Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on September 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Warranty and Service Support Provider

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811192
SLED
Bus & Fleet Vehicles Cleaning and Washing Services
Solicitation # 56-2705BTRFP
East Carolina University is soliciting proposals for a recurring exterior washing and interior cleaning contract for its Parking and Transportation Services fleet, which consists of 49 vehicles including transit buses, motor coaches, vans, and trucks. The selected vendor will provide all necessary labor, equipment, and supplies to maintain the fleet on a scheduled, pay-per-service basis. Services must be performed on-site at 285 Easy Street in Greenville, North Carolina, and vehicles may not be removed from university property. The contract has an initial two-year term beginning January 1, 2027, or upon final execution. The vendor must provide a comprehensive technical approach including a wastewater disposal plan, a list of EPA-registered disinfectants, and a quality control system that ensures deficiencies are corrected within 24 hours. Award decisions will be based on a ranking method prioritizing the vendor's technical approach, qualifications, experience, and project organization. Requirements include strict adherence to OSHA and environmental laws, the provision of a designated contract manager, and specific insurance coverages, including commercial general liability of $1,000,000 per occurrence and pollution liability for mobile washing. Proposals must be submitted electronically via the electronic Vendor Portal by December 10, 2026.
East Carolina University

POSTED

8 days ago

DEADLINE

in 23 days
NAICS: 811192
SLED
Pre-Qualification: Guadalupe Light Rail Vehicle Wash Improvements
Solicitation # C25134F
The Santa Clara Valley Transportation Authority is soliciting pre-qualifications for Contract C25134F, the Guadalupe Light Rail Vehicle Wash Improvements project. This project involves the removal and replacement of the existing Light Rail Vehicle wash system at Building F of the Guadalupe Division with a new hybrid drive-through and gantry wash system. The scope of work is comprehensive, encompassing civil and trackwork, electrical installations, plumbing, structural work for a new prefabricated canopy, and the installation of industrial equipment including a water reclamation and filtration system. The estimated construction cost for the project is between 4.5 million and 5.5 million dollars. To be eligible for the subsequent Invitation for Bid, bidders must be approved through this pre-qualification process by submitting a completed qualification questionnaire and a Statement of Qualifications. Key eligibility requirements include possessing a California contractor's license with at least 10 years of experience as a Class A or B general contractor. Evaluation is based on essential requirements, organizational performance scoring, and project experience interviews. Bidders must also provide proof of bonding capacity, maintain specific liability and workers compensation insurance, and ensure all entities and subcontractors are registered with the California Department of Industrial Relations. The final deadline for pre-qualification submissions is December 23, 2026, at 2:00 pm PT.
Engineering and Program Delivery

POSTED

12 days ago

DEADLINE

in about 1 month
NAICS: 811192
SLED
High Pressure Under Chassis Vehicle Wash Rebid
Solicitation # DPW-27-420-06
The Town of Hopkinton Department of Public Works is soliciting bids for the supply and installation of a high-pressure under chassis vehicle wash system at 83 Wood Street, Hopkinton, MA. The project requires a qualified contractor to provide all labor, materials, supervision, and equipment for a system featuring a stainless steel frame with a minimum 10-year warranty, delivering 15.8gpm at 1,500 psi. The system must include automated high-pressure entrance and exit components with rust fighter chemical injection and must be pre-assembled and wet-tested at the factory prior to shipping. The contract will be awarded to the lowest responsible and eligible bidder in accordance with Massachusetts General Law Chapter 149. Bidders must submit one original hard copy and one electronic copy on a thumb drive by the deadline of November 20, 2026. Required submission documents include a bid deposit of 5% of the bid price, a completed General Bid Pricing form, three professional references from the last seven years, and certifications for non-collusion, tax compliance, and OSHA standards. Upon award, the contractor must provide a 50% payment bond, a certificate of insurance, and a W-9. Payment is structured as a lump sum upon completion and acceptance by town officials, subject to a 5% retainage. Failure to complete the work within the specified timeframe will result in liquidated damages of 500 dollars per calendar day.
Town of Hopkinton

POSTED

13 days ago

DEADLINE

in 3 days

AI Contract Overview

Show more

Imperial County in California is seeking a subcontract for a Warranty and Service Support Provider to maintain Ford F-150 Lightning vehicles. The primary objective of this agreement is to ensure that warranty services and post-delivery maintenance are performed to meet the specific operational standards of the county. The solicitation was posted on September 12, 2024, with a response deadline of September 20, 2024. This opportunity falls under NAICS code 811192 and is managed through the PlanetBids portal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 25-0081.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFQ - Imperial County Air Pollution Electric Vehicle (Ford)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Car wash services for vehicles fleet of IOM Ukraine under LTA for 1 yearOpen now
  • Bus & Fleet Vehicles Cleaning and Washing ServicesOpen now, due in 24 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Imperial County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide warranty service and post-delivery maintenance support for the Ford F-150 Lightning to meet county operational standards.

More opportunities from California → Imperial County

Same awarding agency

NAICS: 541620
New
SLED
Imperial County Lithium Valley Specific Plan
Solicitation # 2023120104
The Imperial County Lithium Valley Specific Plan (LVSP) is a comprehensive land use and zoning initiative authorized by Senate Bill 125 to develop lithium resources and renewable energy infrastructure within the Salton Sea Known Geothermal Resource Area. Spanning approximately 51,620 acres, the project aims to establish an environmentally conscious employment hub by streamlining the permitting process for geothermal energy production and lithium extraction, processing, and manufacturing. The plan introduces various land use designations, including Green Industrial, Manufacturing, Logistics, and Conservation, while incorporating an Agricultural Overlay to balance industrial growth with the preservation of prime farmland. This initiative is designed to support the national production of sustainable energy technologies, enhance local economic stability through excise and property taxes, and fund Salton Sea restoration and community benefits. The project is governed by a Program Environmental Impact Report (PEIR) and a Water Supply Assessment to ensure compliance with the California Environmental Quality Act and Senate Bill 610. Key operational requirements include a 40 percent local hiring goal for construction workers, the payment of prevailing wages, and strict adherence to Cal/OSHA and OSHA safety standards for hazardous materials and excavation. Environmental protections are prioritized through the use of qualified biologists for wildlife surveys, rigorous dust control measures, and the protection of sensitive cultural resources. The project involves extensive coordination with state agencies, including Caltrans for transportation impacts, the California Energy Commission for geothermal permitting, and the Department of Toxic Substances Control for hazardous waste management.
Environmental Consulting Services

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 812930
SLED
Linn Parking & Storage Project (CUP #25-0015, MERG #00165, IS #25-0033)
Solicitation # CUP #25-0015, MERG #00165, IS #25-0033
The Linn Parking and Storage project, identified by Conditional Use Permit #25-0015, Lot Merger #00165, and Initial Study #25-0033, involves the expansion of a parking and storage facility located at 1624 Gateway Road in Calexico, California. The project will merge three contiguous parcels to create a 7.1-acre site designed to accommodate up to 140 trucks and trailers and 60 passenger vehicles. The facility will operate 24/7 with approximately eight employees and will include mini-storage units for receiving customer packages from delivery companies. The expansion aims to improve traffic circulation and site safety, with projected daily traffic of 60 trucks and 30 passenger vehicles accessing the site via Gateway Road. The project was approved on September 9, 2026, following an environmental review that resulted in a Negative Declaration under the California Environmental Quality Act. Construction is scheduled to begin on June 2, 2026, with a phased timeline including demolition, site preparation, grading, building construction, paving, and architectural coating, concluding in late November 2026. Key requirements include compliance with Imperial County Fire Department standards, the installation of fire-rated access roads and water systems, and the submission of hazardous material management plans. The applicant is responsible for all costs related to land acquisition, infrastructure relocations, and the payment of water, sewer, benefit impact, and traffic mitigation fees prior to the issuance of building or grading permits.
Parking Lots and Garages

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
The Towers LLC (CUP26-0006/IS26-0007)
Solicitation # CUP26-0006
The Towers, LLC is proposing the construction of a Wireless Communication Facility in Niland, California, located at 307 E. Winslow Rd. The project consists of a 120-foot-tall, non-reflective, galvanized sky-blue monopole tower and related equipment situated within a 50-foot by 50-foot leased and fenced area. The primary objective of the facility is to enhance Verizon's 5G and 4G LTE coverage in the Calipatria area, specifically along Highway 111. The installation includes a 6-foot chain-link fence for equipment screening, internal cabling, FAA-compliant aircraft warning lighting, and an adjacent IID transformer, while water and sewer services are not required. The project is managed under Conditional Use Permit CUP26-0006 and Initial Study IS26-0007 by the Imperial County Planning and Development Services Department. An environmental review conducted under CEQA guidelines resulted in a Negative Declaration, concluding that the project will not have significant environmental effects. The Imperial County Planning Commission approved the project on September 9, 2026, with a Notice of Determination filed on September 17, 2026. Key regulatory requirements include compliance with FCC RF exposure standards, National Electrical Code standards, and the ability to support the co-location of two additional carriers. The applicant has requested a 10-year permit term and is subject to site restoration requirements and potential public benefit agreements with the Imperial Valley Emergency Communication Authority.
Power and Communication Line and Related Structures Construction

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 624229
SLED
NHHA (National Healthcare & Housing Advisors) CUP#26-0001, IS#26-0001
Solicitation # CUP26-0001
The applicant, National Healthcare & Housing Advisors, LLC, has requested a Conditional Use Permit to operate an Interim Recuperative Care and Transitional Housing facility within the Imperial Center Specific Plan Area, asserting that the proposed use is functionally analogous to an extended-stay hotel with integrated social services—a use already recognized under the plan. The facility will span approximately 27,000 square feet across two buildings, divided into three 9,000-square-foot suites, and will serve 80 to 100 clients while employing up to 50 local staff members. Operations will run continuously, 24 hours a day, seven days a week. Services include day habilitation, post-hospitalization recuperative care, behavioral health support, community health worker programs, a sobering center, enhanced care management, and street medicine, all aligned with NHHA’s CalAIM program aimed at achieving permanent housing stability for participants. Clients may receive services for an initial 90-day recuperative period, with the possibility of extending housing support for an additional six months. The project falls under the same regulatory review framework applied to hotels and transitional housing in the area, and its approval hinges on securing the conditional use permit, designated as CUP#26-0001.
Other Community Housing Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 221116
SLED
CUP23-0020/IS23-0026-Dogwood Geothermal Energy Project
Solicitation # GEO Heber Field Co. 2 Wells 06052026
The Dogwood Geothermal Energy Project is located on approximately 125 acres about one mile south of Heber in Imperial County, California. The project encompasses the construction and operation of a geothermal plant, associated facilities, a geothermal fluid pipeline, and solar energy facilities, including a 15 MW solar facility and a 7 MW parasitic solar facility. The scope of work specifically involves the installation of geothermal production and injection wells, which includes preparing well pads, drilling and completing the wells, and connecting them to the pipeline network. Under solicitation GEO Heber Field Co. 2 Wells 06052026, CalGEM has approved permits for Heber Field Company to install two specific geothermal wells, identified by API numbers 02591586 and 02591587. The project is governed by the California Environmental Quality Act and is based on an Environmental Impact Report prepared and certified by the Imperial County Planning and Development Services in August 2025. Final approval for the project was granted by the Imperial County Board of Supervisors on August 5, 2025, with subsequent permit approvals from the California Geologic Energy Management Division issued on June 5, 2026. The project site is located at 855, 853, and 602 Dogwood Road, Heber, CA, and must adhere to all adopted mitigation measures and monitoring plans specified in the environmental documentation.
Geothermal Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Parcel Map (PM) #02518/IS25-0022
Solicitation # PM#02518/IS#25-0022
Parcel Map #02518 and Initial Study #25-0022 involve the subdivision of an 8.83-acre agricultural property located at 604 W. Murphy Road in Imperial, California. The project, proposed by Josh Quintero and overseen by the Imperial County Planning and Development Services Department, aims to divide the land into four legal parcels to separate an existing shop and facilitate residential development. Parcel 1 will be approximately 4.85 acres, while Parcels 2, 3, and 4 will each be approximately 1.33 acres. Access to Parcel 1 and 4 will be via Murphy Road, and Parcels 2 and 3 will be accessed via Nance Road. The project has been processed under the California Environmental Quality Act, resulting in a Negative Declaration and a Notice of Determination stating that the subdivision will not have a significant environmental effect. Technical requirements include a parcel map prepared by a licensed California Land Surveyor or Civil Engineer using the North America Datum of 1983. Infrastructure mandates include the installation of an approved water supply for fire flow per California Fire Code, the construction of three driveways on Nance Road, and the installation of non-contiguous sidewalks. Additionally, the project requires a grading and drainage plan to prevent cross-parcel drainage and may necessitate financial security, such as a road improvement bond or letter of credit, for off-site improvements. Final recordation of the map is contingent upon providing a tax certificate and a subdivision guarantee.
Land Subdivision

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Heber 1 Parasitic Solar Energy ProjectThe Heber 1 Parasitic Solar Energy Project involves the development of a 20 megawatt solar energy facility and an interconnecting medium voltage cable line in unincorporated Imperial County, California. The facility is designed as a behind-the-meter system to provide parasitic load power to offset the auxiliary load of the existing Heber 1 Geothermal Plant, meaning it will not connect to or generate power for the transmission grid. The project will be located on approximately 121.44 acres of land, including a 106.19-acre solar field and a cable route of approximately 15.25 acres. Construction is anticipated to take 16 to 19 months starting in late 2025, spanning site preparation, project construction, and switch development and interconnection. The project is subject to a Conditional Use Permit and comprehensive environmental review under the California Environmental Quality Act. Key requirements include compliance with fugitive dust regulations, the implementation of a Water Quality Management Plan, and the execution of a Stormwater Pollution Prevention Plan. Extensive biological and cultural assessments have been conducted, including surveys for western burrowing owls, bat acoustics, and avian populations, as well as tribal cultural resource consultations. The project requires the use of approved botanical field surveyors and the implementation of a mandatory education program for all construction personnel. Additionally, the project applicant must participate in the Imperial County Public Benefit Program and enter into a public benefit agreement to cover associated costs and fees.
Solar Electric Power Generation

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS