Sewer Pipe Installation (PVC SDR-26)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Federal
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation # W912PF26RA011
This construction project at the Miotto Military Installation in Longare, Vicenza, Italy, is a Design-Bid-Build effort to remediate critical failures in the stormwater and sanitary sewer systems to achieve environmental compliance and mitigate flood risks. The scope requires comprehensive repairs, upsizing, and decoupling of cross-connected sewer lines to ensure independent discharge pathways, along with extensive site restoration driven by recent storm damage including soil erosion and landslide vulnerabilities. Key work includes installing a new underground TOC pipe to directly connect to the Bisatto River using established rights-of-way, constructing a stormwater lamination tank beneath a municipal sports field in accordance with Italian Genio Civile regulations, and replacing the field’s surface with synthetic turf over the tank. Additional features involve integrating natural stormwater management elements such as sedimentation tanks, retention ponds, and weir walls to slow and control runoff before discharge. The project includes optional scope items for asbestos pipe removal, landslide area stabilization, and sedimentation pond installation, each as separately priced line items. All work must adhere to U.S. Department of Defense Unified Facilities Criteria including UFC 1-200-01 for building standards, UFC 1-200-02 for sustainable design, and UFC 3-560-01 and UFC 3-600-01 for electrical safety and fire protection, while also complying with CSI MasterFormat and UFGS specification frameworks. Construction must follow a strict five-day work week with weekends and holidays excluded, and traffic on internal roads must remain accessible at all times with alternate one-way flows and sensor-equipped traffic lights. The contract has an estimated performance period of approximately three years, with phase one requiring all external works to commence and complete between September 2026 and September 2027 as mandated by local Italian authorities. Submission of detailed documentation is mandatory, including a visual review report, clash detection report, record model with as-built drawings, and a professionally sealed specification cover sheet. All technical data must be fully legible and consistent with manufacturer documentation, and system sensors and thermostats must be accurately reflected on as-built records. Quality assurance requires the contractor to maintain a Design Quality Control plan meeting professional engineering standards, while the government retains the right to audit submittals without relieving the contractor of responsibility for contract compliance. Final acceptance is contingent upon certification and testing as required by Italian law, with revisions to submitted data needing completion within 30 calendar days. Compliance with stringent security protocols includes restricted information disclosure,
0414 Aq Hq Contract Augmented

POSTED

about 20 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract involves the installation of 1,497 linear feet of 12-inch PVC sewer pipe with SDR-26 specification, requiring multiple advanced trenching and placement techniques including shoring, dewatering, pipe bursting, and horizontal directional drilling to accommodate various site conditions and minimize surface disruption. The work includes the use of multiple backfill materials tailored to each installation method and soil type to ensure long-term structural integrity and environmental compliance. This subcontract is issued by the City of Fort Worth under NAICS code 237110 for utility system construction and is open for bidding until August 13, 2026, with the solicitation posted on July 8, 2026. The project is located within the City of Fort Worth, Texas, and all work must be performed to meet municipal standards for sewer infrastructure, with contractors expected to manage complex logistics, safety protocols, and site-specific challenges inherent to the specified installation methods.

General Info

Install 1,497 linear feet of 12-inch PVC sewer pipe using advanced trenching and drilling methods in Fort Worth, Texas.

Agency

Texas → City Of Fort WorthView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-0256.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

PW - CPN 103498 - Water and Sanitary Sewer Replacement Contract 2021,WSM-A,Part1

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City Of Fort Worth
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → City Of Fort Worth
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 1,497 linear feet of 12-inch PVC sewer pipe (SDR-26) using various trenching methods including shoring, dewatering, pipe bursting, and horizontal directional drilling, with multiple backfill types.