work focuses on bringing the facility into code compliance through the in-kind replacement of the hot and cold pools, the installation of ADA-compliant pool lifts, and the replacement of the concrete pool deck and hydronic heating piping. Facility improvements include modernizing the changing and locker rooms, replacing the lifeguard shack with a new tower, and constructing a 300 square foot ticket kiosk and storage structure. Technical upgrades include the replacement of all above-grade mechanical equipment, the installation of a new heat exchanger vault, and the trenching of essential site utilities such as storm drains, electrical conduits, and gas lines. The project also encompasses the replacement of perimeter fencing and handrails, as well as the salvage and replanting of native vegetation. All construction will occur within the existing footprint, and the contractor is responsible for the proper off-site disposal of demolished materials and the maintenance of storm water and erosion control measures throughout the project duration.

General Info

Modernizing Grover Hot Springs pool complex via infrastructure upgrades, ADA compliance, and facility improvements.

Agency

California Parks and Recreation, Department of

Place of Performance

Hwy 89 at Hot Springs Road, CA, 96120

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Brad MichalkStatewide CEQA Coordinator

Full Description

Show more
The project will rehabilitate, modernize, and bring into code compliance the existing, dilapidated Pool Complex at Grover Hot Springs State Park. The project consists of the in-kind replacement and minor modification of existing facilities entirely within previously disturbed soils, with no expansion of the facility's original footprint or capacity. Specific project components include: Pool and Deck Reconstruction: Demolition and replacement of the existing hot pool (approx. 22’ x 47’) and cold pool (approx. 25’ x 50’) in their identical dimensions; replacement of the concrete pool deck and 1,200 linear feet of integrated hydronic heating piping; and installation of two Americans with Disabilities Act (ADA) compliant accessible pool lifts. Building and Facility Improvements: Modernization and selective demolition of the existing changing/locker room to meet accessibility codes (including a 90 sq. ft. building addition and roof replacement); demolition of a 114 sq. ft. non-compliant lifeguard shack and construction of a new lifeguard tower; and construction of a new 300 sq. ft. ticket kiosk/storage structure with associated concrete retaining walls within an existing native plant garden area. Site Utilities and Mechanical Upgrades: Removal and replacement of above-grade pool mechanical equipment (pumps, controllers, chemical feeders) within the existing pump building; installation of a new site-cast heat exchanger vault; and trenching for underlying site utilities, including storm drains, electrical conduit for pool lighting, a 60-linear-foot liquid petroleum (LP) gas line, and dedicated pool piping (suction, return, skimmer, fill, and drain lines). Fencing and Landscaping: Removal and replacement of perimeter wood fencing, split-rail fencing, and metal handrails. Native plants within the ticket kiosk footprint will be salvaged and replanted in an adjacent 223 sq. ft. area. All excavated spoils and demolished materials will be hauled off-site and disposed of properly at an approved facility. Temporary Best Management Practices (BMPs) for storm water and erosion control will be installed prior to construction and maintained throughout the duration of the project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 9 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 16 hours ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS