Santa Maria Wastewater Treatment Plant Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Santa Maria is advancing a major infrastructure initiative to expand and modernize its existing Wastewater Treatment Plant located at 601 Black Road, California 93458, to meet future demand, ensure long-term operational reliability, and comply with evolving regulatory effluent discharge standards. The project follows a comprehensive 35-year Wastewater Treatment Plant Master Plan that supersedes the 1993 version and outlines a phased approach, beginning with near-term preparatory actions, followed by Phase 1 improvements, and ultimately Phase 2 enhancements. Expansion will occur on adjacent land to the east and southeast of the current facility, including the construction of six new percolation ponds covering approximately 42 acres. The plant will continue 24/7 operations throughout construction and beyond, with staffing increasing from 14 to 25 full-time employees to support expanded operations and_collections functions. Regulatory compliance is central to the project, requiring adherence to requirements set by the Regional Water Quality Control Board, State Water Resources Control Board, Santa Barbara County Air Pollution Control District, CUPA, and Cal/OSHA, with additional focus on mitigating impacts to air quality, biological resources, cultural resources, and tribal heritage. The project’s timeline is tied to a public review period from July 21, 2026, to August 19, 2026, with the City of Santa Maria acting as the lead agency and primary contracting authority. No formal solicitation number, contract value, pricing schedule, or procurement-specific evaluation criteria are available in the provided materials, nor are there identified contract clauses, inspection standards, packaging requirements, or certification obligations typically found in federal acquisition documents. Key contacts include Shad S. Springer, Director of Utilities, and Pam Reading, Environmental Planning Principal, who serve as primary points of coordination. The project is classified as a forecast with a NAICS code of 237990, indicating it is an other heavy and civil engineering construction project. There is no indication of federal funding, federal acquisition regulation application, or formal contracting vehicle such as FFP or IDIQ, suggesting this is a locally administered capital improvement initiative governed primarily by state and local environmental and municipal codes rather than federal procurement rules.

General Info

Santa Maria to expand wastewater plant with 42-acre ponds, hiring 25 staff, complying with state environmental regulations.

Agency

California → City of Santa Maria

Place of Performance

Black Road, Main Street, Stowell Road, Santa Maria, CA, 93458

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Maria
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Santa Maria
Office AddressN/A
Contacts
Shad S. SpringerDirector of Utilities
Pam ReadingEnvironmental Planning Principal

Interested Companies (1)

LSARoseville, CA

Full Description

Show more
The City of Santa Maria (City) proposes to expand and update its existing WWTP to accommodate anticipated growth, provide long-term reliable treatment, and adhere to applicable regulatory requirements, including the updated effluent discharge limits. The project would modify the existing WWTP currently owned and operated by the City at 601 Black Road, Santa Maria, California 93458, and expand onto adjacent land to the east and southeast. The City, in coordination with Carollo Engineers, prepared a Wastewater Treatment Plant Master Plan to provide a 35-year road map for the City’s wastewater treatment, disposal, and reuse needs. The Wastewater Treatment Plant Master Plan updates, replaces, and expands on the existing 1993 Master Plan. As identified in the Wastewater Treatment Plant Master Plan, the proposed project would include three components: (1) near-term projects that must be completed prior to the initiation of Phase 1; (2) Phase 1 Improvements; and (3) Phase 2 Improvements. With implementation of the Phase 1 Improvements, the City anticipates that an additional 11 full-time employees would be needed, for a total of 25 dedicated WWTP and collections staff. The WWTP would continue to operate 24 hours per day, 7 days per week.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS