This Solicitation opportunity from Department Of The Interior was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The National Park Service is soliciting a firm-fixed-price contract for the tunnel stabilization of the Staple Bend Tunnel at the Allegheny Portage Railroad National Historical Site. This total small business set-aside is restricted to firms registered under NAICS code 237990. The scope of work includes a stabilization maintenance plan, scaling, fossil inventory, installation of rock bolt anchors, void fill concrete, gunite, and drainage work. Performance is scheduled from November 9, 2026, through December 31, 2027. Access to the site is strictly limited to the Northwest entrance, and contractors must adhere to a maximum equipment height of 18 feet inside the tunnel.
Award will be based on the Lowest Price Technically Acceptable process, evaluating technical capability and price. Proposals must be submitted as two separate electronic files: a technical volume detailing the approach to stabilization and historic preservation, and a separate pricing volume in MS Excel. Key requirements include the provision of a site-specific safety plan, compliance with Davis-Bacon Act wage rates, and the identification of a qualified paleontologist and team leader. Contractors must provide a bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, and are required to use the Invoice Processing Platform for electronic payments.
General Info
Small business contract for tunnel stabilization at Allegheny Portage Railroad National Historical Site.
HighAI Summary for 140P4226R0026 - Amend 0002 - Updated Schedule and Specifications: Amendment 0002 to solicitation 140P4226R0026 for the Allegheny Portage Railroad National Historical Site (ALPO). The document includes an updated bid schedule (Section B) with base items such as stabilization maintenance, scaling, and fossil inventory, as well as optional items. It also contains technical specifications (Section C) regarding tunnel inspection and rock bolt maintenance.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for 140P4226R0026 Amendment 0001 - ALPO Tunnel Stabilization: Amendment 0001 to solicitation 140P4226R0026 for the Allegheny Portage Railroad National Historical Site (ALPO) Tunnel Stabilization of Staple Bend Tunnel. The primary purpose of this amendment is to extend the closing date and time to Friday, October 30, 2026, to allow the Government to resolve technical questions. The procurement is a 100% Small Business Set-Aside Firm-Fixed Price contract with a period of performance from 11/09/2026 to 12/31/2027.
DOCX
DOCX, High priority: read this first5 pages · proposal-submission-package
HighAI Summary for 140P4226R0026 Attachment 10 - Proposal Submission Package: Dated August 13, 2026, this document is Attachment 10 to Solicitation 140P4226R0026 for the Tunnel Stabilization of Staple Bend Tunnel at the Allegheny Portage Railroad National Historical Site. It provides the required forms for proposal submission, including SAM registration certification for NAICS 237990, Biobased Certification, subcontracting compliance, and a Relevant Experience Questionnaire for documenting three similar past projects.
XLSX
XLSX, High priority: read this first2 pages · specifications
HighAI Summary for 140P4226R0026 - Limitations on Subcontracting Compliance Worksheet: A compliance worksheet for solicitation 140P4226R0026 used to demonstrate adherence to FAR 52.219-14 Limitations on Subcontracting. The document includes templates for reporting participation percentages for similarly situated and non-similarly situated subcontractors, both at the proposal stage and at contract closeout, specifically for general construction services.
PDF
PDF, High priority: read this first79 pages · rfp
HighAI Summary for 140P4226R0026 - Staple Bend Tunnel Stabilization: Request for Proposal (RFP) issued by the National Park Service (NPS) for the stabilization of the Staple Bend Tunnel at the Allegheny Portage Railroad National Historical Site. This is a 100% Small Business Set-Aside, Firm-Fixed Price contract. The scope includes a stabilization maintenance plan, scaling, fossil inventory, rock bolt anchors, void fill concrete, gunite, and drainage. Performance is expected to begin around September 2026 with a period of performance extending to December 31, 2027.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 1991 GEI Geotechnical Report - Staple Bend Tunnel: A 1991 geotechnical report by GEI Consultants, Inc. for the Staple Bend Tunnel in Johnstown, PA. The document provides an executive summary of the site's geology, an assessment of tunnel stability, and specific recommendations for the restoration of the west portal facade and masonry lining to ensure safety for public access.
XLSX
XLSX, High priority: read this first2 pages · specifications
HighAI Summary for ALPO/215161 Staple Bend Tunnel Stabilization - Submittal List: This document is a submittal list and review estimate template for the National Park Service (NPS) Denver Service Center, specifically for the Staple Bend Tunnel Stabilization project (ALPO/215161). Dated January 27, 2021, it provides instructions and a template for Architect/Engineer (A/E) and Construction Contracting Officer Representatives (COR) to track construction submittals, distinguish between informational and action submittals, and estimate the labor hours required for review to negotiate task order costs.
PDF
PDF, High priority: read this first10 pages · specifications
HighAI Summary for ALPO Staple Bend Tunnel Construction Drawings (423): Construction drawing package for the stabilization of the Staple Bend Tunnel at the Allegheny Portage Railroad National Historic Site (ALPO). Dated July 31, 2025, the document includes a cover sheet, staging plan, tunnel orientation, and detailed proposed and existing mitigations (rock bolts, shoring, and void fill) across various stations. It contains critical technical specifications, site layout, and contractor requirements regarding safety, environmental protections (bats), and paleontological resources.
PDF
PDF, High priority: read this first153 pages · specifications
HighAI Summary for ALPO Staple Bend Tunnel Stabilization - Project Specifications (PMIS 215161): Project specifications for the Staple Bend Tunnel stabilization at the Allegheny Portage Railroad National Historic Site in Johnstown, PA. The document, dated 11-27-23, outlines the scope of work including rock bolting, gunite installation, void fill, shoring post installation, rock scaling, and mesh installation. It includes detailed sections on project management, safety, historic preservation, and site-specific construction restrictions.
PDF
PDF, High priority: read this firstsow
HighAI Summary for ALPO Staple Bend Tunnel - Statement of Structural Tests and Special Inspections: Statement of Structural Tests and Special Inspections for the Allegheny Portage Railroad National Historic Site (ALPO), Staple Bend Tunnel Stabilization Project, prepared by NPS Denver Service Center and dated 8/22/24 with prepared-by date 8/4/2025. The document addresses IBC 2024 Chapter 17 requirements, notes seismic and wind requirements as not applicable, and lists qualification requirements for inspectors and testing technicians. It also provides instructions for required special inspections and testing, and states that reports must be provided to the Contracting Officer and deficiencies corrected.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Amendment 0002 Attachment 11 - Tecco Technical Drawings: Technical specifications and system drawings for TECCO G65/3 high-tensile steel wire mesh, including cross-section A-A and installation details for spike plates, press claws, and boundary ropes. Dated February 2023, provided as Attachment 11 to Amendment 0002.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NPS Allegheny Portage Railroad N.H.S. Topographic Sheets: A series of topographic sheets (including sheets 1, 3, and 4 of 18) for the Stable Bend Unit of the Allegheny Portage Railroad National Historic Site. Produced by the National Park Service Denver Service Center, the documents include coordinate data (Pennsylvania State Plane Coordinates South Zone), scale information, and vertical datums based on NGVD 1929.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NPS Staple Bend Tunnel - Location Maps and Lab Testing Report: Technical appendix containing location maps, geologic maps, and site plans for the NPS Staple Bend Tunnel in Johnstown, PA. It includes detailed laboratory testing results (Unconfined Compressive Strength) for sandstone and shale samples, including Young's Modulus and unit weight, provided by Montana Tech’s Geomechanics Lab.
PDF
PDF, High priority: read this first17 pages · wage-determination
HighAI Summary for PA20260002 Heavy and Highway Wage Determination: Wage determination document for procurement PA20260002 regarding Heavy and Highway projects, dated July 30, 2026. The document specifies labor rates and wage requirements for various classifications.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for Solicitation 120P4226R0026 Amendment 0002 - Questions and Answers: This document provides official questions and answers for Solicitation 120P4226R0026 (Amendment 0002) regarding the stabilization of the Staple Bend Tunnel at Allegheny Portage Railroad National Historical Site. It includes critical technical clarifications on bat seasonal restrictions, requirements for bat house installation, geotechnical report availability, rock bolt quantities, mesh and gunite installation details, and scaling specifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Solicitation 140P4226R0026 Amendment 0002: Amendment 0002 to solicitation 140P4226R0026 for the Tunnel Stabilization of Staple Bend Tunnel at Allegheny Portage Railroad National Historical Site. Dated 10/05/2026, this amendment addresses contractor questions via a Q&A attachment, updates schedule specifications and T&Cs, incorporates technical attachments (Tecco and 1991 GEI Geotechnical Report), and updates administrative office codes to PE3. The closing date remains October 30, 2026.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Staple Bend Tunnel Preservation - Construction Drawings: Construction drawing set for the Staple Bend Tunnel Preservation and Visitor Access Improvements project at Allegheny Portage Railroad NHS, Cambria County, Pennsylvania. Set 1 of 2. The file contains plan sheets, drawing index information, existing conditions survey references, stationing, tunnel portal and baseline details, and layout/landshaping sheets prepared by the Department of the Interior, National Park Service.
Allegheny Portage Railroad National Historical Site (ALPO) - Tunnel Stabilization of Staple Bend Tunnel
Amendment 0002 - Addresses Contractor asked Questions, and INCLUDES UPDATES SCHEDULE, SPECIFICATIONS and T&Cs (Sections B-M) that shall be used instead of the original Section B-M attached to SF-1442. It also includes two (2) additional attachments that will be included with the award that are needed to address contractor asked questions.
CONTRACTORS are reminded that they need to be registered as a Small Business concern in their SAM Reps and Certs under the NAICS - 237990 - Other Heavy and Civil Engineering Construction as stated in Section L and M under Factor 2- Sub-Factor A. IF THIS NAICS CODE IS MISSING FROM YOUR SAM PROFILE UNDER YOUR REPS AND CERTS IT NEEDS TO BE ADDED BEFORE YOU SUBMIT ANY RESPONSE TO SOLICITATION.
Amendment 0001 extends the closing date and time to Friday, October 30, 2026 by no later than 1600 Mountain Time.
The full solicitation is now posted in SAM.gov, including all related documents.
An organized site visit has been scheduled for: Wednesday, August 26, 2026, at 10 AM Eastern.
Participants will meet at:
Staple Bend Tunnel - Trailhead Parking Lot (For specific directions see Section C.5) 1258 Beech Hill Road Johnstown, PA 15942
A NPS shuttle will either transport and/or lead a limited number of vehicles from the Trailhead Parking Lot to the site. Any contractors that arrive late, and miss the shuttle departure, will have to make the 2-mile hike on their own. They will NOT be allowed to drive to the site location on the trail leading to the Staple Bend Tunnel on their own once shuttle has departed.
More opportunities from Department Of The Interior → National Park Service Contracting Activity
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.