Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Florida was posted on May 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Preventive and Corrective Maintenance for PARCS

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract focuses on the ongoing preventive and corrective maintenance of PARCS hardware and software systems. This includes routine inspections, software updates, troubleshooting, and emergency repairs to ensure continuous and reliable operation of the PARCS infrastructure. The maintenance services are critical for minimizing downtime and addressing any technical issues promptly. Scheduled as a subcontract opportunity under the NAICS code 811212, the contract is managed by an airport agency in Florida. The solicitation was posted on May 13, 2026, with a response deadline set for July 23, 2026. Although specific location details and points of contact are not provided, interested parties can access additional information through the designated procurement portal. The scope emphasizes both preventive measures and corrective actions to maintain system efficiency and operational integrity.

General Info

Maintenance of PARCS hardware/software, including inspections, updates, repairs; subcontract in Florida airport.

Documents

This scope was carved out of 26-P-32JD.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Parking Access and Revenue Control System (PARCS) and Parking Facilities Management Services at Daytona Beach International Airport (DAB)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Airport
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Airport
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Ongoing maintenance of PARCS hardware and software including inspections, updates, troubleshooting, and emergency repairs.

More opportunities from Florida → Airport

Same awarding agency

NAICS: 236220
New
SLED
Covered Walkway Phase 2
Solicitation # ITB AP 09-27
The Board of County Commissioners of Okaloosa County, Florida, is soliciting bids for the Covered Walkway Phase 2 project at the Destin-Fort Walton Beach Airport under solicitation number ITB AP 09-27. The scope of work includes the installation of canopy structures in Parking Lot B, the application of slip-resistant coating in the main terminal, and the installation of signage, Wi-Fi booster nodes, and upgrades to the PA and CCTV systems. Additionally, the project involves landscaping and the rehabilitation of existing lighting and public announcement systems. The base bid requires substantial completion within 200 calendar days from the Notice to Proceed, with potential extensions granted if bid alternates are awarded. The contractor must adhere to strict technical specifications, including FDOT Standard Specifications for Road and Bridge Construction, NFPA 70, and ADA accessibility guidelines. Key deliverables include the installation of electrical systems, video surveillance, and the provision of final record drawings and O&M manuals. Quality control measures require the construction of integrated mockups for approval by the Architect and Engineer, and all electrical components must meet specific UL and ANSI labeling standards. Contractual requirements include the provision of bid, performance, and payment bonds, as well as significant insurance coverage: 1 million dollars for general liability, 3 million dollars for professional liability, and 10 million dollars for umbrella liability. The agreement mandates compliance with Title VI of the Civil Rights Act of 1964 and requires prior written approval for any subcontracting. Performance is subject to a liquidated damages schedule based on the contract value in accordance with Florida Statutes.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 28 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS