SJFD Canal Liner Repairs and Rehabilitation, Coastal Branch
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Department of Water Resources is undertaking routine maintenance repairs on the California Aqueduct and Coastal Branch within its right-of-way in Kings and Kern Counties, California. The work involves repairing or replacing cracked and buckled concrete panels, filling voids behind the aqueduct liner using high-pressure grouting injected via pump truck, and addressing erosion by installing new water stops, joint sealants, and concrete panels. All spoil material generated during the work will be removed and disposed of at an approved offsite location. Access to the work areas will be maintained along existing roadways and turnouts adjacent to the aqueduct, ensuring minimal disruption to surrounding infrastructure. The project is classified under CEQA Class 1 Exemption (15301(b)) as routine maintenance with negligible environmental impact, and all activities are confined to DWR-controlled property. The scope is strictly field-based with inspection and acceptance occurring at the project site, though no specific technical standards or formal quality control protocols are explicitly outlined beyond adherence to standard maintenance practices. The solicitation, posted on October 14, 2025, is designated as a forecast with no solicitation number or contract value provided, indicating it is a preliminary notice rather than a formal bidding opportunity. The contracting agency is the California Department of Water Resources, with the Office of Planning and Research serving as the administrative point of contact for inquiries. The primary point of contact is Todd Percival, Senior Environmental Scientist, and Sara Lowry is listed as a manager within the Environmental Regulatory Compliance Section, though her official role as COR or COTR is not confirmed. No contracting officer is identified, and no details on payment procedures, invoicing methods, accounting codes, or contract type are specified. There is no information on evaluation factors, pricing, delivery schedules, FOB terms, special requirements, offeror certifications, or submission deadlines. The absence of Clause, Section J, M, K, H, and L content suggests this notice is an environmental disclosure and project forecast rather than a fully formatted procurement document, with formal contracting actions likely to follow under an existing framework or master agreement.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
