Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

MAGIC - Microgrids for Advanced Grid Interaction and Control

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The MAGIC project, titled Microgrids for Advanced Grid Interaction and Control, is a California Energy Commission initiative focused on advancing the integration and performance of distributed energy systems through software configuration, controller interoperability, and communication protocol implementation. Key technical activities include deploying and testing the IEEE 2030.5 and IEEE 1815.2 communication standards to enable seamless energy management between photovoltaic systems, battery energy storage, and microgrid control platforms. The project will conduct comprehensive load management testing and real-world field demonstrations on existing infrastructure in Los Angeles, California, to validate system interoperability and grid responsiveness under dynamic conditions. The work is designed to enhance grid resilience and accelerate the adoption of smart microgrid technologies. The project is forecasted to be posted on June 30, 2026, with performance centered at the 90022 ZIP Code in Los Angeles. Primary point of contact is Zoe Marshall, Utilities Engineer at the California Energy Commission, reachable via phone and email, while Susana Arrechea serves as Project Manager for the partnering organization. This initiative is not subject to a specific set-aside classification and is intended to support California’s broader objectives in modernizing the electric grid through clean, distributed energy resources. No solicitation number has been assigned at this stage, and interested parties should monitor the provided public link for future updates and procurement opportunities.

General Info

MAGIC project deploys IEEE standards to test microgrid interoperability and grid resilience in Los Angeles through real-world demonstrations.

Agency

California → Energy Commission

NAICS

541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)View NAICS

Place of Performance

Los Angeles, CA, 90022

Set-Aside

NONE

Documents

(1)

05_NOE_CEQA_NewSunRoad Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Energy Commission
Contacts2 people available
OfficeN/A
Organization / Agency
California → Energy Commission
Office AddressN/A
Contacts
Zoe MarshallUtilities Engineer
Susana ArrecheaProject Manager

Full Description

Show more
The project activities consist of software integration and configuration, controller interoperability and certification, communication protocol implementation (IEEE 2030.5, IEEE 1815.2), load management testing, and field demonstrations on existing photovoltaic, battery energy-storage, and microgrid control systems.

Similar Contracts

Same NAICS industry code

NAICS: 541715
New
Federal
NextSTEP-3 Appendix B: Moon Base Demonstrations
Solicitation # M2M-MSFC-0001
The solicitation for NextSTEP-3 Appendix B: Moon Base Demonstrations, issued under solicitation number 80MSFC26R0003 by NASA Marshall Space Flight Center, seeks industry-led demonstrations to advance the development of a permanent lunar base at the Moon’s South Pole, aligning with national space policy goals of sustained lunar presence and deep space exploration readiness. This initiative targets technology readiness levels 6 and above to bridge the gap between innovation and operational mission needs, with an emphasis on architectural studies, risk reduction, and capability maturation rather than hardware production. The procurement employs a two-step process: initial White Paper submissions followed by invited full proposals under a Multi-Award Task Order Contract (MATOC) structure, with all awards structured as Firm-Fixed-Price contracts featuring performance-based milestone payments. The solicitation operates under a dual-path approach, combining Directed-Topic Calls that address specific, evolving mission needs with Open-Topic Calls that invite broader, unanticipated innovations—though submissions duplicating Directed-Topic concepts will be deemed ineligible. Evaluation is based on a non-trade-off, best-value selection process where Technical Capability (including Capability and Past Performance) is weighted at 1,000 points and must meet minimum thresholds for eligibility, while Price is assessed solely for reasonableness and completeness and does not factor into ranking. Proposals must adhere to strict formatting rules, including page limits and submission as a single searchable PDF, with key personnel qualifications, organizational conflict of interest plans, and intellectual property disclosures required as attachments. All contractors must maintain active SAM.gov registration, submit required certifications and representations, and comply with NASA-specific clauses related to data rights, payments, changes, subcontracting, whistleblower protections, and safety and liability waivers. Performance will be conducted under the NASA FAR Supplement, with invoicing required through the NASA Shared Services Center and all delivery and inspection terms left intentionally unspecified, reinforcing the analytical nature of deliverables—reports, models, simulations, and feasibility studies—rather than physical products. The contracting office at Huntsville, Alabama, remains the point of contact, with questions directed to the designated Contracting Officer, and submissions must be completed by the stated deadline to remain valid.
NASA Marshall Space Flight Center

POSTED

about 10 hours ago

DEADLINE

in 10 days
View Details