Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

LA PLAZA REHABILITATION B49

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Europe Africa CentralView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Europe Africa Central
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Europe Africa Central
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project Title and Objective: 1. Renovate existing areas within La Plaza (Building #49) to modernize the space and improve customer experience. The facility will be used as an all hands club, to include a slot room, bar area, dining room, sales counter for food sales and back entertainment/party room. Detailed Project Description: 1. Utilizing existing restroom space, but completely overhaul both men’s and women’s restrooms to include new: a. Fixtures (toilets, sinks, faucets) b. Stall dividers and doors. c. Tile flooring d. Built in paper product dispensers (toilet paper, paper towel) and wall-mounted trash cans e. Hand dryers (two per restroom) f. Add a baby changing station to both men’s and women’s g. Inspect and flush/clear current piping to eliminate constant sewage smell coming from restrooms 2. Utilizing existing bar space to: a. Remove carpet and replace with hard flooring surface (tile or wood laminate) b. Remove large counter top keg reefer c. Either Rebuild front bar (due to hold from keg reefer) or install government provided bar. Contractor will be responsible for removing and disposing of old bar d. Improve lighting, creating better ambiance and consistent illumination throughout. 3. Utilizing existing slot room space to: a. Remove and replace carpet in Bar area and slot room area as one continuous b. Upgrade power and install new GFCI electrical outlets for specified current/projected machine requirements c. Remove wood paneling and paint walls 4. Utilizing existing back room space to: a. Replace flooring. Tile or wood laminate preferred. b. Repair holes and damage to walls then Prime and paint walls c. Replace doors that lead to storage areas (on right and left of back room entrance). Emergency exit panic bars and be able to secure when facility is closed d. Install a doo ... NOTE: description has been truncated, please see Project Note for full description.