Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Clover Flat Resource Recovery Park Creek 2 Restoration, (Lake or Streambed Alteration Agreement No. EPIMS-NAP-52697-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized ecological restoration activities at Clover Flat Resource Recovery Park in Calistoga, California, under Lake and Streambed Alteration Agreement EPIMS-NAP-52697-R3, to compensate for prior unauthorized impacts to Creek 2 and adjacent riparian habitats. The project encompasses approximately 936 linear feet of stream restoration and 4.24 acres of habitat rehabilitation, including the reestablishment of 2.96 acres of oak woodland riparian habitat, 0.90 acres of upland oak woodland, and 0.38 acres of naturalistic stream channel. Work involves reconstructing the historical alignment of Creek 2 using graded terrain, boulder step pools, cascades, and roughened channel segments to restore natural hydrology and ecological function. A previously installed culvert near drainage ditch DD-01 will be decommissioned during 2026 construction, with the DD-02 culvert removed afterward in coordination with landfill grading and access road removal. The restored creek will flow south through the project site and connect to lower Creek 2, which continues eastward to its confluence with Creek 1, while a new small tributary joins the realigned channel near its downstream end. Vegetation recovery will follow the removal of invasive species and soil placement, followed by seeding and planting of native flora appropriate to the region, with all work confined to previously disturbed areas and existing roadways. The restoration is designed as compensatory mitigation under Section 1602 of the Fish and Game Code, directly offsetting documented damage from past landfill leachate contamination, stream filling, and hydrologic disruption as identified in CDFW’s 2019 Resources Impact Assessment and 2020 Natural Resources Damage Assessment. The project qualifies for a categorical exemption under California Code of Regulations Title 14, Section 15333, due to its limited scale and restorative nature. All activities will occur on-site at 4380 Clover Flat Road, Calistoga, with construction scheduled for 2026 and final inspections conducted by CDFW staff to ensure compliance with approved geomorphic design, habitat targets, and removal of infrastructure. Mark Gingrich of Clover Flat Resource Recovery Park serves as the permittee representative, while Nicholas Magnuson of CDFW acts as the primary environmental liaison. No financial value, procurement terms, or federal acquisition regulations apply, as this is a regulatory permit for habitat mitigation rather than

General Info

Restore 936 feet of creek and 4.24 acres of riparian habitat in Calistoga as compensatory mitigation for past impacts.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Calistoga, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption EPIMS-NAP-52697-R3 Clover Flat Creek 2 Restoration

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Nicholas MagnusonEnvironmental Scientist
Mark GingrichDivision Vice President

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-NAP-52697-R3, pursuant to Section 1602 of the Fish and Game Code to Clover Flat Resource Recovery Park (Permittee) as represented by Mark Gingrich The Project is limited to the restoration of an unnamed stream complex (Creek 2) totaling approximately 936 linear feet and 4.24 acres of restoration including re-establishing 2.96 acres of oak (Quercus sp.) woodland riparian habitat, 0.90 acres of oak woodland habitat, and 0.38 acres of naturalistic stream channel. This includes restoring previously burned mixed shrubland and oak woodland, and the decommissioning and removal of an access road detention basin, and one culvert. The culvert near DD-01 will be decommissioned. The Project partially offsets unauthorized impacts to stream and riparian habitat that resulted in stream filling, impairment of stream hydrologic and biological processes, and landfill leachate contamination into stream habitat of Creeks 2 and 1 based on CDFW’s Resources Impact Assessment, dated December 2019 and Natural Resources Damage Assessment, dated May 2020, and information provided by Permittee’s consultants. Stream restoration will include the creation of a new realigned section of Creek 2 and a small tributary stream to the realigned section of Creek 2, which will also allow restored functions of upstream drainages. Creek 2 will then flow south through the approximate midline of the Project area before flowing into Creek 1. The Project involves implementing a grading plan to recreate the original canyon, hillslopes, and stream corridor along the approximate alignment of the historical, pre-disturbance Creek 2. The channel and tributary morphologies to be built are designed to reflect the Project watershed setting and includes a series of boulder step pools, boulder cascades, and roughened channel reaches. Currently, the inlet of the proposed Creek 2 channel is located at the confluence of two small drainages, where it flows through the Project site before daylighting at the southeast end of the restoration area into lower Creek 2 and then Creek 1. Grading will create a relatively flat 5 percent sloped reach in the middle of the Project site before steepening to the downstream end. The downstream end of Creek 2 connects to lower Creek 2, which continues eastward to its confluence into Creek 1. The newly realigned small tributary stream joins Creek 2 approximately 30 feet from the downstream end of the Project site. The new Creek 2 channel below the small tributary stream confluence will merge into the existing Creek 2 channel with a gradient of 50 percent. The culvert near drainage ditch (DD)-01 will be decommissioned as part of Creek 2 Restoration construction in 2026. The culvert near DD02 will be removed by CFRRP staff after Creek 2 Restoration is complete and in conjunction with landfill grading activities and removal of the access road leading up to the Creek 2 Restoration project in 2026. Revegetation at the site will be accomplished through initial removal of invasive non-native species biomass and placement of soils, then seeding and planting of native species appropriate to the area. Access to the Project site for restoration activities will be from existing disturbed areas and roadways. This on-site restoration provided by the Project will be credited towards the total restoration requirement for the unauthorized impacts described above.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 5 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
AL ROLLINS PARK IMPROVEMENTS RFP
Solicitation # PE-75552-NONST-2026-000000067
The City of Dalton is soliciting proposals for the construction of improvements to Al Rollins Park located at 521 Threadmill Road, including grading of existing baseball fields for artificial turf installation, concrete curbing, storm drainage systems, renovations to the press box and restroom building, soil and erosion control measures, new fencing, and construction of a new PE batting building. The contractor must provide all materials and labor necessary to complete the project in accordance with the Contract Documents and coordinate closely with the City on the scheduling and phasing of work. While the contractor is responsible for site preparation and infrastructure, the artificial turf system—including the turf, infill, stone base, nailers, and field drainage—will be supplied and installed under a separate contract by another party. All interested bidders are required to attend a mandatory Pre-Proposal Meeting on August 25, 2026, at 10:00 A.M. at the project site, with late arrivals not permitted. Proposals must be submitted in sealed envelopes to the City Finance Department at 300 W. Waugh Street by 10:00 A.M. on September 8, 2026. The City reserves the right to request additional information or conduct interviews with proposers and may shortlist firms prior to award. Short-listed contractors will be notified by the close of business on September 9, 2026, and interviews or presentations will take place on September 14 and 15, 2026. Evaluation will consider qualifications, experience, compliance with requirements, and proposed approach to the work. The solicitation number is PE-75552-NONST-2026-000000067, and all information and documentation related to the bid can be accessed via the provided online link. The point of contact for inquiries is Kenneth Harless, reachable at 706-529-5895 or KHARLESS@KRHARCHITECTS.COM.
City of Dalton

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
MRL Carrollton Phase III Storage
Solicitation # W912P8-26-B-A080
The U.S. Army Corps of Engineers New Orleans District is preparing to issue an Invitation for Bids under solicitation number W912P8-26-B-A080 for the construction of a new pre-engineered metal storage building at the Carrollton Phase III facility in New Orleans, Louisiana. This procurement is designated as a Total Small Business Set-Aside under NAICS code 237990 with an estimated value between one and five million dollars. The work encompasses demolition, site clearance, excavation, backfill, utility relocations, construction of a reinforced concrete foundation and pavement, installation of the metal building, chain-link fencing with a gate, and all related incidental tasks necessary to complete a fully functional facility. The contract will be awarded on a Firm-Fixed-Price basis using commercial procedures, and all bids must be submitted in response to the formal solicitation expected to be posted on the System for Award Management website. Interested contractors must maintain an active SAM registration to be eligible for award, as paper copies of the solicitation will not be distributed and all documents, including amendments, will be available exclusively online through SAM. The solicitation is anticipated to be posted on or about the published date, with proposals due by September 21, 2026. Offerors are required to monitor the SAM website regularly for updates and changes. The primary point of contact for questions is Francesca DeBoer of the New Orleans District, with Christopher Nuccio listed as a secondary contact. No technical or contractual inquiries will be accepted or answered prior to the official issuance of the solicitation, and all information contained in this synopsis is subject to change.
W07V Endist New Orleans

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VA
Solicitation # N4008526B0008
This solicitation, designated N4008526B0008, seeks qualified contractors for a Design-Bid-Build dredging project at Joint Expeditionary Base Little Creek–Fort Story in Virginia Beach, Virginia, encompassing the Fuel Pier, Anzio Beach Sandbar, and Utah Beach Sandbar. The work includes dredging sediment using a standard clamshell bucket, transporting material via scow or barge, and depositing it in a near-shore area, as well as constructing Berm Areas #8, #9, and #10 through hydraulic unloading, dewatering, grading, debris and vegetation removal, offsite disposal, and vegetation planting for stabilization. The project is estimated to range between $10 million and $25 million in value and requires contractors to demonstrate experience completing dredging projects with a production rate of at least 2,500 cubic yards per day and handling approximately 200,000 cubic yards of sediment using conventional equipment. Offerors must submit detailed project data for three to five completed, similar projects within the last five years, with all experience limited to their own direct performance; subcontractor experience is not accepted except under specific exceptions. The procurement follows FAR Part 14 sealed bidding procedures and is unrestricted for full and open competition, though if subsequently set aside for small businesses, the contract will include the limitation on subcontracting clause requiring the small business to perform at least 15 percent of the contract cost using its own employees. All respondents must be registered in SAM, provide their UEI and CAGE code, confirm small business status if applicable, and submit bonding capacity information including surety name and maximum per-project and aggregate bonding limits. Proposals must be submitted electronically as a single PDF under 4MB to Angela Clifton at the designated Navy email address by the deadline of September 1, 2026 at 6:00 p.m. Eastern Time, with only registered contractors receiving notifications of amendments.
Navfacsyscom Mid-Atlantic

POSTED

about 9 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237990
New
SLED
Fay Creek Culvert Debris RemovalIn early 2023, a severe storm caused the failure of a 15-foot-diameter culvert beneath Salmon Creek Road, leading to the collapse of the roadway and the deposition of debris—including the damaged culvert, concrete, asphalt, and woody material—into Fay Creek. This obstruction disrupted surface-water flow and blocked critical fish passage. Sonoma County responded by installing a temporary one-lane Bailey bridge to maintain road access, but the debris remains in the creek, impairing aquatic connectivity. To address this, Sonoma County plans to remove approximately 50 feet of the failed culvert and all associated debris from a 50- by 100-foot section of the creek, potentially including an unstable concrete abutment from a prior bridge structure. The removal effort will occur during the dry season using hand tools and heavy equipment staged on Salmon Creek Road, with a temporary access route constructed adjacent to the Bailey bridge to allow an excavator to reach the work zone without entering the wetted channel. No trees will be removed, and minimal vegetation will be cleared only as absolutely necessary for safe operations. The California Department of Fish and Wildlife will coordinate dewatering and fish relocation to protect aquatic life. After debris removal, the site will be graded to match surrounding topography and stabilized with native seed, biodegradable erosion-control fabric, and fiber rolls. All removed materials will be hauled off-site for recycling or proper disposal, and strict erosion and spill prevention controls will be enforced throughout the work to ensure environmental protection and full restoration of natural stream function and aquatic passage.
Sonoma County

POSTED

about 14 hours ago

DEADLINE

N/A
View Details