Specific - UEM - UPGRADE UTILITIES AT SITE VI AND LAYBERTHS

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac SoutheastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Southeast
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Southeast
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
CMRCDC REPLACE: Medium voltage substations / (3) Emergency distribution transformers, switchgear, Shore power hoods and receptacles (hotel service bull rail receptacles). Include replacement and integration of all metering, protection relays, Scada monitoring and control components. Replace 3K7 3L7 distribution circuits associated with the leyberth. Configure electrical substation for two additional 2500 kVA shore power transformers. Provide a normal distribution circuit from sub 3. Add required 5 fire hydrants. Repair Oil Waste Separator within B5098. Fire protection upgrades include the replacement of existing four-valve, dry hydrants with wet hydrants and addition of four to six new wet hydrants on the east side of the Layberth Pier to support berthing two boats. Add hydrant cam locks on each hydrant riser (two 5-inch and two 2.5-inch) per hydrant. New fire lane pavement markings.