Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

South Tank Pipe Relining Project

Active
2026-NIBCONST-592State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Prescott is soliciting bids for the South Tank Pipe Relining Project, identified as solicitation 2026-NIBCONST-592. This project represents the second phase of a rehabilitation effort for a 5-million-gallon concrete reservoir constructed in the early 1990s. While the first phase addressed the interior shell and columns with epoxy coating, this phase focuses on resolving persistent leakage by performing trenchless rehabilitation and lining of the piping beneath the reservoir. The scope of work includes the exposure and cast-in-place pipe lining of two 24-inch inlet and outlet pipes located within a concrete vault, as well as the exposure and lining of two 8-inch drainpipes located in an earthen area. The contract is managed by the Public Works agency and requires a completion timeframe of 120 calendar days, with a strict requirement that the reservoir be returned to service by March 1, 2027. Bids must be submitted by October 1, 2026. The project is subject to the City of Prescott Supplement to MAG Uniform Standard Specifications and must comply with federal domestic procurement mandates, including the Buy America preference and American Iron and Steel requirements for federally funded water infrastructure. The agreement establishes the contractor as an independent entity and mandates that work commence within 10 days of notification.

General Info

City of Prescott seeks bids for South Tank pipe relining by October 1, 2026.

Agency

Arizona → Public WorksView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

(9)

City of Prescott Supplement to MAG Uniform Standard Specifications - Technical Specifications Feb 14 2019

PDF132 pagesspecifications

City of Prescott South Tank Pipe Rehabilitation - Final Plans

PDFspecifications

CIP 2026-002 South Tank Pipe Rehabilitation – Special Provisions

PDFspecifications

OMB Memorandum M-22-11 on Buy America Preference Implementation Guidance

PDF17 pagesguidance-memorandum

City of Prescott South Tank Pipe Rehabilitation Final Technical Specifications

PDFspecifications

American Iron and Steel Requirement Guidance - EPA March 20, 2014

PDF8 pagesguidance

City of Prescott Construction Contract

PDF15 pagescontract-document

South_Tank_Bid_Schedule_For_OpenGov.xlsx

XLSX

South Tank Pipe Relining Project - Notice Inviting Bids

PDFitb

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → Public Works
Contacts2 people available
OfficePrescott, AZ, 86301, USA
Organization / Agency
Arizona → Public Works
View Agency Profile
Office AddressPrescott, AZ, 86301, USA
Contacts
Nathan GrahamWater Operations Superintendent
Jaimie SventekContracts Coordinator

Interested Companies (5)

Show more
Ferguson Enterprises
PRESCOTT VALLEY, AZ
Beta Public Relations
Flagstaff, AZ
Fann Environmental
Prescott, AZ

See All 5 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The City of Prescott is requesting bids for the trenchless rehabilitation and lining of piping located beneath the existing 5-million-gallon South Tank Reservoir. The reservoir was constructed of cast-in-place concrete in the early 1990s. Leakage from the reservoir prompted the City to undertake a two-phase rehabilitation process. The first phase consisted of preparing, abrasive blasting, and coating the interior shell of the reservoir, including all columns and capitals, with a 100% solids epoxy coating. While this work successfully sealed the interior surfaces of the tank, it did not resolve the source of the leakage. The second phase of the project will address the piping beneath the reservoir. The work will include exposing two 24-inch inlet and outlet pipes located outside the tank within an existing concrete vault structure. Both pipes will be rehabilitated from the vault to approximately the centerline of the reservoir interior using a cast-in-place pipe (CIPP) liner. Additionally, the project will include exposing two 8-inch drainpipes located outside the tank within an earthen area and rehabilitating both pipes using CIPP lining. The contract duration is 120 calendar days. The reservoir must be returned to service no later than March 1, 2027.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 13 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves the installation of extensive water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and drainage improvements. The contract encompasses electrical upgrades, instrumentation and controls, piping systems, and civil works such as the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, managed by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. Support is available for M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and the use of apprentices is encouraged.
James W. Fowler Co.

POSTED

about 13 hours ago

DEADLINE

in 24 days
View Details

More opportunities from Arizona → Public Works

Same awarding agency