Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Wedgewood Generator Design

Active
2140031State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The New York State Office for People with Developmental Disabilities, Hudson Valley DDSO, is seeking quotes for a design-only project to install a stand-by whole house generator at the Wedgewood IRA located at 19 Wedgewood Lane, Middletown, NY. The selected vendor must provide P.E. stamped design drawings and a load analysis conducted per Article 220.87 of the National Electric Code, ensuring all work adheres to the current NEC and NYS Residential Code. The project must be completed within 30 days of receiving the purchase order and includes a requirement for a one-year warranty on all material and labor. Prospective vendors must attend a mandatory site visit on either November 2nd or November 3rd, 2026, to remain eligible for submission. Quotes must be submitted using the official Quote Proposal Form and include a detailed cost breakdown of materials, equipment, and labor, as well as a contractor reference list and a substitute W-9. All submissions are due by November 12th, 2026, at 2:00 PM. The contract will be awarded to the most responsible and responsive vendor offering the lowest cost. Eligibility requires registration with the New York State Department of Labor per Labor Law 220-i, and vendors must be prepared to demonstrate two years of relevant experience. Awarded contractors are required to submit certificates of Liability and Worker’s Compensation Insurance, completed Lobbying Law Forms, and a signed Appendix A. Additionally, all quotes must reflect correct prevailing wages, and subcontracting is generally prohibited without prior written approval from the OPWDD.

General Info

Design-only project for whole house generator installation at Wedgewood IRA in Middletown, NY.

Place of Performance

Please see attached scope of work and general requirements in the documents tab. *Note contractor is to provide and supply a 1-, NY, USA

Set-Aside

NONE

Documents

8

Amended Quote Proposal Form - Wedgewood Generator Design

DOCX, High priority: read this firstrfq
High

Wedgewood Generator Design - Amended RFQ

PDF, High priority: read this firstrfq
High

Wedgewood Generator Design - CR# 2140031

PDF, High priority: read this first9 pages · rfq
High

Wedgewood Generator Design Quote Proposal Form

DOCX, High priority: read this firstrfq
High

Wedgewood Generator Design RFQ

PDF, High priority: read this firstrfq
High

Wedgewood Generator Design - RFQ 2140031

PDF, High priority: read this first9 pages · rfq
High

Contractor Reference List - Wedgewood Gen Design

PDF, Low priority2 pages · past-performance
Low

NYS Office of the State Comptroller Substitute Form W-9

PDF, Low priority2 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew York → NYS Office for People with Developmental Disabilities
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Mary Sorensen-WalshBusiness Officer 1
Victoria MannBusiness Officer 2
Mary Sorensen-WalshBusiness Officer 1

Full Description

Show more
Please see attached scope of work and general requirements in the documents tab. *Note contractor is to provide and supply a 1-year warranty on material and labor. * Dear Vendor: Enclosed is a request for quotation (RFQ) to DESIGN the attached scope of work. Mandatory site visit: Wedgewood IRA: 19 Wedgewood Lane, Middletown, NY 10940 Mandatory site visit will be held either Monday, November 2nd, 2026 @ 9:00 AM or Tuesday, November 3rd, 2026 @ 12:00 PM at the above address. Please confirm your attendance prior to the site visit by contacting Marco Martinez, MSII +1 (555) 000-0000 or via email at contact@example.gov. Attendance will be recorded. Please be sure to sign the sign in sheet (provided by the Maintenance staff conducting the site visit). The sign in sheet is a separate entity from the resident visitor’s log. When signing in, be sure to check the project name listed on the sign-in sheet to ensure you are recording your attendance correctly. Failure to do so will cause out to be ineligible to submit a quote. There are no exceptions. Please write clearly for corresponding purposes and make sure you include an email address and phone number where you can be reached. Late arrivers at the site will not be allowed to sign in, participate, nor submit a quote for this project. If you are unable to attend either day, you will not be able to schedule a site visit at different time. Method of Award: This is an RFQ (request for quotes). This is not an IFB (bid). The Hudson Valley DDSO intends to award the contract to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Upon request, vendor must demonstrate 2 years of relevant experience on prior projects of similar magnitude and its subject to vendor responsibility determination. Hudson Valley DDSO reserves the right to reject any and all quotes. In deciding whether to submit a quote, please be aware the awarded vendor must adhere to the time frames outlined in the scope of work. The awarded vendor will also be required to submit certificates of Liability Insurance and Worker’s Compensation Insurance as well as completed Lobbying Law Forms, and signed Appendix A. Please be prepared to submit these in a timely fashion. The Hudson Valley DDSO will make no concessions to the vendor for any alleged misunderstanding or deception because of quantity, quality, character, or other condition. The Hudson Valley DDSO’s interpretation of specifications shall be final and binding. Please note, all staff working at the project site will be required to sign an attendance sheet for record purposes. This includes the residence visitor log and/or an attendance sheet provided by the Maintenance Department. In the event of a tie, contract will be awarded to the Contractor whose bid was received earliest. NYS Labor Law 220-i Registration Required: Effective December 30, 2024, in order to be qualified to work on public works projects covered by Article 8 of the Labor Law, all contractors (including subcontractors) must be registered with the New York State Department of Labor (NYSDOL) in accordance with Labor Law § 220-i. Contractors must be registered before submitting a bid. In addition, contractors must be registered prior to commencing any new work. Please note that subcontractors are not allowed without OPWDD written approval. During this transition period, for projects where the bids were due prior to December 30, 2024, but the work will commence after that date, contractors not already registered with DOL must be registered prior to the commencement of the work. When submitting a bid to the Office for People With Developmental Disabilities (OPWDD) for Article 8 public work contracts, bidders must provide their NYSDOL registration number in the designated space on the bid form and submit their Certificate of Registration. Failure to provide a valid and verifiable registration number from the NYSDOL Registry and Certificate of Registration at the time of bid submission will result in disqualification of the bid. Registration is open NOW! Please note, per the NYSDOL website, NYSDOL estimates it may take approximately 3-4 weeks to review a registration application and issue a Certificate of Registration. Please take action promptly and register now to avoid any disruptions in your bidding process or project schedule. For more information and instructions on how to become registered, please visit the NYS Department of Labor website at: Contractor and Subcontractor Landing | Department of Labor Need More Help? Please review the frequently asked questions on the NYSDOL website that have been created to provide additional support: Frequently Asked Questions for NYSDOL Contractor Registry | Department of Labor. For any additional questions regarding the Contractor Registry process, please reach out to the Bureau of Public Work and Prevailing Wage at +1 (555) 000-0000 or send an email to: contact@example.gov. Subcontracting: OPWDD/Hudson Valley DDSO does not allow subcontracting on this type of work. Submission of quote: All quotes (for the design) MUST be received in the Hudson Valley DDSO Business office by Thursday, November 12th, 2026 @ 2:00 PM The quotes may be hand delivered, mailed and or emailed as long as they are RECEIVED in the Business Office prior to the deadline. EMAIL IS PREFERRED! Please check your submission for arithmetic errors and correct labor wages. Hudson Valley DDSO reserves the right to reject any quote which does not reflect the correct prevailing wages in accordance with the wage schedule provided. Tabulation of quotes will be posted to the listings on NYS Contract Reporter along with the award. ADDRESS: Hudson Valley DDSO, Business office, 7 Wilbur Road, Thiells, NY 10984 EMAIL: contact@example.gov cc: contact@example.gov and contact@example.gov At this time, we prefer the quote be emailed to: contact@example.gov cc: contact@example.gov and contact@example.gov *THIS IS A DESIGN ONLY PROJECT* *PLEASE USE OUR QUOTE PROPOSAL FORM FOR YOUR BID. ANY OTHER PROPOASL FORMS WILL NOT BE ACCEPTED*

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from New York → NYS Office for People with Developmental Disabilities

Same awarding agency

NAICS: 238220
New
SLED
Heating Baseboards, 6262 Morris Road Marcy NY
Solicitation # 2140247
The NYS Office for People with Developmental Disabilities is soliciting bids for a discretionary procurement project to replace and extend hydronic baseboard heating at the Morris Rd. IRA facility located at 6262 Morris Road, Marcy, NY. The scope of work requires the installation of Haydon 750 Series Hydronic Baseboards or an approved equal, including extensions of approximately 5 feet in the entryway and Bedrooms 1 and 2, and approximately 7 feet in Bedroom 3. Additionally, new baseboard covers with matching end caps must be installed in the bathroom and closet. The project includes all necessary mechanical and piping work to extend and reconnect copper supply and return lines to the existing boiler piping in both the basement and upstairs. The contractor is responsible for verifying all field dimensions, complying with local codes and manufacturer requirements, and ensuring the system is purged of air, tested, and balanced for temperature and flow before closeout. This is a NYS Public Works project requiring prevailing wages under PRC 2026028739, with a target completion timeline of 30 days from the date of award. Key administrative requirements include a mandatory safety meeting with DDSO staff prior to commencement, daily site cleanup, and a final quality control inspection with the project manager. Bids are to be submitted via email to Joseph Burnett by the close of business one week following the site visit held on October 28, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in 16 minutes
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS