Electrical Vaults Removal – Harbor Development Permit No. 26-029

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Port of Long Beach is seeking a contractor for the Electrical Vaults Removal project under Harbor Development Permit No. 26-029, located at Berth D31A, Pier D, within Harbor Planning District 5 - Middle Harbor in Long Beach, California. The scope of work involves the removal of abandoned electrical vaults and surrounding guard posts, requiring approximately 573 cubic yards of excavation. Following the removal, the contractor must perform backfilling and grading to restore the surface, concluding with the in-kind replacement of the asphalt pavement and base. All removed equipment must be disposed of in accordance with federal, state, and local environmental and regulatory requirements. The project is classified as a forecast under NAICS code 237990 and has been granted categorical exemptions under CEQA Sections 15301, 15302, and 15304, as the Port of Long Beach has determined the minor alterations will have no significant environmental impact. Primary points of contact for the project include Manager Allyson Teramoto and Senior Civil Engineer Jeremy Groves.

General Info

Remove abandoned electrical vaults and guard posts, backfill, grade, and replace asphalt at Port of Long Beach.

Agency

California → Long Beach, Port of

Place of Performance

Long Beach, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Long Beach, Port of
Contacts2 people available
OfficeN/A
Organization / Agency
California → Long Beach, Port of
Office AddressN/A
Contacts
Jeremy GrovesSenior Civil Engineer

Full Description

Show more
Removal of existing abandoned vaults and surrounding guard posts, as well as backfilling, grading, and in-kind replacement of the asphalt pavement and base.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS