Santa Maria Wastewater Treatment Plant Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Santa Maria is advancing a major infrastructure initiative to expand and modernize its existing Wastewater Treatment Plant located at 601 Black Road, California 93458, to meet future demand, ensure long-term operational reliability, and comply with evolving regulatory effluent discharge standards. The project follows a comprehensive 35-year Wastewater Treatment Plant Master Plan that supersedes the 1993 version and outlines a phased approach, beginning with near-term preparatory actions, followed by Phase 1 improvements, and ultimately Phase 2 enhancements. Expansion will occur on adjacent land to the east and southeast of the current facility, including the construction of six new percolation ponds covering approximately 42 acres. The plant will continue 24/7 operations throughout construction and beyond, with staffing increasing from 14 to 25 full-time employees to support expanded operations and_collections functions. Regulatory compliance is central to the project, requiring adherence to requirements set by the Regional Water Quality Control Board, State Water Resources Control Board, Santa Barbara County Air Pollution Control District, CUPA, and Cal/OSHA, with additional focus on mitigating impacts to air quality, biological resources, cultural resources, and tribal heritage. The project’s timeline is tied to a public review period from July 21, 2026, to August 19, 2026, with the City of Santa Maria acting as the lead agency and primary contracting authority. No formal solicitation number, contract value, pricing schedule, or procurement-specific evaluation criteria are available in the provided materials, nor are there identified contract clauses, inspection standards, packaging requirements, or certification obligations typically found in federal acquisition documents. Key contacts include Shad S. Springer, Director of Utilities, and Pam Reading, Environmental Planning Principal, who serve as primary points of coordination. The project is classified as a forecast with a NAICS code of 237990, indicating it is an other heavy and civil engineering construction project. There is no indication of federal funding, federal acquisition regulation application, or formal contracting vehicle such as FFP or IDIQ, suggesting this is a locally administered capital improvement initiative governed primarily by state and local environmental and municipal codes rather than federal procurement rules.

General Info

Santa Maria to expand wastewater plant with 42-acre ponds, hiring 25 staff, complying with state environmental regulations.

Agency

California → City of Santa Maria

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Black Road, Main Street, Stowell Road, Santa Maria, CA, 93458

Set-Aside

NONE

Documents

(4)

IS_MND

PDF

Santa Maria Wastewater Treatment Plant Improvements Project Notice of Completion

PDFnotice-of-completion

NOA - Santa Maria Wastewater Treatment Plant Improvements Project

PDFspecial-notice

Santa Maria Wastewater Treatment Plant Improvements Project Summary Form

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Maria
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Santa Maria
Office AddressN/A
Contacts
Shad S. SpringerDirector of Utilities
Pam ReadingEnvironmental Planning Principal

Interested Companies (1)

Show more
LSA
San Luis Obispo, CA

Full Description

Show more
The City of Santa Maria (City) proposes to expand and update its existing WWTP to accommodate anticipated growth, provide long-term reliable treatment, and adhere to applicable regulatory requirements, including the updated effluent discharge limits. The project would modify the existing WWTP currently owned and operated by the City at 601 Black Road, Santa Maria, California 93458, and expand onto adjacent land to the east and southeast. The City, in coordination with Carollo Engineers, prepared a Wastewater Treatment Plant Master Plan to provide a 35-year road map for the City’s wastewater treatment, disposal, and reuse needs. The Wastewater Treatment Plant Master Plan updates, replaces, and expands on the existing 1993 Master Plan. As identified in the Wastewater Treatment Plant Master Plan, the proposed project would include three components: (1) near-term projects that must be completed prior to the initiation of Phase 1; (2) Phase 1 Improvements; and (3) Phase 2 Improvements. With implementation of the Phase 1 Improvements, the City anticipates that an additional 11 full-time employees would be needed, for a total of 25 dedicated WWTP and collections staff. The WWTP would continue to operate 24 hours per day, 7 days per week.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and pipe installation, as well as structural and finishing tasks including masonry, welding, roofing, electrical work, and interior finishes. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a response deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) and administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and other small business enterprises, requiring evidence of certification from recognized agencies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the scope of work involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal south of Oahu, vegetation clearance, and repairs to the revetted mole, including stone rework and filling voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB concerns, with a specific price evaluation preference for HUBZone small businesses. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Key requirements for a responsive bid include active SAM registration, a bid guarantee, and the submission of SF 1442. The contractor must provide key personnel, including a Project Manager and Site Safety and Health Officer, and adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 6 hours ago

DEADLINE

in 25 days
View Details