RFP - Whittier Elementary HVAC Electrification - Mechanical

Closed
TB2636-WMState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
International
Supply, Delivery and Maintenance of Electric Lift Trucks (Forklitfts)
Solicitation # tender_22286
The Ministry of the Solicitor General for the Government of Ontario is seeking a provider for the supply, delivery, and maintenance of three fully electric forklifts: one stand-up reach truck and one sit-down forklift for the Central East Correctional Center, and one sit-down forklift for the Central North Correctional Center. The equipment must be capable of indoor and outdoor operation, featuring a triplex mast, a minimum load capacity of 3,500 pounds, a minimum lift height of 17 feet, 42-inch forks, and both side shift and tilt capabilities. The scope of work extends beyond delivery to include warranty coverage, preventative maintenance, repair services, and technical support to minimize downtime and ensure health and safety compliance. The procurement process follows a four-stage evaluation: a mandatory requirements review, a pass/fail technical data sheet assessment, a scored technical response, and a commercial evaluation based on a relative pricing formula. Bidders must provide a nine-digit CRA business number and certify their business continuity plans, customer satisfaction survey practices, and environmental sustainability initiatives. Delivery is prioritized for the 2026-27 fiscal year, with options ranging from four weeks to a final deadline of March 29, 2027. Successful contractors must adhere to strict occupational health and safety standards, including OHSA compliance, WSIB coverage, and the provision of an accessible emergency evacuation plan.
Solicitor General

POSTED

1 day ago

DEADLINE

in 30 days
NAICS: 333924
New
Federal
Truck Tractors (6X4)
Solicitation # W91QVN27RA006
Solicitation W91QVN27RA006 is a firm fixed price, unrestricted contract for the procurement and delivery of 15 brand new 6x4 truck tractors to support the 19th Expeditionary Sustainment Command theater-wide operations. The vehicles must feature a diesel, in-line 6-cylinder engine with approximately 12.7-liter displacement and a 12-speed automated manual transmission. Delivery is scheduled for calendar year 2027, with a performance window from January 1 to December 31, 2027, and must be completed within 240 calendar days of the award or notice to proceed. The delivery is FOB Destination, door-to-door to Camp Humphreys, and requires coordination with the point of contact three working days in advance. This contract is uniquely funded by the Government of the Republic of Korea (ROK), which will pay the contractor directly; no United States appropriated funds are obligated. Invoices must be submitted in five copies and clearly cite MOA Contract - funded by ROK MND. Award will be based on the most advantageous offer, with technical qualifications and price weighted approximately equally. Technical evaluations are pass/fail based on compliance with salient characteristics, while price is reviewed for reasonableness and completeness. Offerors must submit quotations electronically via the PIEE Solicitation Module by November 12, 2026, including a plan to obtain a manufacturer's certificate specifying USFK as the first owner and required Korean contractor certifications.
0411 Aq Hq Contract Augmented

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 333924
New
Federal
3930--Combined Warehouse Forklift With 26' Lift Height
Solicitation # 36C25927Q0031
The Department of Veterans Affairs, Network Contracting Office 19, has issued a Sources Sought Notice for the procurement of a new sit-down rider lift truck and battery for the Oklahoma City VAHCS Warehouse. The primary objective is to acquire equipment capable of reaching a minimum lift height of 26 feet to accommodate higher racking systems in a new warehouse facility. The requirement specifies a Crown Forklift model FC5715-40 or an equal alternative, featuring a minimum load capacity of 4,000 lbs, 36-volt power, and a Vforce VTA battery compatible with the existing Crown Vforce V-HMF3 Series charging station. Additional technical requirements include 36-inch forks, adjustable outriggers, dual AC drives, side shift and forward back tilt capabilities, and integrated brake, backup, and front-mounted work lights. This request is for information and planning purposes and does not constitute a formal solicitation. Interested contractors must submit a capabilities statement and a detailed product description, including the manufacturer's information and estimated delivery time, to Peyton Wilkerson by 15:00 MST on November 9, 2026. Submissions are limited to 8 pages and should be sent via email. The government has identified NAICS code 333924 as the primary classification for this effort, with a small business size standard of 900 employees, though respondents may suggest alternative codes that better represent the scope of work.
Network Contract Office 19 (36C259)

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 333924
New
DIBBS
SKID, PLATFORM
Solicitation # SPE8EF-27-T-0127
Solicitation SPE8EF-27-T-0127 is a fixed-price request for quotations issued by DLA Troop Support Construction and Equipment Manu and Con for the procurement of 138 platform skids, identified by NSN 3990-01-653-4153 and part number 03159940011. The solicitation was posted on October 26, 2026, with a response deadline of November 5, 2026. This is not a small business set-aside, and all quotes must be submitted through the DLA Internet Bid Board System. The required delivery date is February 27, 2027, with a need ship date of April 12, 2027, delivered FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contractor must provide a complete data package for approved and alternate parts for evaluation. Technical and quality requirements are governed by the DLA Master List, specifically RP001 for packaging and palletization, RA001 for general technical requirements, and RQ011 for the removal of government identification from non-accepted supplies. Packaging must adhere to ASTM D3951 and MIL-STD-129 for marking and labeling. Invoicing and receiving reports must be processed electronically via the Wide Area WorkFlow system. The contract incorporates various FAR and DFARS clauses, including requirements for combating trafficking in persons, sustainable products, and safeguarding covered defense information.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

2 days ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The Salt Lake City School District (SLCSD), in partnership with McKinstry, is soliciting proposals through RFP TB2636-WM for mechanical HVAC retrofit work at Whittier Elementary School in Salt Lake City, Utah. The project centers on the electrification and modernization of the school's HVAC system, involving the installation of a central ground source heat pump (GSHP) system as part of a broader sustainability target aiming for 100% renewable energy by 2030 and carbon neutrality by 2040. The retrofit scope includes demolition and replacement of existing HVAC systems with new mechanical equipment such as air handling units, boilers, VAV boxes, associated piping, ductwork, insulation, and controls. Vendors must address all mechanical trades, including air and water-side systems, insulation, controls, test and balance (TAB), and structural components. Electrical line-voltage work and installation of the ground loop bore field are managed under separate procurements. Proposals must be submitted electronically via the Bonfire procurement system by January 7, 2026, with a thorough understanding of the required submission format and documentation, including business licenses, insurance certificates, OSHA logs, bonding capacity, project schedules, and safety plans. The evaluation process is a two-tiered best-value approach where technical qualifications carry 70 points and pricing accounts for 30 points, emphasizing both vendor expertise and cost effectiveness. Technical evaluations consider scope narrative comprehension, relevant experience, project team credentials, past performance, and management plans, with a minimum technical score required to proceed to pricing evaluation. The contract incorporates detailed performance standards referencing industry codes and standards such as the 2021 International Building Codes, 2023 National Electric Code, NEBB, SMACNA, and NFPA, ensuring adherence to safety and quality benchmarks. Required subcontractor documentation includes compliance with insurance, bonding, safety training, testing and balancing procedures, and hazardous material protocols, including asbestos management. Contract provisions address coordination with multiple contractors, subcontractor responsibilities for traffic control, site safety (including fall protection), and disposal of hazardous materials. Documentation requirements extend to detailed pricing forms, project schedules, product warranties, and operational manuals. Construction is planned for Summer 2026 with an anticipated award date in March 2026. The procurement is governed by Utah Procurement Code and SLCSD standard terms and conditions, with all official communications and modifications handled solely through Bonfire to ensure fairness and transparency.

General Info

SLCSD HVAC retrofit at Whittier Elementary, GSHP installation, sustainability focus, proposals due January 2026.

Documents

18

16-Attach M - Final Pricing Form - Mechanical for SLCSD Whittier Elementary HVAC

DOCX, High priority: read this first6 pages · pricing-form
High

2-Attach C - MC Detailed Scope of Work for Whittier Elementary School Electrification Retrofit

DOCX, High priority: read this first3 pages · sow
High

6-SLCSD Solicitation General Provisions

DOCX, High priority: read this first3 pages · general-provisions
High

7-Attach F - Insurance Requirements

PDF, High priority: read this first6 pages · insurance-requirements
High

Attachment D - Controls Commissioning Roles and Responsibilities

PDF, High priority: read this first5 pages · sow
High

Attachment L - Scoring Sheet for Whittier Elementary HVAC Electrification Mechanical

XLSX, High priority: read this first1 page · score-sheet
High

McKinstry Controls Contractor Performance Standards Feb 2025

PDF, High priority: read this first14 pages · performance-standards
High

McKinstry Sample Subcontract Agreement 2017

PDF, High priority: read this first33 pages · contract-document
High

McKinstry TAB Provider Performance Standards Revised 01/14/08

PDF, High priority: read this first3 pages · performance-standards
High

Prequalification Application Form 2.0

PDF, High priority: read this first5 pages · prequalification-application
High

Request for Proposal and Attachments Table of Contents

DOCX, High priority: read this first1 page · rfp
High

RFP 17-03 HVAC Electrification - Mechanical for Whittier Elementary School

DOCX, High priority: read this first3 pages · rfp
High

SLCSD Standard Terms and Conditions for Goods and Services

DOCX, High priority: read this first5 pages · standard-terms-and-conditions
High

Whittier Elementary HVAC Electrification Project Drawings and Specifications

PDF, High priority: read this first1 page · specifications
High

3-SLCSD Claim of Business Confidentiality Form

PDF, Low priority1 page · business-confidentiality-claim
Low

4-01 Front Cover

DOCX, Low priority1 page · other
Low

Construction Standard Scope Requirements

PDF, Low priority7 pages · other
Low

ENT Concrete Imaging Policy Rev 1 - Feb 2020

PDF, Low priority2 pages · policy
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah → Salt Lake City School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Salt Lake City School District (SLCSD), in conjunction with our design-build partner McKinstry, is issuing this Request for Proposals (RFP) seeking a vendor to provide HVAC retrofit work to be completed at Whittier Elementary School, located at 1600 S 300 E, Salt Lake City, UT 84115. The scope of work includes Mechanical retrofit work inside the building as well as the installation of the ground loop bore field outside the building. Subcontractors responding to this RFP should include all required trades, including, but not limited to: mechanical (air and water-side), insulation, controls, Test and Balance, structural, etc. Line-voltage electrical work shall be provided through a separate RFP. The drilling, earthwork, and installation of the ground loop system will also be priced through a separate RFP. You are instructed to pay special attention to the RFP language regarding the information to be submitted with your proposal and the format of that information. Evaluation of the proposals received will be in accordance with the evaluation criteria contained herein. ALL questions concerning this solicitation MUST be submitted through the Bonfire system. Only answers issued through the Bonfire system or issued via an authorized and properly issued addendum shall be the official position of the SLCSD. Any modification to this procurement effort shall be made by addendum issued by the SLCSD Purchasing Department. Only authorized and properly issued addenda shall constitute the official position of the SLCSD and shall be binding. Anyone submitting a response to this solicitation, with basis in or other communication or information received from sources other than through official addendum, assumes full risk including the possibility of a determination of non-responsiveness and may be rejected at the sole discretion of the SLCSD. Responses submitted in Bonfire are completely secure. NO ONE can see them until after the solicitation deadline. Therefore, you do not have to wait until the last minute to submit; and you may change your submission any time until the solicitation closes. If you have not completed the submission by the deadline, Bonfire will reject your submission. Please plan well.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS