Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

(20358245) (DBB-AE) Repair Eroded Shore line at Carlson Spit B7130, Bangor

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Repair Eroded Shoreline at Carlson Spit project, identified as B7130 in Bangor, is a critical infrastructure initiative managed by Navfac Northwest under the Department of the Navy. The primary objective is to mitigate shoreline erosion at Carlson Spit, which currently threatens the structural stability of the Carderock pier and reduces essential storage capacity for oil booms at Port operations. Although originally intended to be part of a larger Boat Ramp project, this specific scope was separated to facilitate the distinct environmental approvals required for shoreline restoration. This procurement is categorized as a forecast for a Design-Bid-Build (DBB-AE) contract type and is designated as an 8(a) Set-Aside in accordance with FAR 19.8. The work is scheduled to take place at the Bangor PDC location. Interested parties should note the project's focus on environmental stabilization and its importance to maintaining operational readiness and storage capabilities for naval port facilities.

General Info

Navfac Northwest 8(a) set-aside contract to repair eroded shoreline at Carlson Spit, Bangor.

Agency

Department Of The Navy → Navfac NorthwestView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

NW: BANGOR PDC, USA

Set-Aside

8A

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Northwest
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Northwest
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Carlson spit is eroding away and is in danger of affecting stability of Carderock pier and Port operations is losing storage space for oil booms. Was part of Boat Ramp project, but because of environmental approvals required by this project, it was split away from the boat ramp project.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (Work Order C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified DBE firms to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, civil, mechanical, structural, electrical, and I&C design drawings, as well as equipping, testing, and commissioning. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water well construction standards, Riverside County, and California State Water Resources Control Board regulations. The contract is set aside for small and disadvantaged businesses, including DBE, WOSB, and SDVOSB entities. Award selection is based on the most advantageous proposal, considering both price and other factors. Key requirements include the provision of performance and payment bonds for 100 percent of the contract price, a bid guarantee of five percent, and adherence to California prevailing wage laws. Consultants must maintain active SAM registration and provide a project manager as the primary point of contact. Payment is processed via monthly itemized statements, with a 45-day review and payment cycle. Proposals must be submitted via PlanetBids by September 1, 2026, and must include a cover letter, a detailed project approach, staff resumes, a five-year representative project list, and three professional references.
Ardurra Group, Inc.

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Department Of The Navy → Navfac Northwest

Same awarding agency