2026 Monitoring Well Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Consolidated Irrigation District is preparing to construct eight new groundwater monitoring wells as part of the 2026 Monitoring Well Project, with each well designed to be approximately 350 feet deep below ground surface and equipped with a 12-inch diameter well bore and 4-inch PVC casing. Above ground, each site will feature a permanent 3-foot by 3-foot concrete pad, a 12-inch diameter steel riser, and protective bollards to shield the wellhead, with the Area of Potential Effect for each location spanning roughly 50 feet by 50 feet. The project is slated to proceed in California and is being managed by the district’s Assistant General Manager, Michael Carbajal, who serves as the primary point of contact for inquiries. The forecast notice was posted on July 28, 2026, indicating the district’s intent to move forward with procurement and site preparation in the upcoming fiscal cycle.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
