Sundog Trunk Main Sewer Phase C3

Active
2026-NIBCONST-559State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sundog Trunk Main Sewer Phase C3 project is a critical infrastructure initiative by the City of Prescott to centralize wastewater treatment operations by redirecting flows from the Sundog Wastewater Treatment Plant to the Airport Water Reclamation Facility. This effort aims to increase surge capacity, mitigate overflow risks, and ensure environmental compliance following regulatory notices from the Arizona Department of Environmental Quality. The project involves the construction of the C3 Lift Station and associated trunk mains, replacing aging infrastructure to support city growth and enable the eventual decommissioning of the Sundog plant. Solicitation number 2026-NIBCONST-559 was posted on August 28, 2026, with a response deadline of October 1, 2026. The scope of work is governed by the City of Prescott's supplements to the MAG Uniform Standard Specifications and includes detailed requirements for earthwork, electrical systems, instrumentation, and pump selection. Due to federal funding, the project must adhere to Buy America preferences and American Iron and Steel requirements. Technical execution is supported by a comprehensive geotechnical report and a specific basis of design for the lift station to ensure structural and hydraulic reliability.

General Info

City of Prescott sewer project consolidating wastewater treatment by October 1, 2026.

Agency

Arizona → Public WorksView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

(12)

City of Prescott Supplement to MAG Uniform Standard Specifications - Technical Specifications Feb 14 2019

PDF132 pagesspecifications

C3 Lift Station Basis of Design Report, August 2026

PDF52 pagessow

Sundog Trunk Main Sewer Phase C3 Geotechnical Report (Appendix A)

PDFsow

OMB Memorandum M-22-11 on Buy America Preference Implementation Guidance

PDF17 pagesguidance-memorandum

American Iron and Steel Requirement Guidance - EPA March 20, 2014

PDF8 pagesguidance

Prescott Sundog C3 Lift Station - Final Plan Set

PDFspecifications

City of Prescott Construction Contract

PDF15 pagescontract-document

Sundog Phase C3 Final Cost Estimate Bid Schedule

XLSX14 pagesbid-schedule

City of Prescott Sundog Trunk Main Sewer Phase C3 Notice Inviting Bids

PDF24 pagesifb

CIP 20-016 Sundog Trunk Main Sewer Phase C3 - Project Special Provisions

PDF49 pagesspecial-provisions

City of Prescott C3 Lift Station Technical Specifications

PDF752 pagessow

Sundog Trunk Main Sewer C3 Appendix B

PDF4 pagesspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyArizona → Public Works
Contacts2 people available
OfficePrescott, AZ, 86301, USA
Organization / Agency
Arizona → Public Works
View Agency Profile
Office AddressPrescott, AZ, 86301, USA
Contacts
Jason FergusonCapital Projects Manager
Jaimie SventekContracts Coordinator

Interested Companies (53)

Show more
LJL Construction & Environmental
Chandler, AZ
Armorock
Sulphur Springs, TX
Pipe Jacking Trenchless
Lake Forest, CA

See All 53 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Sundog Trunk Main Sewer Phase C3 Project is essential to The City of Prescott's centralization initiative consolidating treatment operations from the Sundog Wastewater Treatment Plant (SWTP) to the more modern and expandable Airport Water Reclamation Facility (AWRF). This multi-year program, adopted by a City Council resolution in 2015, aims to create a single, centralized facility combining SWTP's 3 MGD and AWRF's 4.75 MGD capabilities. Phase C3 represents a critical component of this centralization effort. It builds on prior phases by enabling the redirection of flows from the downtown and surrounding areas to the Airport Water Reclamation Facility. Completion supports the eventual decommissioning of the Sundog plant, delivering significant long-term operational savings, improved system reliability, and enhanced environmental compliance. This project is vital for several reasons: Capacity and Growth: It addresses current and future wastewater capacity limitations identified in the 2023 Water and Wastewater Models Master Plan, supporting Prescott's development and existing population needs. Environmental Protection and Regulatory Compliance: Storms in early 2023 caused sewer surges leading to an Arizona Department of Environmental Quality notice of violation and consent order. Centralization projects like C3 increase surge capacity and mitigate overflow risks. Infrastructure Renewal: It replaces or augments aging, undersized, or failing infrastructure lowering maintenance costs and minimizing sanitary sewer overflows. Community and Economic Benefits: Reliable wastewater service protects public health, supports tourism and local businesses, and enables redevelopment of the Sundog site for other public uses. Vendors who deliver high-quality work on this project will directly contribute to Prescott's resilience, environmental stewardship, and fiscal responsibility.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. The project requires the provision of all necessary labor, materials, transportation, tools, and equipment to deliver a complete and operational water transmission system, including final disinfection, startup, and commissioning. Issued by Garney Pacific, Inc. for the Jurupa Community Services District, this solicitation seeks subcontractor and supplier quotes by September 18, 2026, at 2:00 PM PT. The project is open to various set-aside categories, including Small Business, SDB, WOSB, HUBZone, DBE, and DVB. Key requirements for subcontractors include the mandatory use of union labor and the ability to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Requested trade scopes encompass a wide range of services, including traffic control, SWPPP monitoring, utility potholing, survey and staking, asphalt and concrete restoration, steel pipe welding, electrical and instrumentation, and materials testing.
Garney Pacific, Inc.

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of green infrastructure designed to treat 1.7 acres of impervious surface within a 3.3-acre drainage area. Key deliverables include the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants. The scope also encompasses necessary drainage, underdrain, inlet, pipe, and downspout work, along with ADA-compliant curb, sidewalk, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, concluding with final stabilization and restoration. This solicitation specifically seeks subcontractors and suppliers from minority-owned, disadvantaged, and women-owned business enterprises, as well as other small business categories including HUBZone, veteran-owned, and service-disabled veteran-owned firms. Small businesses are encouraged to form consortiums if individual bid items exceed their capacity. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a formal response indicating their intent to bid.
Harbel, Inc.

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as 54-inch and 145.5-inch diameter tie-ins. Additional infrastructure requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

1 day ago

DEADLINE

in 21 days
View Details

More opportunities from Arizona → Public Works

Same awarding agency

NAICS: 237110
New
SLED
South Tank Pipe Relining Project
Solicitation # 2026-NIBCONST-592
The City of Prescott is soliciting bids for the South Tank Pipe Relining Project, identified as solicitation 2026-NIBCONST-592. This project represents the second phase of a rehabilitation effort for a 5-million-gallon concrete reservoir constructed in the early 1990s. While the first phase addressed the interior shell and columns with epoxy coating, this phase focuses on resolving persistent leakage by performing trenchless rehabilitation and lining of the piping beneath the reservoir. The scope of work includes the exposure and cast-in-place pipe lining of two 24-inch inlet and outlet pipes located within a concrete vault, as well as the exposure and lining of two 8-inch drainpipes located in an earthen area. The contract is managed by the Public Works agency and requires a completion timeframe of 120 calendar days, with a strict requirement that the reservoir be returned to service by March 1, 2027. Bids must be submitted by October 1, 2026. The project is subject to the City of Prescott Supplement to MAG Uniform Standard Specifications and must comply with federal domestic procurement mandates, including the Buy America preference and American Iron and Steel requirements for federally funded water infrastructure. The agreement establishes the contractor as an independent entity and mandates that work commence within 10 days of notification.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS