San Roque Debris Basin Outlet Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Roque Debris Basin Outlet Repair project, managed by the Santa Barbara County Flood Control District, involves the restoration of an aging flood control facility on San Roque Creek in Santa Barbara, California. The project aims to address a damaged and non-functioning 36-inch culvert pipe and remove the existing concreted earthen filled dam and portions of the grouted rock embankment. These improvements are designed to eliminate the current total barrier to steelhead migration by implementing a stream simulation design technique to create an ungrouted, natural streambed between two grouted rock side slopes. Technical specifications include lowering the grade at the current inlet structure by approximately 5 feet at the thalweg, rising to existing grades to maintain a constant slope consistent with upstream reference reach conditions. The project is classified under NAICS code 237990 and has been granted a Notice of Exemption from further environmental review under CEQA Guideline Section 15301 for the repair and minor alteration of existing public facilities. Seth Shank serves as the primary point of contact for environmental compliance.

General Info

Remove compromised debris basin, restore natural streambed to enable steelhead migration and improve flood resilience.

Agency

California → Santa Barbara County Flood Control District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Near the terminus of Ontare Hills Road, Santa Barbara, CA, 93105

Set-Aside

NONE

Documents

(1)

NOE San Roque Debris Basin Outlet Repair

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Barbara County Flood Control District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Barbara County Flood Control District
Office AddressN/A
Contacts
Seth ShankEnvironmental Compliance Manager

Full Description

Show more
The San Roque Debris Basin, constructed in 1964 following the Coyote Fire, is an aging flood control facility and a total barrier to steelhead migration. The culvert pipe running through the existing dam embankment is damaged and not functioning from previous years of intense storms. The proposed improvements will consist of removing the existing concreted earthen filled dam, portions of the grouted rock embankment and 36-inch culvert. The replacement is opening the dam to an ungrouted, natural streambed between two grouted rock side slopes, using the stream simulation design technique. The grade at the current inlet structure will be lowered by approximately 5 ft at the thalweg rising in the basin to existing grades for a constant slope similar to reference reach conditions upstream.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, issued by the U.S. Army Corps of Engineers Honolulu District under solicitation W9128A26BA002, is a firm-fixed-price contract with an estimated value between 1 million and 5 million dollars. The scope of work involves maintenance dredging of approximately 4,260 cubic yards with offshore disposal south of Oahu, vegetation clearance, and the repair of the revetted mole through stone rework and void filling. The project is set for a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is specifically targeted toward small businesses, including HUBZone, SDB, WOSB, VOSB, and SDVOSB concerns, with a 10 percent price evaluation preference applied to HUBZone small businesses. Technical execution requires the use of a third-party qualified surveyor for multi-beam hydrographic surveys to verify dredging depths and strict adherence to stone material standards. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The contract includes liquidated damages of 2,297 dollars per calendar day of delay and requires both performance and payment bonds. Bids must be submitted as sealed envelopes to the Fort Shafter office, as electronic submissions are strictly prohibited. Offerors must comply with the Davis-Bacon Act and provide a comprehensive organization plan and safety procedures as part of their submission.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS