Smith Field Park Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Smith Field Park Improvements Project, managed by the City of Half Moon Bay Public Works Department, involves expanding the park footprint from 13.2 to approximately 16 acres at 201 Wavecrest Road. The scope of work includes improving five existing ballfields and constructing a paved parking lot, children's play area, off-leash dog park with associated amenities, picnic areas, and a walking path. Infrastructure upgrades feature the installation of a new 2,150-foot 8-inch water main, sanitary sewer lines for the restroom and snack shack, and a comprehensive stormwater drainage system with bioretention basins designed for a 10-year, 2-hour storm. Additionally, the project includes the replacement of six light standards with nine shielded, low-intensity fixtures and the creation of a consolidated storage area for the City Maintenance Division and HMB Little League. The project has received environmental clearance through a Mitigated Negative Declaration under CEQA, with the City Planning Commission granting approval on September 23, 2025. Construction is scheduled to begin on April 1, 2026, with an overall duration of approximately 12 months spanning from January 1 to December 31, 2027. Key Phase 1 milestones include demolition in April 2026, followed by fine grading, building construction, and paving between August and September 2026. All work must comply with the State Water Board Construction General Permit and the City's Green Infrastructure Plan to manage sediment-laden runoff.

General Info

Half Moon Bay expands Smith Field Park to 16 acres with ballfields, play area, dog park, parking, and landscaping, beginning April 2026.

Agency

California → City of Half Moon Bay

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Wavecrest Road and Highway 1, Half Moon Bay, CA, 94019

Set-Aside

NONE

Documents

(2)

Smith Field Park Improvements Project Notice of Determination

PDFnotice-of-determination

Smith Field Park Improvements Project Final Initial Study/Mitigated Negative Declaration

PDFinitial-study-mnd

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Half Moon Bay
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Half Moon Bay
Office AddressN/A
Contacts
Maz BozorginiaPublic Works Director

Full Description

Show more
The complete development of Smith Field Park Improvements would expand the park footprint from 13.2 to approximately 16 acres, improve the existing five ballfields, construct a paved parking lot, children's play area, off-leash dog park, picnic areas, walking path, and install landscaping, drainage, lighting, and utility improvements throughout the site. The approved Coastal Development Permit and Architectural and Site Design Review are for Phase 1 of the Park Improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, with disposal at an approved offshore site south of Oahu. Additionally, the contractor will perform revetted mole repairs involving clearing and grubbing, vegetation and root removal, stone rework, and filling voids with additional stone. The estimated value of the work ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Bidders must provide a bid guarantee and are required to furnish performance and payment bonds upon award. Key deliverables include pre- and post-dredge multi-beam surveys conducted by a third-party qualified surveyor and the submission of an operations plan within 30 days of the Notice to Proceed. The contract mandates strict adherence to USACE accuracy standards and quality control measures, including a punch-out inspection and final acceptance inspection. Liquidated damages for delays are set at 2,297 dollars per calendar day. Bids must be submitted in sealed envelopes to the Fort Shafter office, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237990
New
SLED
Reclamation District No. 1600 DMP Drainage Pipe Replacement ProjectReclamation District 1600 is undertaking the Deferred Maintenance Program Drainage Pipe Replacement Project in Yolo County, California. The project consists of the in-kind replacement of a single 48-inch gravity drainage pipe located southeast of Knights Landing along the Tule Canal at Levee Mile 0.36. The primary objective is to maintain the existing pipe size, function, and alignment to ensure the continued conveyance of water from agricultural lands east of Woodland to the Tule Canal within the Yolo Bypass. Construction is scheduled to begin on August 3, 2026, with a phased timeline including mobilization, site preparation, excavation and demolition, pipe installation, levee restoration, and final demobilization. The project has undergone a comprehensive environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. This assessment determined that there are no significant unmitigable environmental impacts, provided that specific avoidance and minimization measures are implemented. Key requirements for the contractor include mandatory worker environmental awareness training, the installation of temporary exclusion fencing to protect aquatic habitats, the execution of a Spill Prevention, Containment, and Countermeasure Plan, and adherence to strict in-water work windows. Additionally, the contractor must utilize vibratory pile drivers for cofferdams and maintain daily inspections of silt curtains to control turbidity in compliance with Basin Plan standards and Cal-OSHA safety requirements.
Reclamation District 1600

POSTED

about 16 hours ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS