Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Winchester Ranch Infrastructure Community Facilities District

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has issued Lake and Streambed Alteration Agreement EPIMS-RIV-62220-R6 to Mark Hayden for the construction of the Line A storm drain and a storm drain outlet structure as part of the SP 293 Winchester Hills development. Located in unincorporated Riverside County within the San Jacinto Watershed, the project involves a 0.5-mile channel with an outfall structure on the north bank of Salt Creek. The scope of work includes the excavation of approximately 5,508 cubic yards of soil, with 4,670 cubic yards in the permanent impact area and 838 cubic yards in the temporary impact area. Permanent impacts are estimated at 0.71 acres, while temporary construction impacts cover 0.52 acres. The project requires the placement of 2,321 cubic yards of Class V riprap, 561 cubic yards of concrete for various walls, and 318 linear feet of cable railing. Construction will utilize equipment such as excavators, backhoes, box graders, and D6 bulldozers, with no water diversion or extraction permitted. Approved on July 27, 2026, under Fish and Game Code section 1602, the project has been determined to have no significant environmental effects within the agency's jurisdiction, provided that the adopted mitigation measures and monitoring plan are followed.

General Info

Mark Hayden to build 0.5-mile storm drain along Salt Creek with permanent and temporary streambed impacts under CDFW authorization.

Agency

California → Riverside County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts
Michael TovarEnvironmental Scientist
Haide AguirreProject Planner

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed and issued Lake and Streambed Alteration Agreement (EPIMS-RIV-62220-R6), pursuant to Fish and Game Code section 1602, to the project Applicant, Mark Hayden. The Project is limited to the construction of the Line A storm drain and a storm drain outlet structure as part of the SP 293 Winchester Hills development. The channel will extend 0.5 miles with a storm drain outfall structure that will be constructed on the north bank of Salt Creek. Approximately 5,508 cubic yards (CY) of soil will be excavated; 838 CY will occur in the temporary impact area, and 4,670 CY will occur in the permanent impact area. Permanent impacts will total 0.71-acre and temporary construction impacts total 0.52-acre and consist of the 30-foot-wide buffer around the permanent impact area. Fill will only be placed in the permanent impact area and consist of 2,321 CY of Class V riprap, 561 CY of concrete for the headwall, wingwall, parapet wall, and cutoff wall, and 318 linear feet of cable railing. Construction equipment to be used during Project activities include but are not limited to: Excavator, Backhoe, Box Grader, D6 Bulldozer, and hand tools. No water will not be diverted or extracted during Project activities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS