Arastradero Creek Restoration and Pipeline Relocation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Palo Alto

NAICS

N/A

Place of Performance

Arastradero Creek Trail, Paseo de Roble Trail, Juan Bautista de Anza Trail, Palo Alto, CA, 94303

Set-Aside

NONE

Documents

(4)

Arastradero Creek Restoration and Pipeline Relocation ISMND Summary

PDFismnd-summary

Public Review Draft ISMND_Arastradero Creek 7-9-2026

PDF

Draft Notice of Completion for Arastradero Creek Restoration Project

PDFnotice-of-completion

Notice of Intent to Adopt Mitigated Negative Declaration for Arastradero Creek Pipeline Project

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Palo Alto
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Palo Alto
Office AddressN/A
Contacts
Aaron PerkinsPrincipal Engineer
Liv NiedererEnvironmental Planner

Interested Companies (1)

Show more
WRA
San Rafael, CA

Full Description

Show more
In March 2023, the City was informed of an exposed eight-inch diameter steel gas pipeline in the Arastradero Creek in the Pearson-Arastradero Preserve. The City received approval from the United States Army Corps of Engineers (USACE) under an emergency permit to conduct a temporary creek stabilization project to protect the gas pipeline from damage caused by future storms. As part of the project, the City installed a combination of cobbles and boulder revetments in the eroded channel bed to protect the gas pipeline and prevent the upstream potable water transmission and sewer pipelines from being exposed. The San Francisco Bay Regional Water Quality Control Board (RWQCB) is requiring the City to address a six-foot headcut that resulted in the need for the emergency repair and remove all temporary fill placed under the USACE emergency permit. Therefore, the purpose of the Project is to comply with the RWQCB’s permit conditions by restoring a portion of Arastradero Creek and relocating the existing water and wastewater utilities in Arastradero Trail and the gas utility further underneath the creek. In addition, downstream of the emergency repair would be treated with woody material to encourage natural processes to deposit sediment, widen the incised sections of creek, and prevent further potential for headcut formation. The Project also proposes minor grading to Arastradero Trail, which runs along the left bank of the creek, to return functionality to an existing culvert, reducing sedimentation into the creek, and improve trail conditions.