Smith Field Park Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Half Moon Bay is advancing Phase 1 of the Smith Field Park Improvements Project, which will expand the park from 13.2 to approximately 16 acres through a comprehensive set of community-focused enhancements. This project includes the renovation of five existing ballfields, the construction of a paved parking lot, a children’s play area, an off-leash dog park, multiple picnic areas, a walking path, and full-site landscaping with integrated drainage, lighting, and utility upgrades. All work is subject to the approved Coastal Development Permit and Architectural and Site Design Review, ensuring alignment with local environmental and aesthetic standards. The project is sited at 400 Wavecrest Road in Half Moon Bay, California, with construction scheduled in distinct phases beginning with demolition in April 2026 and concluding with architectural coating by the end of September 2026. Performance activities are tightly coordinated across grading, paving, building construction, and site installation, all occurring on-site with inspections and acceptance conducted at the completed project location. The City’s Public Works Director serves as the primary point of contact for the initiative. While the project is publicly scoped and regulated under local environmental mandates, including compliance with the Municipal Regional Stormwater Permit, California Environmental Quality Act (CEQA), and relevant state water and energy codes, no formal federal contract clauses, procurement evaluation factors, or federal acquisition regulation (FAR) provisions are applicable or identified. There is no contract value specified, no federal funding or appropriation data referenced, and no indication of federal procurement mechanisms such as WAWF invoicing, COR oversight, or small business set-asides. The submission materials lack standard federal contract components including representations and certifications, packaging and marking requirements, payment details, accounting codes, or solicitation instructions for offerors. The project appears to be a municipal capital improvement funded locally, governed by state and regional environmental compliance, and executed under the City’s direct administrative authority without federal contracting structure or oversight.

General Info

Half Moon Bay expands Smith Field Park to 16 acres with ballfields, play area, dog park, parking, and landscaping, beginning April 2026.

Agency

California → City of Half Moon Bay

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Wavecrest Road and Highway 1, Half Moon Bay, CA, 94019

Set-Aside

NONE

Documents

(2)

Smith Field Park Improvements Project Notice of Determination

PDFnotice-of-determination

Smith Field Park Improvements Project Final Initial Study/Mitigated Negative Declaration

PDFinitial-study-mnd

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Half Moon Bay
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Half Moon Bay
Office AddressN/A
Contacts
Maz BozorginiaPublic Works Director

Full Description

Show more
The complete development of Smith Field Park Improvements would expand the park footprint from 13.2 to approximately 16 acres, improve the existing five ballfields, construct a paved parking lot, children's play area, off-leash dog park, picnic areas, walking path, and install landscaping, drainage, lighting, and utility improvements throughout the site. The approved Coastal Development Permit and Architectural and Site Design Review are for Phase 1 of the Park Improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.