Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Replace Shore Power at Waterfront

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac SoutheastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Southeast
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Southeast
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
CMRCCL 09/12/2023 08:05:18 (PST) : WO# 1764459 - REPLACES NORMAL AND EMERGENCY SHORE POWER INFRASTRUCTURE: Medium voltage substations / (4) Emergency distribution transformers per Refit, switchgear, Shore power hoods and receptacles. (1) Normal distribution transformer per Refit, switchgear, to include bull rail receptacles. Include replacement and integration of all metering, protection relays, Scada monitoring and control components. Replace Facility Generator components. Replace Medium Voltage circuits to Refits 1,2, 3 and Drydock: 3K-8, 3L-8, 3A-8, 3B-8. Replace SCADA multimode fiber between 5091 WUP to 5061, 5091 to 5092, and 5091 to 5116. WO#1754638, Refit-1 Shore Power Main Breaker asset WO#1745773, Refit-3 Shore Power Main Breaker asset WO#1745777 Understandable the Mitigation cost does not capture Scada conductivity back to nearest substation, integration, metering, monitoring and controls, nor the labor/material of the installation of the medium and low voltage electrical infrastructure.