Reclamation District 817 Gibbs Pond and 40 Mile Road Pipe Repair Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves replacing failed gravity flow drainage pipes at Gibbs Pond and 40 Mile Road within the north levee of Dry Creek to restore proper stormwater and irrigation drainage and enhance the structural integrity of the levee. Reclamation District 817 is leading the effort, with the Yuba County Water Agency providing interim construction financing through an approved loan to support the necessary improvements. The work is critical to maintaining flood control and agricultural drainage functionality in the Wheatland, California area, where the damaged infrastructure poses risks to both public safety and land usability. All project-related communications and coordination are managed through key personnel at Reclamation District 817 and the Yuba County Water Agency, with Tom Engler serving as the District Engineer and primary point of contact. Environmental oversight is provided by Jacob Vander Meulen and Jessica Nichols, ensuring compliance with environmental standards throughout the repair process. The project remains in the forecast stage as of July 28, 2026, with no solicitation number yet assigned, but the location of performance is clearly identified as Wheatland, California, and the effort is anticipated to proceed with focused environmental and engineering coordination.
General Info
Agency
NAICS
Place of Performance
Wheatland, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
