Reclamation District 817 Gibbs Pond and 40 Mile Road Pipe Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Reclamation District 817 Gibbs Pond and 40 Mile Road Pipe Repair Project is a forecast acquisition focused on replacing failed gravity flow drainage pipes within the north levee of Dry Creek in Wheatland, California. The primary objective of the work is to restore stormwater and irrigation drainage functionality and enhance the structural integrity of the levee. The project is classified under NAICS 237990 for other heavy and civil engineering construction and is supported by interim construction financing provided by the Yuba County Water Agency. Administrative and environmental compliance is a central component of the project, with a Notice of Determination filed on July 23, 2026, following a project approval on July 22, 2026. The project adheres to the California Environmental Quality Act (CEQA), utilizing a Negative Declaration to certify that the work will not have a significant environmental effect. Key project contacts include Tom Engler as the District Engineer for Reclamation District 817, as well as environmental staff from the Yuba County Water Agency. While the project is documented through various state clearinghouse and CEQAnet filings, specific contract values, performance periods, and formal procurement evaluation factors are not provided in the available documentation.

General Info

Replace damaged drainage pipes at Gibbs Pond and 40 Mile Road to restore flood control and agricultural drainage in Wheatland, California.

Agency

California → Reclamation District 817

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Wheatland, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Gibbs Pond and 40 Mile Road Pipe Repair Project

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Reclamation District 817
Contacts3 people available
OfficeN/A
Organization / Agency
California → Reclamation District 817
Office AddressN/A
Contacts
Jacob Vander MeulenEnvironmental Manager
Jessica NicholsSenior Environmental Scientist
Tom EnglerDistrict Engineer

Full Description

Show more
The purpose of the project is to replace failed gravity flow drainage pipes at Gibbs Pond and 40 Mile Road within the north levee of Dry Creek to restore storm water and irrigation drainage and improve levee integrity. Yuba County Water Agency, acting as a Responsible Agency, approved a loan to provide interim construction financing for the project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter; structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting; and specialized electrical and piping installations. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 17, 2026. The project is partially funded by the Water Infrastructure Finance and Innovation Act administered by the EPA, making it subject to the American Iron and Steel provisions, Davis-Bacon Related Acts, and DBE Program requirements. Eligible bidders include DBE, SBE, MBE, WBE, SBRA, LSFA, and HUB Zone small businesses, with DBEs required to provide valid certification from recognized bodies such as the US EPA or SBA. Qualified respondents must hold a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums.
Kiewit Infrastructure West Co.

POSTED

about 14 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Oahu, Hawaii. This firm-fixed-price contract, with an estimated value between 1 million and 5 million dollars, involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal at an approved offshore site south of Oahu. The scope also includes vegetation clearance and revetted mole repairs, such as stone rework, filling voids with additional stone, and root removal. The period of performance is 200 calendar days from the receipt of the Notice to Proceed. The solicitation is set aside for HUBZone Small Businesses, who receive a 10 percent price evaluation preference. Award is based on the lowest responsive bid that complies with all material respects of the invitation. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act for wages, and the appointment of key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Technical acceptance is based on third-party multi-beam hydrographic surveys and strict quality standards for stone materials. Bids must be submitted physically via commercial carrier or in-person by September 30, 2026, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS