Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

High Performance Battery Packs Using Domestic Materials for Compact Off-Highway Machines

Forecast
EPC-25-028State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Under agreement EPC-25-028, the California Energy Commission is providing a 1,959,011 dollar grant to Tyfast Energy Corp. to develop a high-performance battery pack utilizing lithium vanadium oxide technology. This technology is designed to provide high-rate charge and discharge, extended cycle life, and the ability to operate in below-freezing temperatures. The primary objective is to fabricate a battery pack that demonstrates these capabilities to original equipment manufacturer customers who develop off-highway compact equipment. The project is expected to benefit these manufacturers as well as the end users of the equipment, including ratepayers of electric Investor-Owned Utilities in California. The project is based in San Diego, California, with specific activities divided between battery research and cell development at 8909 Kenamar Drive, battery pack testing at 3183 Matthews Ln in La Jolla, and various other technology testing locations. The project has been granted a California Environmental Quality Act Notice of Exemption under sections 15301 and 15306, as it involves basic research and minor alterations to existing facilities with no significant environmental impact. Administrative oversight is managed by Energy Commission Specialist Jemar Roble Tan, with Haodong Liu serving as the Project Manager for Tyfast Energy Corp.

General Info

CEC grants Tyfast Energy $1,959,011 to develop high-performance lithium vanadium oxide battery packs.

Place of Performance

8909 Kenamar Drive, Suite 102, San Diego, CA, 92121

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
Under agreement EPC-25-028, the California Energy Commission will provide a $1,959,011 grant to Tyfast Energy Corp. to help fund the development of a high-performance battery pack using Tyfast's lithium vanadium oxide (LVO) technology that has been validated with third party testing to deliver high- rate charge and discharge, extended cycle life, and the ability to cycle below freezing temperatures. The goal of these efforts is to fabricate a battery pack to demonstrate the high-performance capabilities of the LVO technology to potential original equipment manufacturer customers developing off-highway compact equipment. Beneficiaries will include manufacturers of off-highway compact equipment who purchase the future technology, and those who buy and use such products, including ratepayers of the electric Investor-Owned Utilities in California.

Similar Contracts

Same NAICS industry code

More opportunities from California → Energy Commission

Same awarding agency

NAICS: 541715
SLED
Advanced Energy-efficient and Fire-resistive Envelope Systems Utilizing Vacuum Insulation for Manufactured Homes (REVISED)
Solicitation # EPC-19-043
The California Energy Commission has awarded a contract for the project titled Advanced Energy-efficient and Fire-resistive Envelope Systems Utilizing Vacuum Insulation for Manufactured Homes. This research initiative aims to demonstrate the effectiveness of advanced insulation and air sealing technologies, specifically vacuum insulated panels, to improve the overall energy performance of all-electric manufactured accessory dwelling units. The project begins with laboratory testing in Berkeley, California, to evaluate thermal performance, followed by the design and construction of up to three prototype single-family homes. These prototype units will be built in Altadena, Los Angeles County, on lots previously affected by the 2025 fires. Managed by the Energy Commission with project oversight from Dr. Kaushik Biswas and Jeanie Mar, the initiative focuses on utilizing prefabricated envelope systems and state-of-the-art air sealing to benefit current and future manufactured home communities. The project has been granted a CEQA Notice of Exemption, as the laboratory research and prototype construction are determined to have no significant environmental impact. This comprehensive effort combines theoretical lab validation with real-world application to advance energy efficiency and fire resistance in manufactured housing.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS