Sly Park Recreation Area Boat Launching Facilities Upgrade Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The El Dorado Irrigation District is implementing the Sly Park Recreation Area Boat Launching Facilities Upgrade Project in Pollock Pines, California. This multi-year initiative focuses on enhancing safety and accessibility at the Doolittle and Stonebraker boat launch facilities to comply with Americans with Disabilities Act standards. Key improvements include the installation of ADA-compliant restrooms, parking stalls, and fish cleaning stations, as well as the addition of security and solar lighting, bear-resistant garbage enclosures, and updated informational signage. The project is structured into three distinct phases. Phase 1 focuses on the Doolittle facility, widening the boat ramp to provide three launch lanes through silt excavation and the installation of concrete matting and riprap. Phase 2 continues improvements at the Doolittle facility, including vault restroom replacement, parking area chip sealing, and the creation of ADA-compliant paths of travel. Phase 3 targets the Stonebraker facility, involving the widening of the upper turnaround, restroom replacement, and parking area upgrades. Construction for Phases 1 and 2 is scheduled to begin in the fall to align with low reservoir levels and reduced recreational visitation. The project utilizes a variety of heavy equipment, including excavators, barges, and cement pumps, and has been granted categorical exemptions under CEQA Classes 1 and 3.

General Info

El Dorado Irrigation District upgrading Sly Park boat launches for ADA compliance and safety.

Agency

California → El Dorado Irrigation District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Sly Park Road and Lakewood Drive, CA, 95726

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Sly Park Recreation Area Boat Launching Facilities Upgrade Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado Irrigation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado Irrigation District
Office AddressN/A
Contacts
Michael C. BaronEnvironmental Review Analyst

Full Description

Show more
The El Dorado Irrigation District (District) proposes to make improvements at two boat launch facilities (BLFs) within the Sly Park Recreation Area (SPRA) located in the community of Pollock Pines. The project involves accessibility upgrades to comply with Americans with Disabilities Act (ADA) standards including installation of ADA compliant restrooms, parking stalls, and fish cleaning stations at each BLF. The project would also increase safety for boaters and anglers by widening the boat ramp at the Doolittle BLF to provide multiple launch lanes at lower lake levels, widening the launch ramp turnaround at the Stonebraker BLF, installing lighting at both BLFs and restrooms, and installing animal-resistant garbage enclosures. The project is also intended to decrease wait times for launching, providing facilities commensurate with SPRA’s boating visitation, and updating signage to provide boating safety and aquatic invasive species information. The District proposes to complete the necessary improvements to the BLFs in three phases over a period of multiple years as follows: • Phase 1 - Doolittle BLF: Widen the boat ramp to provide a total of three launch lanes at lower lake levels • Phase 2 - Doolittle BLF: Replace the vault restroom, add an ADA-compliant vehicle-trailer parking stall, install a fish cleaning station, create an ADA-compliant path of travel, chip seal and re-stripe the parking area, add security lighting, install bear resistant garbage enclosures, and install an information kiosk and project signage • Phase 3 - Stonebraker BLF: Widen the boat ramp upper turnaround, replace the vault restroom, add chip seal and re-stripe the parking area, replace the fish cleaning station, install solar lighting, install bear resistant garbage enclosures, and install an information kiosk and project signage The following equipment would be necessary to complete the project: • Excavator • Dump Truck • Barge • Work Truck • Front Loader • Crane • Flat Bed Truck • Sweeper • Generator • Cement Truck • Suction Pump • Cement Mixer • Cement Pump • Miscellaneous Hand Tools Phase 1 activities to widen the boat ramp at the Doolittle BLF will involve work below the ordinary high-water mark of Jenkinson Lake and may also involve in-water work depending on the lake elevation at the time of construction. Activities would include excavation of silt and debris from the area where the new boat launch lanes will be constructed. Once excavation is complete crews would install concrete matting to form the boat launch lanes and add riprap along the end to stabilize the structure. A new concrete anchor would be installed to guide the floating dock as water levels fluctuate. Work would be performed from a floating barge and/or long reach excavator from the shoreline. A silt curtain will be installed around the work area in the reservoir to help contain turbidity generated during construction activities. Phase 1 project activities would be scheduled to begin in the fall when the reservoir is at its lowest elevation and when recreational use at the SPRA is typically low. Phase 2 and 3 activities would involve adding ADA-compliant amenities (i.e., vehicle-trailer parking, vault restrooms), installing a fish cleaning station, applying chip seal and striping to parking areas with ADA-compliant paths of travel, adding security lighting, installing bear resistant garbage enclosures, and installing an information kiosk and project signage. Activities would include demolition of old components, installation of new infrastructure, and finishing work (e.g., paving and striping), Phase 2 project activities would be scheduled to begin in the fall when recreational use at the SPRA is typically low.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 23 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS