Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Site Improvements – Driveway, Fencing, Stormwater Management

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract pertains to site improvements including the construction of a new driveway, fencing, and comprehensive stormwater management systems with erosion control and best management practices. Work is scoped under NAICS code 237310, indicating civil engineering construction, and is structured as a subcontract opportunity. The solicitation was posted on July 21, 2026, with a response deadline of August 19, 2026. The contracting agency is the Vermont Department of Economic Development, though no specific location details, point of contact, or set-aside provisions are provided. All performance is expected to occur within Vermont, but the exact site address is not specified. Interested parties must submit proposals through the online portal linked in the posting prior to the deadline.

General Info

Construction of driveway, fencing, and stormwater systems in Vermont under civil engineering subcontract.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of Contract No. 1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of Barre - Wastewater Treatment Facility Headworks Upgrade

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of a new driveway, fencing, and stormwater management systems including erosion control and BMPs.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 485991
New
SLED
RFP_FSD_Transportation_9.11.26
Solicitation # FSD-Transportation-9.11.26
The Vermont Agency of Human Services, Department for Children and Families (DCF), Family Services Division is seeking to establish contracts with one or more providers to deliver Standard Transportation and Supported Family Time services for children and youth in state custody. These services include 24/7 transportation to schools, appointments, and visitations, as well as the provision of safe environments for supported family time with guidance and modeling for parents. While services are required statewide and potentially out-of-state, there is a specific need for contractors in the Bennington, Brattleboro, and Springfield districts. The period of performance is scheduled from January 1, 2027, through December 31, 2031, with options for three additional one-year extensions. Awards will be made based on the best interest of the State, with preference given to resident bidders and those promoting clean energy. Evaluation criteria include the bidder's project approach, five-year experience in transportation or supported family time, geographic reach, and previous experience with DCF. Selected contractors must ensure vehicles meet Vermont inspection standards and provide documentation of services to state workers within 30 days of contact. Payment terms are Net 30 days following the submission of detailed monthly invoices. The contract includes strict compliance requirements regarding non-discrimination, conflict of interest disclosures, and worker classification reporting for bids exceeding 250,000 dollars.
Special Needs Transportation

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

2 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS