REMOVE OVERHEAD POWER LINE & INSTALL UG CABLES FROM P-409 TO P-415 AND P-693 TO P-697, F-200065

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of work is to convert overhead powerlines and telephone lines to underground from P-407 to P-415 [P-407 is added] and PP-693 to PP-697. Location of new trench will be same side as the existing power poles. Work also includes replacement of switchgear with 11-ea control cabinets, complete with circuit breaker, multi-functional relay and all required accessories at F-108. Revised scope of work includes the addition of 1] extend facility area by 144-sf at battery area including walls, roof and floors, 2] Demolition of interior CMU and drywall partitions, 3] Relocate and replace 1-ea wall mounted exhaust ventilator and 1-ea shower and eyewash station including connection and accessories, 4] construct new electrical concrete trench in preparation for new electrical conduit, 5] off-island disposal cost, 6] Remove and relocate affected outlets during removal of CMU wall partition, 7] Installation of 4-ea additional lighting fixtures at Motor control center room, 8] relocate 104-ea batteries including battery racks and 1-ea battery charger, 9] replace existing 1-ea disconnect switches of batteries and 1-ea disconnect switch of battery charger, 10] remove 6-ea existing fluorescent lighting fixture including light switch and outlets on the existing battery room, 11] install new fluorescent lighting fixtures including outlets for exhaust fan at new battery room, 12] dispose affected poles; P-407 to P-415 and PP-693 to PP-697.