Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Seawood Cape Preserve Campground and Public Access Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Seawood Cape Preserve Campground and Public Access Project, managed by The Wildlands Conservancy, involves the upgrade of two watercourse-wetland trail crossings within a seasonally wetted wetland swale in Humboldt County, California. The scope of work focuses on improving a historic culverted road crossing and an undeveloped crossing to achieve a net reduction of fill material and enhance overall water quality. The project is located in Trinidad at the Seawood Cape Preserve. The North Coast Regional Water Quality Control Board issued a Statewide Restoration General Order Notice of Applicability on July 23, 2026, with a final signing date of July 27, 2026. This project is categorized as exempt under California Code of Regulations, Title 14, section 15333, as it involves minor improvements covering less than five acres. The project is classified under NAICS code 237990.

General Info

Emily Afriat to upgrade two trail crossings in Seawood Cape Preserve to protect wetlands and improve access under water quality regulations.

Agency

California → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa

Place of Performance

Trinidad, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa
Contacts2 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 1 - North Coast, Santa Rosa
Office AddressN/A
Contacts
Jake ShannonSenior Environmental Scientist (Specialist)
Emily AfriatNorth Coast Regional Director

Full Description

Show more
On July 23, 2026, the North Coast Regional Water Quality Control Board (Regional Water Board) issued this Statewide Restoration General Order Notice of Applicability (NOA) to Emily Afriat, The Wildlands Conservancy. This Project includes two watercourse-wetland trail crossing upgrades in a seasonally wetted, wetland swale within the Seawood Cape Preserve. Under current conditions, the foot path crosses an unnamed wetland swale via a historic culverted road crossing at one location, and an undeveloped crossing at another. This notice is to advise that the Regional Water Board issued the above-described NOA on the date signed below.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 5 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS