Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Roofing & Waterproofing Coordination

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
Emergency Board-Up Services Request For Qualifications
Solicitation # 102126
The Santa Monica Fire Department is soliciting qualifications for contractors to provide emergency board-up services for residential and commercial structures affected by fires or other incidents. Selected contractors must be available 24/7/365 and respond to fire scenes within one hour of notification to secure properties against theft, vandalism, and re-fire. The scope of work includes boarding up openings with plywood, providing temporary fencing, building shoring, and weatherproofing in accordance with USFA/FEMA guidelines. Contractors are required to provide all labor, tools, and materials, including a minimum of two personnel per job and a fully stocked vehicle. Notably, the City of Santa Monica and the Fire Department are not liable for payment; contractors must recover all costs directly from property owners, occupants, or insurance companies and must obtain a signed release form from the responsible party before starting work. To be eligible, bidders must possess a valid Class-B California contractor's license and maintain an A+ rating with the Better Business Bureau. Submissions must be made electronically via the OpenGov portal by November 6, 2026, at 3:00 pm. The City will award the contract to the best bidder based on a variety of factors, including quality, capacity, experience, and financial resources, rather than solely on the lowest price. The agreement includes up to four annual renewal options and requires vendors to maintain comprehensive insurance and a City of Santa Monica business license. For awards exceeding 25,000 dollars, a payment bond is required.
D190 FIRE DEPARTMENT

POSTED

about 7 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

This subcontract for Roofing and Waterproofing Coordination supports prime contractors on projects for the City of Pasadena Water and Power Department. The scope of work involves performing roofing modifications and waterproofing specifically for roof-mounted solar installations, which includes installing mounting hardware and attachments while maintaining waterproofing integrity to prevent leaks. The contractor is responsible for verifying that the roof's structural integrity can support panel loads and ensuring all work adheres to manufacturer-specific warranty compliance. The primary objective is to deliver a secure solar mounting system and a fully waterproofed roof. This opportunity is categorized under NAICS code 238160 and is managed by the Water and Power Department of Power Delivery in California. Interested parties must submit their responses by the deadline of September 30, 2026.

General Info

Roofing and waterproofing subcontract for solar installations for Pasadena Water and Power Department.

Documents

This scope was carved out of 2026-RFP-0189.

The full solicitation package (33 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Design-Build Services for Solar and Energy Storage Installations at Category 1 City-Owned Properties

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Water & Power Department, Power Delivery
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs roofing modifications and waterproofing for roof-mounted solar installations for prime contractors on City of Pasadena Water and Power Department projects. Installs roof attachments and mounting hardware while ensuring waterproofing integrity to prevent leaks. Verifies roof structural integrity for panel loads. Adheres to manufacturer-specific warranty compliance. Delivers a waterproofed roof with secure solar mounting.

More opportunities from California → Water & Power Department, Power Delivery

Same awarding agency

NAICS: 541330
New
SLED
Power Delivery General Engineering Services
Solicitation # 2026-RFP-0300
The City of Pasadena is soliciting qualified professional engineering firms to provide supplemental support to the Water and Power Department (PWP) Power Delivery Division. The objective is to establish a pool of multiple qualified consultants to ensure the safe and efficient operation, modernization, and improvement of the electric power delivery system. Services are organized into six Scope of Work Groups: Receiving Station and Substation Design, SCADA, Automation, Communications, and Control Design, System Planning, Civil and Structural Engineering, Electric Vehicle Charging Infrastructure, and Renewable Energy, Energy Storage, Interconnection, and Technical Advisory Services. Work will be authorized through individual task orders based on project needs, staff availability, and specialized expertise, with a primary focus on projects such as the TMG 220 kV Gould Circuit upgrade, SCADA/OMS/DMS upgrades, and various EV charging and resilience initiatives. The resulting contracts will have an initial term of five years with three optional one-year extensions. To be eligible, firms must demonstrate at least five years of relevant experience and five completed projects within the last five years for each proposed Scope of Work Group, and staff must include engineers registered in the State of California. Proposals are evaluated based on qualifications (35%), work experience (35%), cost (20%), and preferences for local Pasadena businesses (5%) and certified small or micro-businesses (5%). All deliverables must comply with PWP design criteria and accessibility standards, including WCAG 2.1 Level AA and PROWAG. Proposers must submit their responses electronically via the City's eProcurement Portal, including a separate price proposal with fully burdened hourly rates.
Engineering Services

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 237130
New
SLED
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
Solicitation # 2026-RFP-0272
Solicitation 2026-RFP-0272 is a request for proposals from the City of Pasadena Water and Power Department to provide comprehensive wood pole inspection, treatment, repair, and UAV inspection services for its electric distribution system. The scope of work involves the maintenance and documentation of approximately 11,000 wood poles to ensure system reliability and compliance with CPUC General Orders 95 and 165. Key deliverables include georeferenced UAV reports, the identification of structural defects, and specific maintenance tasks such as the installation of trusses, guy guards, and pole tags. The contract is designed for an initial four-year term with two optional one-year extensions. Proposers must submit separate technical and price proposals via the City's eProcurement Portal by November 5, 2026. Evaluation is based on a points-based scoring system focusing on technical competence, safety practices, and experience, with specific 5-point preferences available for certified California small/micro-businesses or local Pasadena businesses. Mandatory requirements include FAA Part 107 certification for UAV operations, submission of Form AA-1 and AA-2, and a detailed quality assurance plan. Additionally, the contract prohibits the use of City data for training AI or machine learning models and requires strict adherence to ADA accessibility and prevailing wage laws.
Power and Communication Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 335311
SLED
Mobile Substation Project
Solicitation # 2026-RFP-0415
The City of Pasadena Water and Power Department is soliciting proposals under solicitation number 2026-RFP-0415 for the design and manufacture of two independent mobile substations, specifically one 4kV unit and one 17kV unit. These substations are intended to provide emergency power and support construction initiatives, with a desired in-service date of June 2029. The scope of work encompasses all necessary designs, equipment, materials, labor, insurance, and bond premiums, as well as one week of on-site startup training for both units. Qualified manufacturers must submit their responses electronically via the OpenGov eProcurement Portal by November 16, 2026, at 3:00 pm. Proposals must be divided into two separate volumes: a Technical Proposal, limited to a combined 80 pages with other supporting data and formatted in 12-point font, and a separate Price Proposal providing lump-sum pricing. Award selection is based on a weighted scoring system of total average points, with preference points available for businesses located within the City of Pasadena or those certified by the State of California as small or micro-businesses. Compliance requirements include the submission of several mandatory forms, such as Form AA-1, a Declaration of Non-Collusion, and a Taxpayer Protection Act form if City Council approval is required. The contractor must adhere to strict accessibility standards, including ADA, CBC, Title 24, and PROWAG, and provide certification that products meet a 30% minimum recycled content requirement. Invoicing is processed through the city's Accounts Payable department, with checks issued on Tuesdays and Thursdays.
Power, Distribution, and Specialty Transformer Manufacturing

POSTED

14 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS