Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

New Headworks Building Construction

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project encompasses the renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. To maintain center operations, contractors must utilize a phased sequencing approach, renovating one dormitory at a time. All work must comply with ADA, OSHA, and National Electrical Code standards, and contractors are responsible for the daily off-site disposal of all debris. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, and proof of current Vermont state professional licensing and insurance. The award will not be based solely on the lowest bid, as ETR will evaluate technical alignment with the scope of work to minimize future change orders. Winning bidders must maintain active registration in SAM.gov and provide a Unique Entity ID. The contract incorporates various FAR clauses, including requirements for the Davis-Bacon Act, anti-lobbying certifications, and combating trafficking in persons. Payment terms are net 30 days, contingent upon the submission of a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 10 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract entails the demolition of existing headworks infrastructure and the construction of a new 2,000 square foot headworks building, with work to be performed under a subcontract arrangement through the Vermont Department of Economic Development. The project is classified under NAICS code 236220, indicating it falls within the nonresidential building construction category, and the timeline requires bids to be submitted by August 19, 2026, with the solicitation posted on July 21, 2026. No set-aside provisions are specified, and while the precise location of performance is not detailed, the overseeing agency is the Vermont office of the Department of Economic Development. Interested parties must submit proposals via the provided state bid portal before the deadline, and all contractual obligations will be managed under the terms of a subcontract as referenced in the solicitation.

General Info

Demolish headworks, build 2,000 sq ft facility via subcontract, bids due August 19, 2026, Vermont oversight.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of Contract No. 1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of Barre - Wastewater Treatment Facility Headworks Upgrade

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Demolition of existing headworks and construction of a new 2,000 sq. ft. headworks building.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 485991
New
SLED
RFP_FSD_Transportation_9.11.26
Solicitation # FSD-Transportation-9.11.26
The Vermont Agency of Human Services, Department for Children and Families (DCF), Family Services Division is seeking to establish contracts with one or more providers to deliver Standard Transportation and Supported Family Time services for children and youth in state custody. These services include 24/7 transportation to schools, appointments, and visitations, as well as the provision of safe environments for supported family time with guidance and modeling for parents. While services are required statewide and potentially out-of-state, there is a specific need for contractors in the Bennington, Brattleboro, and Springfield districts. The period of performance is scheduled from January 1, 2027, through December 31, 2031, with options for three additional one-year extensions. Awards will be made based on the best interest of the State, with preference given to resident bidders and those promoting clean energy. Evaluation criteria include the bidder's project approach, five-year experience in transportation or supported family time, geographic reach, and previous experience with DCF. Selected contractors must ensure vehicles meet Vermont inspection standards and provide documentation of services to state workers within 30 days of contact. Payment terms are Net 30 days following the submission of detailed monthly invoices. The contract includes strict compliance requirements regarding non-discrimination, conflict of interest disclosures, and worker classification reporting for bids exceeding 250,000 dollars.
Special Needs Transportation

POSTED

about 22 hours ago

DEADLINE

in 6 days
View Details
NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

2 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS