Electric Vehicle Charging Stations Phase III

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Water Resources is seeking a contractor for the Electric Vehicle Charging Stations Phase III project. This initiative involves the installation of electric vehicle chargers at the Chrisman Pumping Plant within the San Joaquin Field Division and the Edmonston Pumping Plant, located in Bakersfield and Lebec within Kern County. The scope of work includes trenching and routing electrical conduit from designated power sources to new concrete pads, upon which the charging stations will be mounted. All work will be performed within the DWR right of way, with staging occurring on existing roadways and parking lots. The project is classified under NAICS code 237990 and is identified as a forecast with a posted date of July 28, 2026. For environmental compliance, the project is filed under a Notice of Exemption dated July 27, 2026, and is categorized under CEQA Class 3 for the new construction of small structures, as it is determined that the work will not impact special status species or habitats. Primary points of contact for the project include Environmental Scientist Janine Beck and Environmental Program Manager Sara Lowry.

General Info

Install EV charging stations at Chrisman Pumping Plant in Kern County, California, within existing right-of-way.

Agency

California Water Resources, Department of

Place of Performance

Bakersfield, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Janine BeckEnvironmental Scientist
Sara LowryEnvironmental Program Manager

Full Description

Show more
Department of Water Resources (DWR) will have a contractor install electric vehicle chargers in parking stalls at Chrisman Pumping Plant within the San Joaquin Field Division. Electrical conduit installation will be trenched and routed from designated power source to new concrete pads. Charging stations will be mounted on the concrete pads. Staging will be on existing roadways and parking lots. Work is within DWR right of way.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 2 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS