Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Homeland Security was posted on December 11, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SOURCES SOUGHT; CGC BERTHOLF; SHOWER STALL RENEWAL

Closed
HSCG85-13-Q-P45700Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
Federal
Voyage Repair (VR)
Solicitation # N6817127QN006
Solicitation N6817127QN006 is a Request for Quote issued by the Navsup Flc Sigonella Naples Office for firm fixed price non-commercial voyage repair services for the USS RAFAEL PERALTA (DDG 115). The work is to be performed in Mombasa, Kenya, with a period of performance from 12 November 2026 to 18 November 2026. The scope of work includes hull maintenance such as high-pressure fresh water washing, rust and corrosion removal, replacement of lagging and insulation, cleaning and inspection of air conditioning and refrigeration plant condensers, furniture upholstery replacement, and the provision of rigging and scaffolding services. All work must adhere to NAVSEA Standard Items and specification package NAPL-009-27. Award will be made to the lowest priced technically acceptable offeror, with technical capability evaluated on an acceptable or unacceptable basis. Offerors must submit a completed J-1 price breakdown in US dollars, a draft Test and Inspection Plan, and a signed Use and Non-Disclosure Agreement to access restricted technical data. Quality assurance requirements include providing a quality management system supporting documents and certifications for welding and coatings. Contract administration requires electronic invoicing via Wide Area WorkFlow, and the contractor must comply with specific overseas insurance requirements, including the Defense Base Act and war-hazard insurance.
Navsup Flc Sigonella Naples Office

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 336611
New
Federal
Misty Barge Dry Dock Services
Solicitation # 1240BF27Q0002
Solicitation 1240BF27Q0002 is a total small business set-aside issued by the USDA-FS CSA Northwest 4 for dry dock services for the Misty Barge, currently located at Shelter Cove on Revillagigedo Island, Alaska. The scope of work includes hauling out the vessel, performing exterior hull sandblasting and painting, repairing the exterior deck and appurtenances, painting the interior hull, and cleaning bilge tanks. All painting must adhere to Preparation and Painting Specification 00300 and manufacturer recommendations, specifically utilizing PPG products. The period of performance extends from the date of award through April 1, 2027, with specific deliverables including a work schedule, coating products list, and interior bilge painting plan due shortly after the start date. Offers are due by November 6, 2026, following an extension granted by Amendment 0001. Proposals must be submitted via email as three separate attachments covering technical capability, past performance, and price. Award will be based on the most advantageous quote, with price serving as the primary evaluation factor. Technical evaluations will focus on the provided draft work schedule and proposed haul-out dates, while past performance will be assessed based on recency and relevancy within the last three years. The contractor is responsible for implementing a Quality Control Plan managed by a designated Quality Control Representative, while the government will maintain Quality Assurance through performance requirements measures.
Csa Northwest 4 Usda-Fs

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 336611
New
Federal
USCGC DOLPHIN FUEL TANK CLEANING
Solicitation # 52000QR270000488
The U.S. Coast Guard Surface Force Logistics Center is soliciting quotations for the cleaning and inspection of two diesel fuel service tanks (3-9-1-F and 3-9-2-F), each with a 1,450-gallon capacity, aboard the USCGC Dolphin (WPB-87354) in Mobile, Alabama. This total small business set-aside is being processed as a firm-fixed price contract using simplified acquisition procedures under FAR Part 13 and FAR Subpart 12.6. The scope of work includes the removal and legal disposal of 1,400 gallons of contaminated diesel fuel, comprehensive interior cleaning of tank surfaces, atmospheric testing by a competent person, and detailed visual inspections of structural conditions and coating systems. The contractor is also responsible for maintaining a plug log, providing a chain of custody for waste, and implementing a Quality Control Program to ensure compliance with SFLC Standard Specifications 0000 and 0740. The period of performance is not to exceed five days, with a requested work window between November 15, 2026, and December 15, 2026. Key deliverables include the successful execution of initial and post-service operational tests on tank level indicators and vent check valves, witnessed by the Engineer Petty Officer. The government will provide new gaskets and stainless steel hardware for tank closure. Interested vendors must be registered in SAM.gov and submit a detailed cost breakdown, including unit and total pricing, by November 9, 2026, at 0900 A.M. EST. Award will be based on the best value to the government, considering price, specifications, quality, and past performance.
CG-SEA-C21

POSTED

1 day ago

DEADLINE

in 10 days
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

1 day ago

DEADLINE

in 24 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

CGC BERTHOLF, ALAMEDA, CA, 94501, USA

Set-Aside

SBA

Documents

1

750 Shower Stall Renewal - Rev-01

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 3(00040)
Contacts2 people available
OfficeBALTIMORE, MD, 21226, USA
Office AddressBALTIMORE, MD, 21226, USA
Contacts
Jermond M. WilliamsonStorekeeper First Class
Chad B. DavisStorekeeper

Full Description

Show more
WORK ITEM 1: Shower Stall Renewal 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to preserve and restore the berthing shower stall(s) and shower pan(s) in various locations. 1.2 Government-furnished property. None. 2. REFERENCES COAST GUARD DRAWINGS Coast Guard Drawing 750-WMSL 621-1, Rev -, Joiner Bulkheads Typical Details (ASC621001) Coast Guard Drawing 750-WMSL 621-4, Rev -, Joiner Bulkhead Arrangement 2nd Dk Fp to FR 36 (ASC621004) Coast Guard Drawing 750-WMSL 621-5, Rev A, Joiner Bulkhead Arr 2nd Deck FR 36-64 (ASC621005) Coast Guard Drawing 750-WMSL 621-6, Rev B, Joiner Bulkhead Arr 2nd Deck FR 64 Aft (ASC621006) Coast Guard Drawing 750-WMSL 621-7, Rev B, Joiner Bulkhead Arr Mn Dk Fp to FR 36 (ASC621007) Coast Guard Drawing 750-WMSL 621-8, Rev A, Joiner Bulkhead Arr Mn Dk FR 36-64 (ASC621008) Coast Guard Drawing 750-WMSL 621-9, Rev B, Joiner Bulkhead Arr Mn Dk FR 64 Aft (ASC621009) Coast Guard Drawing 750-WMSL 621-10, Rev A, Joiner Bulkhead Arr 01 Lvl FR 28-67 (ASC621010) Coast Guard Drawing 750-WMSL 635-1, Rev -, Thermal & Acoustic Insulation (ASC635001) Coast Guard Drawing 750-WMSL 801-1, Rev -, Booklet of General Plans (ASC801001) COAST GUARD PUBLICATIONS Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6341, Jan 2009, Install New Deck Covering Systems OTHER REFERENCES Federal Specification (Fed Spec) HH-P-151, Mar 1991, Rubber-Sheet, Cloth Insert MIL-A-46106, Jun 1992, Adhesive-Sealants, Silicone, Rtv, One-Component MIL-PRF-3135, Nov 1986, Deck Covering Underlay Materials NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Tech Rep. Not applicable. 3.1.3 Protective measures. The Contractor shall take protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3, as applicable, in addition to all other requirements that may be specified in individual work items, to prevent contamination and surface damage of non-affected shipboard equipment, components, and spaces. 3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed: - Shower heads. - Plumbing. - Insulation. 3.1.5 Ultrasonic thickness measurement. 3.1.5.1 Where specified in Table 3.3.A below, the Contractor shall perform 30 thickness measurements of surfaces, in locations designated by the Coast Guard Inspector. Ensure that the ultrasonic apparatus, procedure requirements, and report shall be in accordance with SFLC Std Spec 0740, and that the report results shall additionally include the following information for each test point: - Location. - Original metal thickness. - Measured metal thickness. - Percent deterioration (calculation is based on the original metal thickness). 3.1.5.2 Perform ultrasonic equipment standardization in accordance with SFLC Std Spec 0740. 3.2 Work Location(s). The concerned work area(s) are Compartments 3-72-2-L, 2-70-3-L and 2-75-0-L. See the Coast Guard Drawings above and the photos below, for guidance and details. 3.3 Shower head removal. 3.3.1 The existing shower head and valves are suspended in the shower stalls from the hot and cold potable water piping which enters through the overhead of the shower stall. There is silicone sealant around the penetration to prevent water leakage into the overhead above the shower stall. 3.3.2 Disconnect, remove and scrap the existing shower head and water control valve assemblies. The water control valve assembly is connected to the cutter's hot and cold potable water piping using union end fittings. Cap the pipe ends to prevent contamination from entering the potable water system. 3.3.3 Unsweat the union fittings on the ends of the hot and cold potable water supply lines to the shower head. After renewal of the shower stalls, reinstall the union fittings. 3.3.4 After renewing the shower stalls, install new Contractor Furnished shower heads and control valve assemblies. Flush the assemblies upon reinstallation to remove any contamination. 3.3.5 Apply new sealant to the overhead of the shower stall where the potable water piping penetrates. 3.3.6 Demonstrate proper operation of the showers to the Coast Guard Inspector. Demonstrate that the flow from the shower head is unobstructed and that there are no leaks in the piping. 3.4 Shower stall removal. 3.4.1 Renew metal in shower stalls. Retain the shower drain (s) and ensure all deck openings are plugged as to prevent contamination of the drain system. Ensure deck drain(s) is/are not damaged in the process. Picture of shower head and mixing valve can be seen in Figure 01. 3.4.2 Remove and scrap all existing deck covering systems from the shower stall(s) taking care not to disturb surrounding layers or materials. Disposal shall be in accordance with all local, state, and federal laws and regulations. 3.4.3 Power tool clean to bare metal all steel decks in the work areas in accordance with SSPC-SP 11. Surfaces shall be completely free of corrosion products, mill scale, dirt, oil, grease, moisture, deteriorated paint, and other surface contaminants. 3.4.4 In the presence of the Coast Guard Inspector, conduct a visual inspection of all clean decks, bulkheads and overhead in the work areas. 3.4.5 Inspect all expose decks, bulkheads, piping and drains for corrosion and deterioration. Submit a Condition Found Report to the Coast Guard Inspector reporting the results of the inspection. 3.4.6 Prior to installing new underlay in the shower stall area specified in 3.4.7, prime and paint the deck. The correct primer and paint is specified in the Product Data Sheet of the underlayment. Follow guidance given in COMDTINST M10630.3. 3.4.7 Install polymeric deck covering system in the work areas in accordance with SFLC Std Spec 6341. Polymeric system shall conform to MIL-PRF-24613, Type I Class 2, Epoxy. Slope the underlayment to the deck drain. 3.5 Shower drain removal. 3.5.1 Remove shower drain and retain drain for reinstallation. 3.5.2 In the presence of the Coast Guard Inspector, visually inspect the drain, piping and trap for corrosion and deterioration. 3.5.3 Submit a Condition Found Report to the Coast Guard Inspector if any of the drain components need renewal. 3.5 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures). 3.7 Shower stall installation. 3.7.1 The Contractor shall provide and install new shower stall partitions, sheathing, towel bars and soap dishes which look the same as the ones currently installed. Use all new fasteners. Caulk all seams requiring caulking with a moisture cure polyurethane based caulking, 3M 5200, Sikaflex or equal. 3.7.2 New plating shall be of similar material and mechanical properties as the adjacent material. 3.7.3 Submit a Condition Found Report to the Coast Guard Inspector if additional repairs or additional plating removal are required. 3.7.4 Ensure that any welding does not warp or cause any distortion to adjacent plating. 3.8 NDI. The Contractor shall perform NDI of the plate renewal in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR. 4. NOTES 4.1 Contract Info: Performance Period: 02Jan-25Jan13 Work Hours: Mon-Sat, 0700-1700 Hot Work: Mon-Fri, 0700-1500 4.1.2 Contractors must arrive on week day (Mon-Fri) when starting the contract. This is to ensure all the required Coast Guard personnel are available for the arrival conference (1st meeting of the contract.)

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 3(00040)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS